- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
There are outstanding changes not yet made by the legislation.gov.uk editorial team to The M20 Junction 10a Development Consent Order 2017. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
Commencement Information
I1Sch. 3 Pt. 5 in force at 22.12.2017, see art. 1
(1) Parish(es) | (2) Road name, number and length | (3) Speed Limit |
---|---|---|
Ashford, Mersham | A20, Hythe Road. From a point 40 metres north west of the M20 Junction 10a circulatory carriageway along its length to where it joins the M20 Junction 10a circulatory carriageway for a total distance of 40 metres. As shown on sheet 2 of the speed limit plans. | 40 miles per hour |
Mersham | A20, Hythe Road. From where the A20 diverges/merges with the M20 Junction 10a circulatory carriageway along its length to a point 45 metres east of this location. As shown on sheet 2 of the speed limit plans. | 40 miles per hour |
Mersham | A20, Hythe Road. From a point 45 metres east of the location where the A20 diverges/merges with the M20 Junction 10a circulatory carriageway to a point 11 metres from the centre line of the junction of the A20 with Bockham Lane, a length of 386 metres. As shown on sheet 2 of the speed limit plans. | 50 miles per hour |
Mersham | M20 Junction 10a circulatory carriageway. For the whole length of the circulatory carriageway around the M20 Junction 10a roundabout, a length of 490 metres. As shown on sheets 2 and 3 of the speed limit plans. | 40 miles per hour |
Ashford, Mersham | M20 eastbound off slip onto Junction 10a. From the start of the diverge with the M20 main carriageway along its length to the point where it merges with the new Junction 10a circulatory carriageway, a length of 307 metres. As shown on sheets 1 and 2 of the speed limit plans. | 70 miles per hour |
Ashford, Mersham | M20 eastbound on slip onto the M20 from Junction 10a. From the start of the diverge from the new Junction 10a circulatory carriageway along its length to its merge with the M20 main carriageway, a length of 379 metres. As shown on sheet 2 of the speed limit plans. | 70 miles per hour |
Mersham | M20 westbound off slip onto Junction 10a. From the start of the diverge with the M20 main carriageway along its length to its merge with the new Junction 10a circulatory carriageway, a length of 340 metres. As shown on sheet 2 of the speed limit plans. | 70 miles per hour |
Mersham | M20 westbound on slip onto the M20 from Junction 10a. From the start of the diverge from the new Junction 10a circulatory carriageway along its length to its merge with the M20 main carriageway, a length of 463 metres. As shown on sheets 1 and 3 of the speed limit plans. | 70 miles per hour |
Mersham, Sevington | Kingsford Street. From a point 46 metres south-west of the current junction between Kingsford Street and Highfield Lane for a length of 137 metres to the point where the newly re-aligned road joins existing Kingsford Street. As shown on sheet 2 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option A only. New A2070 link road (westbound). From the diverge of the link road from the M20 Junction 10a circulatory carriageway heading west along its length to its merge with the new A2070 roundabout circulatory carriageway for a distance of 722 metres. As shown on sheets 2 and 3 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option A only. New A2070 link road (eastbound). From the diverge of the link road from the new A2070 roundabout circulatory carriageway heading east along its length to its merge with the M20 Junction 10a circulatory carriageway for a distance of 693 metres. As shown on sheets 2 and 3 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (westbound). From the diverge of the link road from the M20 Junction 10a circulatory carriageway heading west along its length to its merge with the new Stour Park roundabout circulatory carriageway for a distance of 363 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (westbound). From the diverge of the link road from the new Stour Park roundabout circulatory carriageway heading west along its length to its merge with the new A2070 roundabout circulatory carriageway for a distance of 288 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (eastbound). From the diverge of the link road from the new A2070 roundabout circulatory carriageway heading east along its length to its merge with the new Stour Park roundabout circulatory carriageway for a distance of 288 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New A2070 link road (eastbound). From the diverge of the link road from the new Stour Park roundabout circulatory carriageway heading east along its length to its merge with the M20 Junction 10a circulatory carriageway for a distance of 338 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Mersham, Sevington | In the event of construction of the A2070 Option B only. New Stour Park roundabout circulatory carriageway. For the whole length of the circulatory carriageway around the new Stour Park roundabout, a length of 200 metres. As shown on sheet 4 of the speed limit plans. | 40 miles per hour |
Sevington | New A2070 roundabout circulatory carriageway. For the whole length of the circulatory carriageway around the new A2070 roundabout, a length of 200 metres. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Ashford, Sevington | A2070 Bad Munstereifel Road (southbound). From a point 74 metres south of the diverge from the M20 Junction 10 circulatory carriageway along its length to where it joins the A2070 roundabout circulatory carriageway for a total distance of 370 metres. As shown on sheets 1 and 3 of the speed limit plans. | 40 miles per hour |
Ashford, Sevington | A2070 Bad Munstereifel Road (northbound). From where it leaves the A2070 roundabout circulatory carriageway along its length to a point 70 metres south of the merge to the M20 Junction 10 circulatory carriageway for a total distance of 394 metres. As shown on sheets 1 and 3 of the speed limit plans. | 40 miles per hour |
Sevington | A2070 Bad Munstereifel Road (southbound). From where it leaves the A2070 roundabout circulatory carriageway along its length to a point 27 metres south of the centreline of the junction with Church Road for a total distance of 394 metres. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Sevington | A2070 Bad Munstereifel Road (northbound). From a point 27 metres south of the centreline of the junction with Church Road along its length to where it joins the A2070 roundabout circulatory carriageway for a total distance of 395 metres. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Sevington | Barrey Road. From the junction with the A2070 to a point 46 metres to the west. As shown on sheet 3 of the speed limit plans. | 40 miles per hour |
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys