Articles 15 and 25
SCHEDULE 4E+W+SPERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS & PROVISION OF NEW HIGHWAYS AND PRIVATE MEANS OF ACCESS
In relating this Schedule to the rights of way and access plans, the provisions described in this Schedule are shown on the rights of way and access plans in the following manner—
(a)Existing highways to be stopped up, as described in column (2) of Part 1 and Part 2 of this Schedule, are shown by thick black diagonal hatching (as shown in the key on the rights of way and access plans) over the extent of the area to be stopped up, which is described in column (3) of Part 1 and Part 2 of this Schedule.
(b)New highways which are to be substituted for a highway to be stopped up (or which are otherwise to be provided), as are included in column (4) of Part 2 of this Schedule, are shown by red cross-hatching (for motorways and trunk roads), blue cross-hatching (for other classified roads and highways) and solid blue shading (for footpaths, footways and cycle tracks) (as shown in the key on the rights of way and access plans) and are given a reference label (a capital letter in a circle) and will be a road unless the word ‘footpath’, ‘bridleway’, ‘footway’ or ‘cycle track’ appears beneath its reference letter in column (4) of Part 2 of this Schedule.
(c)Private means of access to be stopped up, as described in column (2) of Parts 3 and 4 of this Schedule, are shown by solid black shading (as shown in the key on the rights of way and access plans) over the extent of stopping up described in column (3) of Parts 3 and 4 of this Schedule, and are given a reference label (a lower case letter in a circle).
(d)New private means of access to be substituted for a private means of access to be stopped up (or which are otherwise to be provided), as are included in column (4) of Part 3 of this Schedule, are shown by black line hatching (as shown in the key on the rights of way and access plans) and are given a reference label (a number in a circle).
PART 1E+W+SHIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
Commencement Information
I1Sch. 4 Pt. 1 in force at 22.12.2017, see art. 1
(1) Area | (2) Highway to be stopped up | (3) Extent of stopping up |
---|---|---|
Mersham | Highfield Lane overbridge | From the junction with Kingsford Street to the junction with the A20 Hythe Road, a distance of 170 metres, shown on sheet 2 of the rights of way and access plans. |
Ashford | Public right of way AU63C | From its crossing of the Old Mill Stream to where it meets public right of way AU53, a distance of 177 metres, shown on sheets 1 and 3 of the rights of way and access plans. |
Sevington | Public right of way AE337A | From where it crosses the new A2070 link road to where it meets the Old Mill Stream, a distance of 260 metres, shown on sheet 3 of the rights of way and access plans. |
Ashford | Public right of way AU65 | From its crossing of the Old Mill Stream to where it meets public right of way AU53 to the north, a distance of 172 metres, shown on sheets 1 and 3 of the rights of way and access plans. |
Ashford | Public right of way AU53 | From where it crosses the Old Mill Stream to where it meets the M20 Junction 10 circulatory carriageway, a distance of 647 metres, shown on sheet 1 of the rights of way and access plans. |
Mersham | Public right of way AE636 | From where it meets the Old Mill Stream to where it meets Highfield Lane, a distance of 288 metres, shown on sheets 1, 2 and 3 of the rights of way and access plans. |
Sevington | Public Right of Way AE338 | From where it crosses the new A2070 link road to where it meets the Old Mill Stream, a distance of 120 metres, shown on the rights of way and access plans sheet 3. |
Sevington | Public Right of Way AE339 | From the Barrey Road/Church Road junction west of the A2070 Bad Munstereifel Road to where it meets Church Road again, east of the A2070 Bad Munstereifel Road, a distance of 184 metres, shown on sheet 3 of the rights of way and access plans. |
PART 2E+W+SHIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED
Commencement Information
I2Sch. 4 Pt. 2 in force at 22.12.2017, see art. 1
(1) Area | (2) Highway to be stopped up | (3) Extent of stopping up | (4) New highway to be substituted/provided |
---|---|---|---|
Mersham | A20 Hythe Road | From the junction with Highfield Lane to a point 157 metres west on the existing A20, shown on sheet 2 of the rights of way and access plans. | Reference C Re-aligned A20 Hythe Road west from the M20 Junction 10a circulatory carriageway shown on sheets 1 and 2 of the rights of way and access plans. |
Mersham | A20 Hythe Road | From the junction with Highfield Lane to a point 190 metres east on the existing A20, shown on sheet 2 of the rights of way and access plans. | Reference D Re-aligned A20 Hythe Road east from the M20 Junction 10a circulatory carriageway shown on sheets 1 and 2 of the rights of way and access plans. |
Ashford | M20 Junction 10 eastbound on slip | From the diverge from the M20 Junction 10 main circulatory carriageway to the merge with the M20 eastbound main carriageway shown on sheet 1 of the rights of way and access plans. | Reference E M20 Junction 10a eastbound on slip shown on sheet 2 of the rights of way and access plans. |
Ashford | M20 Junction 10 westbound off slip | From the diverge from the M20 westbound main carriageway to the merge with the M20 Junction 10 circulatory carriageway shown on sheet 1 of the rights of way and access plans. | Reference F M20 Junction 10a westbound off slip shown on sheet 2 of the rights of way and access plans. |
Mersham | Kingsford Street and Highfield Lane | From a point on Kingsford Street 100 metres east of the junction with Highfield Lane, west to the junction with Highfield Lane and then south on Highfield Lane for a distance of 46 metres, shown on sheet 2 of the rights of way and access plans. | Reference I Re-aligned Kingsford Street and Highfield Lane shown on sheet 2 of the rights of way and access plans. |
Sevington, Mersham | A2070 Bad Munstereifel Road (southbound) | From a point 220 metres south of the M20 Junction 10 circulatory carriageway to a point 68 metres north of the junction with Church Road, a distance of 550 metres, shown on sheet 3 of the rights of way and access plans. | References K, L and M Re-aligned A2070 Bad Munstereifel Road and new A2070 roundabout circulatory carriageway shown on sheet 3 of the rights of way and access plans. |
Sevington | A2070 Bad Munstereifel Road (northbound) | From a point 220 metres south of the M20 Junction 10 circulatory carriageway to a point 68 metres north of the junction with Church Road, a distance of 550 metres, shown on sheet 3 of the rights of way and access plans. | References K, L and M Re-aligned A2070 Bad Munstereifel Road and new A2070 roundabout circulatory carriageway shown on sheet 3 of the rights of way and access plans. |
Sevington | Church Lane overbridge | From point H to point G on sheet 3 of the rights of way and access plans. | Reference R A length of new cycle track (with a right of way on foot) to be known as the new Church Road footbridge shown on sheet 3 of the rights of way and access plans. |
Sevington, Mersham | - | - | Reference A M20 Junction 10a eastbound off slip shown on sheet 1 of the rights of way and access plans. |
Sevington, Mersham | - | - | Reference B M20 Junction 10a westbound on slip shown on sheets 1 and 3 of the rights of way and access plans. |
Sevington, Mersham | - | - | Reference G New M20 Junction 10a circulatory carriageway shown on sheets 2 and 3 of the rights of way and access plans. |
Mersham | - | - | Reference H A length of new cycle track (with a right of way on foot) to be known as the new Kingsford Street footbridge shown on sheet 2 of the rights of way and access plans. |
Sevington, Mersham | - | - | Reference J In the event of construction of the A2070 Option A only, a new length of highway from the M20 Junction 10a circulatory carriageway to the new A2070 roundabout shown on the rights of way and access plans sheets 2 and 3. |
Sevington | - | - | Reference N In the event of construction of the A2070 Option B only, a new length of highway from the M20 Junction 10a circulatory carriageway to the new Stour Park roundabout circulatory carriageway, shown on sheet 4 of the rights of way and access plans. |
Sevington, Mersham | - | - | Reference O In the event of construction of the A2070 Option B only, a new Stour Park roundabout circulatory carriageway, shown on sheet 4 of the rights of way and access plans. |
Sevington, Mersham | - | - | Reference P In the event of construction of the A2070 Option B only, a new length of highway from the new Stour Park roundabout circulatory carriageway to the new A2070 roundabout circulatory carriageway, shown on sheet 4 of the rights of way and access plans. |
PART 3E+W+SPRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED
Commencement Information
I3Sch. 4 Pt. 3 in force at 22.12.2017, see art. 1
(1) Area | (2) Private means of access to be stopped up | (3) Extent of stopping up | (4) New private means of access to be substituted or provided |
---|---|---|---|
Mersham | - | - | Reference 1 A new private access to pond 3 from a point on the A20 Hythe Road, 60 metres north-west of the merge with the M20 Junction 10A circulatory carriageway, to where it meets pond 3, a distance of 75 metres, as shown on sheets 1 and 2 of the public rights of way and access plans. |
Mersham | Reference c Access to field north of the A20 Hythe Road | At a point 60 metres north west of the junction with Highfield Lane as shown on sheet 2 of the rights of way and access plans. | Reference 2 A new private access to field north of the A20 Hythe Road 95 metres from the junction with Highfield Lane as shown on sheet 2 of the rights of way and access plans. |
Sevington | Reference f Access to field north of the Old Mill Stream and south of the M20 main carriageway | A length from its junction with the local road that joins Church Road, just north of the Church Road footbridge, to a point 45 metres south of the Old Mill Stream, a distance of 278 metres, as shown on sheet 3 of the rights of way and access plans. | Reference 3 A new private access to pond 2 and field north of the Old Mill Stream, from a point on the southbound carriageway of the A2070, 88 metres north of the A2070 roundabout, to the Old Mill Stream, a distance of 153 metres, as shown on the rights of way and access plans sheet 3. |
Sevington | - | - | Reference 4 A new private access to pond 1 from a point on the eastbound carriageway of the new A2070 link road, 370 metres west of the new M20 Junction 10a circulatory carriageway, to where it meets pond 1, a distance of 150 metres, as shown on the rights of way and access plans sheet 3. |
PART 4E+W+SPRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
Commencement Information
I4Sch. 4 Pt. 4 in force at 22.12.2017, see art. 1
(1) Area | (2) Private means of access to be stopped up | (3) Extent of stopping up |
---|---|---|
Mersham | Reference a Access to Sweatman Mowers from the A20 Hythe Road | At a point 200 metres north-west of the junction with Highfield Lane as shown on sheet 1 of the rights of way and access plans. |
Mersham | Reference b Access to the Wyevale Garden Centre from the A20 Hythe Road | At a point 110 metres north-west of the junction with Highfield Lane as shown on sheets 1 and 2 of the rights of way and access plans. |
Mersham | Reference d Access to field north of the A20 Hythe Road | At a point 140 metres south east of the junction with Highfield Lane as shown on sheet 2 of the rights of way and access plans. |
Sevington | Reference e Access to field from Kingsford Street | At a point 310 metres south east of the junction with Highfield Lane as shown on sheet 2 of the rights of way and access plans. |