xmlns:atom="http://www.w3.org/2005/Atom"
9. In Schedule 1A, after Table 1 insert—
1st April to 30th September 2017 | 1st October 2017 to 31st March 2018 | 1st April to 30th September 2018 | 1st October 2018 to 31st March 2019 | |
---|---|---|---|---|
Combined heat and power installation with total installed capacity of 2 kilowatts or less | 5.0 | 5.0 | 5.0 | 5.0” |