Certification of plans etc.

35.—(1) The undertaker must, as soon as reasonably practicable after the making of the Order, submit to the Secretary of State copies of–

(a)the book of reference (document ref: 4.3);

(b)the book of reference and land plans clarifications and errata (document ref:10.14);

(c)the Order limits drawing nos: 13-03-01/HOL/24/100-107/B1;

(d)the land plans drawing nos: 13-03-01/HOL/24/610-617/B1;

(e)the works plans drawing nos: 13-03-01/HOL/24/500-506/B1, 13-03-01/HOL/24/509/B1, 13-03-01/HOL/24/510/B2, 13-03-01/HOL/24/511/B1, 13-03-01/HOL/24/512/B2 and 13-03-01/HOL/24/513-514/B1;

(f)the street works and access plan drawing no.:13-03-01/HOL/24/413/B1;

(g)the environmental statement (document refs: 6.1-6.3);

(h)the environmental statement clarifications and errata (document ref: 10.13);

(i)the elevation drawing nos::

(i)13-03-01/HOL/24/236/B1;

(ii)13-03-01/HOL/24/270/B4, 13-03-01/HOL/24/271/B2, 13-03-01/HOL/24/272/B1, 13-03-01/HOL/24//273/B2 and 13-03-01/HOL/24/274/B1; and

(iii)13-03-01/HOL/24/278/B1;

(j)the seismic survey report (document ref: 9.1);

(k)the sub-surface safety assessment report (document ref: 9.2);

(l)the preliminary study of gas design capacity (document ref: 9.3);

(m)the landscaping plans drawing nos: 13-03-01/HOL/24/240-264/B1 and 13-03-01/HOL/24/266-268/B1;

(n)the statutory undertakers’ apparatus plan drawing no: 13-03-01/HOL/24/346/B1;

(o)the routing plan drawing no: 13-03-01/HOL/24/405/B1; and

(p)the draft CEMP and annexes 1 - 4 (document ref 6.5 rev4, August 2016),

for certification that they are true copies of the documents referred to in this Order.

(2) A plan or document so certified under paragraph (1) is admissible in any proceedings as evidence of the contents of the document of which it is a copy.