- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Pwynt Penodol mewn Amser (03/08/2017)
- Gwreiddiol (a wnaed Fel)
Version Superseded: 31/12/2020
Point in time view as at 03/08/2017.
There are currently no known outstanding effects for the The Recreational Craft Regulations 2017, SUPPLEMENTARY REQUIREMENTS FOR CERTAIN CONFORMITY ASSESSMENTS.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
49.—(1) Where an economic operator has a conformity assessment carried out on a product under Module B (EU-type examination) of Annex II to Decision 768/2008/EC in relation to a product, the conformity assessment must be carried out in the manner set out in Schedule 10.
(2) A production type may cover several versions of the assessed product, if—
(a)the differences between the versions of the product do not affect the level of safety and the other requirements concerning the performance of the product; and
(b)the different versions of the product are referred to in the corresponding EU-type examination certificate, if necessary by means of amendments to the original certificate.
(3) For the purposes of this regulation—
“production type” means an examination of the adequacy of the technical design of the watercraft through examination of the technical documentation specified in paragraph 3 of Schedule 10 and a specimen watercraft that is representative of the completed watercraft that is to be or has been produced by the manufacturer.
Commencement Information
I1Reg. 49 in force at 3.8.2017, see reg. 1
50.—(1) Where an economic operator has a conformity assessment carried out on a product under Module A1 (internal production control plus supervised product testing) of Annex II to Decision 768/2008/EC—
(a)the product checks must be carried out on at least one watercraft that is representative of the watercraft that is to be or has been produced by the manufacturer; and
(b)the requirements set out in Schedule 6 apply.
(2) The possibility, referred to in Modules A1 and C1 of Annex II of Decision 768/2008, of using an accredited in-house body to perform a conformity assessment under those modules is not applicable in relation to watercraft.
Commencement Information
I2Reg. 50 in force at 3.8.2017, see reg. 1
51. Where an economic operator has a conformity assessment carried out on a product under Module F (conformity to type based on product verification) of Annex II to Decision 768/2008/EC, the procedure set out in Schedule 7 applies.
Commencement Information
I3Reg. 51 in force at 3.8.2017, see reg. 1
52.—(1) This regulation applies where—
(a)an economic operator has a conformity assessment carried out on a watercraft under Module C (conformity to type based on internal production control) of Annex II of Decision 768/2008/EC;
(b)Module C is used to assess the conformity of the product with the exhaust emission requirements of these Regulations; and
(c)the manufacturer is not working under a relevant quality system as described in Module H of Annex II to Decision 768/2008/EC.
(2) A notified body chosen by the manufacturer must carry out product checks as required by Module C or have them carried out at random intervals to be determined by the notified body, in order to verify the quality of the internal checks on the product carried out under the manufacturer’s own checking measures.
(3) When the quality level appears unsatisfactory or when it seems necessary to verify the validity of the data presented by the manufacturer, the procedure set out in Schedule 8 applies.
Commencement Information
I4Reg. 52 in force at 3.8.2017, see reg. 1
53. The EU declaration of conformity for a product must—
(a)state that the product complies with the essential requirements;
(b)contain the elements specified in regulations 44 to 47 for the relevant conformity assessment in respect of the product; and
(c)be set out in accordance with the model structure set out in Schedule 4.
Commencement Information
I5Reg. 53 in force at 3.8.2017, see reg. 1
54.—(1) The CE marking must be affixed visibly, legibly and indelibly to the product.
(2) Where it is not possible or warranted, on account of the nature of a component to affix the CE marking in accordance with paragraph (1), the CE marking must be affixed to—
(a)the packaging; and
(b)the accompanying documents.
(3) Where the product referred to in paragraph (1)—
(a)is a watercraft, the CE marking must be affixed to the watercraft builder’s plate and mounted separately from the watercraft identification number; or
(b)is a propulsion engine, the CE marking must be affixed on the engine.
(4) The CE marking must be followed by the identification number of the notified body where—
(a)that body is involved in the production control phase of the conformity assessment under Modules A (internal production control), A1 (internal production control plus supervised product testing) or C (conformity to type based on internal production control) set out in Annex II of Decision 768/2008; or
(b)where a post construction assessment set out in Schedule 5 of these Regulations is being used.
(5) The identification number of the notified body must be affixed—
(a)by the notified body itself; or
(b)under the instructions of the notified body by the manufacturer.
Commencement Information
I6Reg. 54 in force at 3.8.2017, see reg. 1
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys