Article 2
In the administrative areas of Lancashire County Council, Wyre Council and Fylde Borough Council
A nationally significant infrastructure project as defined in sections 14 and 22 of the 2008 Act, and associated development as defined in section 115 of the 2008 Act, comprising:
Work No.1 – The construction and alteration of the mainline A585 Amounderness Way commencing at the Scheme limit and terminating at Skippool Junction, approximately 301 metres in length, including associated features such as embankments, additional structures and roadside furniture, as shown on Sheet 1 of the Works Plans.
Work No.2 – The construction of a non-motorised user pedestrian crossing facilities across left arm (A585 Amounderness Way) of Skippool Junction, approximately 96 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.3 – The diversion of utilities (United Utilities), approximately 176 metres in length, across Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.4 – The construction of the eastbound left turning lane (off-slip road), at Skippool Junction, approximately 158 metres in length from the A585 Amounderness Way onto the B5412 Skippool Road, as shown on Sheet 1 of the Works Plans.
Work No.5 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians), south west of Skippool Junction, approximately 57 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.6 – The diversion of utilities (Electricity North West), approximately 206 metres in length, across Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.7 – The diversion of utilities (United Utilities), approximately 57 metres in length, across Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.8 – The diversion of utilities (Electricity North West), approximately 105 metres in length, across Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.9 – The construction of the left turning lane from the A588 Breck Road onto the A585 (westbound), approximately 124 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.10 – The construction of pedestrian crossing facilities across the northern arm of Skippool Junction (B5412 Skippool Road), approximately 53 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.11 – The construction of pedestrian crossing facilities across the southern arm (A588 Breck Road) of Skippool Junction approximately 52 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.12 – The construction of an at-grade, signalised crossroad junction (Skippool Junction), tying in with the existing A588 Breck Road, the B5412 Skippool Road and the A585 Amounderness Way, including all associated widening works and retaining structures, approximately 186 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.13 – The construction of the left turning lane from the B5412 Skippool Road onto Breck Road, (eastbound), at Skippool Junction, approximately 128 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.14 – The construction of pedestrian crossing facilities across the eastern arm (A585 Breck Road) of Skippool Junction, approximately 90 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.15 – The diversion of utilities (British Telecommunications PLC), approximately 151 metres in length, across Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.16 – The diversion of utilities (Cadent), approximately 160 metres in length, across Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.17 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians) approximately 596 metres in length, commencing at a tie in point with the existing footway on the B5412 Skippool Road and terminating at the diverted Old Mains Lane, as shown on Sheet 1 of the Works Plans.
Work No.18 – The construction of the westbound, left turn lane at Skippool Junction, approximately 155 metres in length, from the A585 Breck Road, continuing onto the A588 Breck Road, heading southbound, as shown on Sheet 1 of the Works Plans.
Work No.19 – The construction and alteration of Breck Service Road, running parallel to the main A585 Breck Road, approximately 156 metres in length, including the stopping up of the east end entrance and the construction of a “hammerhead” turning area, as shown on Sheet 1 of the Works Plans.
Work No.20 – The construction of alterations to the existing private means of access, on the north side of A585 Breck Road, approximately 36 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.21 – The construction of a new section of A585 dual carriageway between Skippool Junction and Skippool Bridge Junction, approximately 444 metres in length, including associated features such as embankments, additional structures and roadside furniture, as shown on Sheet 1 of the Works Plans.
Work No.22 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians) commencing at the turning point into Breck Road access road and running for approximately 220 metres along the south side of Mains Lane, including pedestrian crossing facilities at Skippool Bridge Junction, as shown on Sheet 1 of the Works Plans.
Work No.23 – The construction of alterations to the existing private means of access on the north side of the A585 Breck Road, approximately 41 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.24 – The diversion of utilities (British Telecommunications PLC), approximately 90 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.25 – The construction of a new underbridge over Main Dyke, including all associated bridge foundations, widening, parapets and roadside furniture, approximately 34 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.26 – The diversion of utilities (Electricity North West), approximately 218 metres in length, running along Mains Lane and across Skippool Bridge Junction, as shown on Sheet 1 of the Works Plans.
Work No.27 - The diversion of utilities (Cadent), approximately 258 metres in length, running along Mains Lane and across Skippool Bridge Junction, as shown on Sheet 1 of the Works Plans.
Work No.28 – The construction of the eastbound A585 off-slip lane at Skippool Bridge Junction, approximately 163 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.29 – The construction of the diverted Old Mains Lane Road, approximately 225 metres in length and tying in with the existing Old Mains Lane alignment, as shown on Sheet 1 of the Works Plans.
Work No.30 – The diversion of utilities (Electricity North West), approximately 384 metres in length, running across Skippool Bridge Junction, as shown on Sheet 1 of the Works Plans.
Work No.31 – The diversion of utilities (Electricity North West), approximately 379 metres in length, running along diverted Old Mains Lane and across the north side of A585 Breck Road, as shown on Sheet 1 of the Works Plans.
Work No.32 – The diversion of utilities (British Telecommunications PLC), approximately 357 metres in length, running along diverted Old Mains Lane and across to the north side of the A585 Breck Road, as shown on Sheet 1 of the Works Plans.
Work No.33 – The diversions of utilities (British Telecommunications PLC), approximately 728 metres in length, running around Skippool Bridge Junction, as shown on Sheet 1 of the Works Plans.
Work No.34 – The diversion of utilities (United Utilities), approximately 607 metres in length, running from the northern arm of the Skippool Junction along A585 Breck Road and terminating on the diverted Old Mains Lane, as shown on Sheet 1 of the Works Plans.
Work No.35 – The construction of an at-grade, signalised junction (Skippool Bridge Junction), tying in with the existing A585 Mains Lane, and the new A585 bypass, including all associated widening works and retaining structures, approximately 111 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.36 - The diversion of utilities (United Utilities), approximately 216 metres in length, around Skippool Bridge Junction, as shown on Sheet 1 of the Works Plans.
Work No.37 – The construction of the eastbound, left turn lane at Skippool Bridge Junction, approximately 34 metres in length, from the A585 Mains Lane, as shown on Sheet 1 of the Works Plans.
Work No.38 – The construction of an environmental bund (false cutting), approximately 369 metres in length, running along the north side of the new A585 dual carriageway, as shown on Sheet 1 of the Works Plans.
Work No.39 – The construction of an environmental bund (false cutting), approximately 363 metres in length, running along the south side of the new A585 dual carriageway, as shown on Sheet 1 of the Works Plans.
Work No.40 – The construction of a section of the new A585 dual carriageway, approximately 1476 metres in length, commencing at Skippool Bridge Junction and terminating at Poulton Junction, including associated features such as embankments, additional structures and roadside furniture, as shown on Sheets 1 and 2 of the Works Plans.
Work No.41 – The construction of a culvert, approximately 144 metres in length, running at 45° to the alignment of the new A585 dual carriageway, as shown on Sheet 1 of the Works Plans.
Work No.42 – The diversion of utilities (Electricity North West), approximately 82 metres, running perpendicular to the new A585 Dual Carriageway alignment, as shown on Sheet 1 of the Works Plans.
Work No.43 – The construction of a drainage attenuation pond and accompanying environmental bund (banking) with a perimeter approximately 322 metres in length, adjacent to the proposed eastbound carriageway as shown on Sheets 1 and 2 of the Works Plans.
Work No.44 – The construction of a culvert perpendicular to the new A585 Dual Carriageway of length approximately 99 metres, north west of Poulton Junction as shown on Sheet 2 of the Works Plans.
Work No.45 – The construction of a culvert perpendicular to the new A585 Dual Carriageway of length approximately 105 metres, north west of Poulton Junction as shown on Sheet 2 of the Works Plans.
Work No.46 – The construction of the new A585 Dual Carriageway westbound on-slip, left turning, lane at Poulton Junction, approximately 80 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.47 – The construction of an at grade crossroad junction (Poulton Junction) tying in with the existing A586 Garstang Road East and the new A585 Dual Carriageway including all associated widening works and retaining structures approximately 402 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.48 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians) along A586 Garstang Road East, approximately 169 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.49 – The construction of the new A585 Dual Carriageway eastbound off-slip, left turning, lane at Poulton Junction, approximately 87 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.50 – The construction of the new A585 Dual Carriageway eastbound on-slip, left turning, lane at Poulton Junction, approximately 28 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.51 – The diversion of utilities (United Utilities) along A586 Garstang Road East at Poulton Junction approximately 315 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.52 – The construction of an access route (path) to the drainage attenuation pond located South East of Poulton Junction approximately 45 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.53 – The diversion of utilities (United Utilities) along A586 Garstang Road East at Poulton Junction approximately 253 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.54 – The diversion of utilities (Cadent) along A586 Garstang Road East at Poulton Junction approximately 253 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.55 – The construction of an environmental bund (false cutting) along the south side of the new A585 Dual Carriageway, south of Poulton Junction, approximately 351 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.56 – The construction of the new A585 Dual Carriageway westbound off-slip left turning lane at Poulton Junction approximately 81 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.57 – The construction of a drainage attenuation pond and accompanying environmental bund (banking) with a perimeter approximately 210 metres in length, adjacent to Poulton Junction, as shown on Sheet 2 of the Works Plans.
Work No.58 – The construction of a section of the new A585 Dual Carriageway, approximately 2609 metres in length, commencing at Poulton Junction, and terminating at Windy Harbour Junction, including all associated features such as embankments, cuttings, additional structures and roadside furniture, as shown on Sheets 2, 3 and 4 of the Works Plans.
Work No.59 – The construction of an environmental bund along the north side of the new A585 Dual Carriageway, south of Poulton Junction, approximately 531 metres in length, as shown on Sheets 2 and 3 of the Works Plans.
Work No.60 – The diversion of utilities (United Utilities) parallel to the new A585 Dual Carriageway, running for approximately 828 metres in length, as shown on Sheets 2 and 3 of the Works Plans.
Work No.61 – The diversion of utilities (United Utilities) commencing in land adjacent to the new A585 Dual Carriageway and running for approximately 746 metres in length, as shown on Sheets 2 and 3 of the Works Plans.
Work No.62 – The construction of a culvert, approximately 94 metres in length, perpendicular to the new A585 Dual Carriageway, as shown on Sheet 2 of the Works Plans.
Work No.63 – The construction of a borrow pit including the excavation, working and restoration to win material required for the construction of the A585 Windy Harbour to Skippool Improvement Scheme, situated adjacently to the west of Lodge Lane to the north of the proposed bypass, with a perimeter approximately 1270 metres, as shown on Sheets 2 and 3 of the Works Plans.
Work No.64 – The diversion of utilities (Electricity North West), approximately 165 metres in length, running parallel to the north of the new A585 Dual Carriageway, as shown on Sheet 3 of the Works Plans.
Work No.65 – The diversion of utilities (British Telecommunications PLC), approximately 143 metres in length, along Lodge Lane Bridge, as shown on Sheet 3 of the Works Plans.
Work No.66 – The stopping up of the existing private means of access road, approximately 29 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.67 – The diversion of utilities (United Utilities), approximately 59 metres in length, running along Lodge Lane Bridge, as shown on Sheet 3 of the Works Plans.
Work No.68 The construction of alterations to the private means of access, approximately 16 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.69 – The diversion of utilities (Cadent), approximately 439 metres in length at Lodge Lane Bridge, as shown on Sheet 3 of the Works Plans.
Work No.70 – The construction and alteration of Lodge Lane and new overbridge (Lodge Lane Bridge) including all associated bridge foundations, widening, parapets and roadside furniture, approximately 191 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.71 – The diversion of utilities (Electricity North West), approximately 204 metres in length, along private means of access to Singleton Manor and up Lodge Lane to the north, as shown on Sheet 3 of the Works Plans.
Work No.72 – The diversion of utilities (Electricity North West), approximately 269 metres in length, along private means of access to Singleton Manor, across Lodge Lane and running along the south side of the new A585 dual carriageway, as shown on Sheet 3 of the Works Plans.
Work No.73 – The diversion of utilities (United Utilities), approximately 203 metres in length, along private means of access to Singleton Manor, as shown on Sheet 3 of the Works Plans.
Work No.74 – The construction of a new private means of access, approximately 117 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.75 – The diversion of utilities (British Telecommunications PLC), approximately 119 metres in length, along private means of access to Singleton Manor, as shown on Sheet 3 of the Works Plans.
Work No.76 – The diversion of utilities (Cadent), approximately 55 metres in length, along private means of access to Singleton Manor, as shown on Sheet 3 of the Works Plans.
Work No.77 – The diversion of utilities (United Utilities), approximately 90 metres in length, running at 45° to the alignment of the new A585 dual carriageway, as shown on Sheet 3 of the Works Plans.
Work No.78 – The construction of a borrow pit including the excavation, working and restoration to win material required for the construction of the A585 Windy Harbour to Skippool Improvement Scheme, situated adjacently to the west of Lodge Lane to the south of the proposed bypass, with a perimeter approximately 768 metres, as shown on Sheet 3 of the Works Plans.
Work No.79 – The construction of a footbridge (Grange Footbridge), including accompanying bridge foundations, stairs, ramps and non-motorised user footway, approximately 394 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.80 – The diversion of utilities (Cadent), approximately 1005 metres in length, running along the north side of the new A585 dual carriageway, commencing at Garstang New Road and terminating at Windy Harbour Junction, as shown on Sheets 3 and 4 of the Works Plans.
Work No.81 – The diversion of utilities (British Telecommunications PLC), approximately 1033 metres in length, running along the north side of the new A585 dual carriageway, commencing at Garstang New Road and terminating at Windy Harbour Junction, as shown on Sheets 3 and 4 of the Works Plans.
Work No.82 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians) along the north side of the new A585 dual carriageway, commencing at Grange Footbridge, running for approximately 987 metres in length and terminating at Windy Harbour Junction, as shown on Sheets 3 and 4 of the Works Plans.
Work No.83 – The detrunking of a section of Garstang New Road between Little Singleton Junction and Grange Footbridge, approximately 753 metres in length including the construction of a non-motorised user footway (including provisions for cyclists and pedestrians), as shown on Sheet 3 of the Works Plans.
Work No.84 – The construction of the northwest arm of Little Singleton Junction, approximately 71 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.85 – The construction of the northeast arm of Little Singleton Junction, approximately 60 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.86 – The construction of the west arm of Little Singleton Junction, approximately 74 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.87 – The construction of the “Q-turn” at Little Singleton Junction, approximately 46 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.88 – The construction of the south arm of Little Singleton Junction, approximately 50 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.89 – The construction of the east arm of Little Singleton Junction, approximately 77 metres, in length, including the stopping up of Garstang New Road, as shown on Sheet 3 of the Works Plans.
Work No.90 – The construction of a drainage attenuation pond and accompanying environmental bund, with a perimeter of approximately 203 metres, located on the south side of the new A585 dual carriageway, as shown on Sheet 4 of the Works Plans.
Work No.91 – The construction of a culvert, perpendicular to the new A585 dual carriageway, approximately 55 metres in length, as shown on Sheet 4 of the Works Plans.
Work No.92 – The construction of a culvert, perpendicular to the new A585 dual carriageway, approximately 53 metres in length, as shown on Sheet 4 of the Works Plans.
Work No.93 – The construction of a drainage attenuation pond and accompanying environmental bund, with a perimeter of approximately 176 metres, located on the south side of the new A585 dual carriageway, as shown on Sheet 4 of the Works Plans.
Work No.94 – The construction of pedestrian crossing facilities and footpath at the termination of the new A585 dual carriageway at Windy Harbour Junction, tying in with existing crossing facilities at the junction, approximately 62 metres in length, as shown on Sheet 4 of the Works Plans.
Work No.95 – The improvements associated with the de-trunking of the existing A585 between Skippool Bridge Junction and Little Singleton Junction, approximately 1947 metres in length as shown on Sheets 1, 2 and 3 of the Works Plans, including the construction of a non-motorised user footway (including provisions for cyclists and pedestrians).
Work No.96 – The construction of a culvert, perpendicular to the new A585 dual carriageway, approximately 57 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.97 – The construction and alteration of Shard Road Junction, approximately 55 metres in length, including associated features such as embankments, additional structures and roadside furniture, as shown on Sheet 1 of the Works Plans.
Work No.98 – The construction of flood mitigation area (1) with a perimeter of approximately 367 metres, including associated embankments, as shown on Sheet 1 of the Works Plans.
Work No.99 – The construction of a non-motorised user footway (including provision for cyclists and pedestrians) between Skippool Bridge Junction and Old Mains Lane, approximately 36 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.100 – The construction of pedestrian crossing facilities across the new A585 Dual Carriageway at Poulton Junction, approximately 93 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.101 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians) along A586 Garstang Road East, approximately 168 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.102 – The construction of pedestrian crossing facilities across the new A585 Dual Carriageway westbound at Skippool Bridge Junction, approximately 38 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.103 – The construction of pedestrian crossing facilities across the new A585 Dual Carriageway eastbound at Skippool Bridge Junction, approximately 21 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.104 – The construction of pedestrian crossing facilities across the new Skippool Bridge Junction left turning lane, approximately 24 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.105 – The construction of pedestrian crossing facilities across the new Skippool Bridge Junction left turning lane, approximately 47 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.106 – The construction of a non-motorised user footway (including provisions for cyclists and pedestrians) along the A585 Mains Lane, approximately 111 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.107 – The construction of an environmental bund (false cutting), approximately 667 metres in length, running along the north side of the new A585 dual carriageway, as shown on Sheet 2 of the Works Plans.
Work No.108 – The construction of an environmental bund (false cutting), approximately 298 metres in length, running along the south side of the new A585 dual carriageway, as shown on Sheet 1 of the Works Plans.
Work No.109 – The construction of flood mitigation area (4) with a perimeter of approximately 288 metres, including associated embankments, as shown on Sheet 2 of the Works Plans.
Work No.110 – The construction of flood mitigation area (3) with a perimeter of approximately 491 metres, including associated embankments, as shown on Sheet 2 of the Works Plans.
Work No.111 – The construction of flood mitigation area (2) with a perimeter of approximately 619 metres, including associated embankments, as shown on Sheets 1 and 2 of the Works Plans.
Work No.112 – The diversion of utilities (Electricity North West) running perpendicular to the A585 approximately 42 metres in length, as shown on Sheet 1 of the Works Plans.
Work No.113 – The construction of a new private means of access to the west of Poulton Junction on the A586, approximately 516 metres in length, as shown on Sheets 1 and 2 of the Works Plans.
Work No.114 – The construction of a new private means of access to the south of Grange footbridge, approximately 758 metres in length, as shown on Sheet 3 of the Works Plans.
Work No.115 – The construction of a culvert (Skippool Clough), approximately 104 metres in length, running directly beneath Skippool Junction, including the abandoning of the existing Skippool Clough culvert, as shown on Sheet 1 of the Works Plans.
Work No.116 – The diversion of utilities (United Utilities), approximately 27 metres in length, running perpendicular to the new A585 Dual Carriageway, as shown on Sheet 1 of the Works Plans.
Work No.117 – The construction of a farm access track and accommodation fencing on the north side of the track, approximately 84 metres in length, running parallel to the north side of the new A585 Dual carriageway towards Ryecroft Farm, as shown on Sheet 1 of the Works Plans.
Work No.118 – The construction of an altered connection, approximately 21 metres in length, from the footway to the section of Wyre Way west of Horsebridge Dyke, as shown on Sheet 1 of the Works Plans.
Work No.119 – The construction of an altered connection, approximately 12 metres in length, from the footway to the section of Wyre Way west of Horsebridge Dyke, as shown on Sheet 1 of the Works Plans.
Work No.120 – The diversion of utilities (GTC Infrastructure Limited), approximately 69 metres in length, along private means of access to Singleton Manor, as shown on Sheet 3 of the Works Plans.
Work No.121 – The diversion of utilities (British Telecommunications PLC) along A586 Garstang Road East at Poulton Junction, approximately 344 metres in length, as shown on Sheet 2 of the Works Plans.
Work No.122 – The construction of a dwarf wall, approximately 135 metres in length, along the northern footway at Skippool Junction from Throstles Nest to a point east of Skippool Junction, as shown on Sheet 1 of the Works Plans.
Work No.123 – The construction of an accommodation culvert, perpendicular to a new access track, approximately 13 metres in length, as shown on Sheet 1 of the Works Plans.
In connection with the construction of any of those works, further development within the Order limits consisting of—
(a)alteration of the layout of any street permanently or temporarily, including but not limited to increasing the width of the carriageway of the street by reducing the width of any kerb, footpath, footway, cycle track or verge within the street; altering the level or increasing the width of any such kerb, footpath, footway, cycle track or verge; and reducing the width of the carriageway of the street;
(b)works required for the strengthening, improvement, maintenance, or reconstruction of any street;
(c)works for the strengthening, alteration or demolition of any building;
(d)ramps, means of access, non-motorised links, footpaths, footways, bridleways, cycle tracks and crossing facilities;
(e)embankments, viaducts, aprons, abutments, shafts, foundations, retaining walls, drainage, outfalls, ditches, pollution control devices, wing walls, highway lighting, fencing and culverts;
(f)street works, including breaking up or opening a street, or any sewer, drain or tunnel under it; tunnelling or boring under a street;
(g)works to place, alter, divert, relocate, remove or maintain the position of apparatus, services, plant and other equipment in a street, or in other land, including mains, sewers, drains, pipes, lights and cables;
(h)works to alter the course of, or otherwise interfere with, a watercourse;
(i)landscaping, noise barriers, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
(j)works for the benefit or protection of land affected by the authorised development;
(k)works to place, alter, remove or maintain road furniture;
(l)site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soils stripping and storage, site levelling);
(m)the felling of trees and hedgerows;
(n)establishment of site construction compounds, storage areas, temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction related buildings, welfare facilities, construction lighting, haulage roads and other machinery, apparatus, works and conveniences;
(o)the provision of other works including pavement works, kerbing and paved areas works, signing, signals, gantries, road markings works, traffic management measures including temporary roads and such other works as are associated with the construction of the authorised development; and
(p)such other works, working sites storage areas, works of demolition or works of whatever nature, as may be necessary or expedient for the purposes of, or for purposes associated with or ancillary to, the construction, operation or maintenance of the authorised development which do not give rise to any materially new or materially different environmental effects to those assessed in the environmental statement.
Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys