xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 15U.K.CERTIFICATION DOCUMENTS

[F11.  Documents for certification that they are true copies of the documents referred to in this Order—U.K.

(1)

Document/Plan

(2)

Document Number

(3)

Document date/Plan number with revision number

Access and rights of way plans
Key plan2.3WSP-70001979-SK-060 Rev I
Sheet 12.3AWSP-70001979-SK-060 Rev H
Sheet 22.3BWSP-70001979-SK-060 Rev G
Sheet 32.3CWSP-70001979-SK-060 Rev F
Sheet 42.3DWSP-70001979-SK-060 Rev F
Sheet 52.3EWSP-70001979-SK-060 Rev F
Sheet 62.3FWSP-70001979-SK-060 Rev F
Sheet 72.3GWSP-70001979-SK-060 Rev B
The book of reference4.3B21 August 2019
The bridge plans
Proposed road bridges plan and long section2.18A1516-0425-WDK-SI-C-301-010 Rev P11
Road Bridge B12.18B1516-0425-WDK-SI-C-301-006 Rev P14
Road Bridge B2 and B32.18C1516-0425-WDK-SI-C-300-007 Rev P14
Proposed road bridge B4 section and elevation2.18D1516-0425-WDK-SI-C-301-008 Rev P17
The design and access statement7.53 August 2018
The environmental statement6.2

3 August 2018 (subject to the substitutions set out below):

(i) Figures 10.001, 10.002, 10.003 and 10.004 – 12 September 2018

(ii) Annex 10.1.1 – 12 September 2018

(iii) Addendum to Chapter 13 (Noise and Vibration) – 5 April 2019

(iv) Appendix I to Transport Assessment (Appendix 15.1) (Site Wide HGV Management Plan) – 7 May 2019

(v) Appendix H to Transport Assessment (Appendix 15.1) (Site Wide Travel plan) – 5 July 2019

(vi) Appendix 2.3 (Outline Demolition and Construction Management Plan) – 5 July 2019

(vii) Appendix 10.4 (Framework Ecological Mitigation and Management Plan) – 5 July 2019

(viii) Updated Chapter 7 (Air Quality) and Appendices 7.2, 7.3, 7.4, 7.6 and 7.7 – 7 August 2019

The future highways maintenance plans
Key Plan2.10WSP-70001979-SK-091 Rev F
Sheet 12.10AWSP-70001979-SK-091 Rev F
Sheet 22.10BWSP-70001979-SK-091 Rev C
Sheet 32.10CWSP-70001979-SK-091 Rev C
The highway classification plans
Key Plan2.13WSP-70001979-SK-068 Rev I
Sheet 12.13AWSP-70001979-SK-068 Rev H
Sheet 22.13BWSP-70001979-SK-068 Rev E
Sheet 32.13CWSP-70001979-SK-068 Rev E
The highway general arrangement plans
Key Plan/Highway Masterplan2.9WSP-70001979-GA-100 Rev M
General Arrangement Plan 1012.9AWSP-70001979-GA-101 Rev E
General Arrangement Plan 1022.9BWSP-70001979-GA-102 Rev E
General Arrangement Plan 1032.9CWSP-70001979-GA-103 Rev I
General Arrangement Plan 1042.9DWSP-70001979-GA-104 Rev M
General Arrangement Plan 1052.9EWSP-70001979-GA-105 Rev E
General Arrangement Plan 1062.9FWSP-70001979-GA-106 Rev G
General Arrangement Plan 1072.9GWSP-70001979-GA-107 Rev H
General Arrangement Plan 1082.9HWSP-70001979-GA-108 Rev F
General Arrangement Plan 1092.9IWSP-70001979-GA-109 Rev G
General Arrangement Plan 1102.9JWSP-70001979-GA-110 Rev H
General Arrangement Plan 1112.9KWSP-70001979-GA-111 Rev H
The land plans
Key Plan2.1Key Plan v1
Sheet 12.1ASheet 1 of 12 v0
Sheet 22.1BSheet 2 of 12 v0
Sheet 32.1CSheet 3 of 12 v0
Sheet 42.1DSheet 4 of 12 v1
Sheet 52.1ESheet 5 of 12 v0
Sheet 62.1FSheet 6 of 12 v0
Sheet 72.1GSheet 7 of 12 v0
Sheet 82.1HSheet 8 of 12 v0
Sheet 92.1ISheet 9 of 12 v0
Sheet 102.1JSheet 10 of 12 v0
Sheet 112.1KSheet 11 of 12 v0
Sheet 122.1LSheet 12 of 12 v0
Order limits plan2.44990-00011 Rev 06
The parameters plans
Development Zone Parameters Plan
Key Plan2.54990-02000 Rev 08
Sheet 12.5A4990-02001 Rev 08
Sheet 22.5B4990-02002 Rev 08
Sheet 32.5C4990-02003 Rev 09
Sheet 42.5D4990-02004 Rev 07
Floor Levels and Building Heights Parameters Plan
Key Plan2.64990-02010 Rev 08
Sheet 12.6A4990-02011 Rev 07
Sheet 22.6B4990-02012 Rev 07
Sheet 32.6C4990-02013 Rev 08
Sheet 42.6D4990-02014 Rev 07
Green Infrastructure Parameters Plan
Key Plan2.74990-02020 Rev 11
Sheet 12.7A4990-02021 Rev 10
Sheet 22.7B4990-02022 Rev 10
Sheet 32.7C4990-02023 Rev 11
Sheet 42.7D4990-02024 Rev 09
The illustrative arrangement of railway alignment2.14TRS-DRG-FA-001003 Rev 05
The rail terminal – illustrative expanded rail terminal layout plan2.15BTRS-DRG-FA-001010 Rev 04
The rail section plans
Rail Alignment Cross Sections – Sheet 12.16ATRS-DRG-FA-001005 Rev 02
Rail Alignment Cross Sections – Sheet 22.16BTRS-DRG-FA-001006 Rev 03
Rail Alignment Cross Sections – Sheet 32.16CTRS-DRG-FA-001007 Rev 02
Long sections rail alignment Sheet 12.16DTRS-DRG-FA-001004 Rev 02
Long sections rail alignment Sheet 22.16ETRS-DRG-FA-001008 Rev 02
The speed limit plans
Key Plan2.12WSP-70001979-SK-062 Rev I
Sheet 12.12AWSP-70001979-SK-062 Rev K
Sheet 22.12BWSP-70001979-SK-062 Rev F
Sheet 32.12CWSP-70001979-SK-062 Rev E
SI facility plan2.2001
The traffic regulation plans
Key Plan2.11WSP-70001979-SK-061 Rev I
Sheet 12.11AWSP-70001979-SK-061 Rev H
Sheet 22.11BWSP-70001979-SK-061 Rev E
Sheet 32.11CWSP-70001979-SK-061 Rev F
Sheet 42.11DWSP-70001979-SK-061 Rev A
The works plans
Key Plan2.2Key Plan v3.0
Sheet 12.2ASheet 1 of 9 v3.0
Sheet 22.2BSheet 2 of 9 v3.0
Sheet 32.2CSheet 3 of 9 v1
Sheet 42.2DSheet 4 of 9 v1
Sheet 52.2ESheet 5 of 9 v1
Sheet 62.2FSheet 6 of 9 v3.0
Sheet 72.2GSheet 7 of 9 v1
Sheet 82.2HSheet 8 of 9 v1
Sheet 92.2ISheet 9 of 9 v1]