- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
There are currently no known outstanding effects for the The West Midlands Rail Freight Interchange Order 2020, Paragraph 1.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
[F11. Documents for certification that they are true copies of the documents referred to in this Order—U.K.
(1) Document/Plan | (2) Document Number | (3) Document date/Plan number with revision number |
---|---|---|
Access and rights of way plans | ||
Key plan | 2.3 | WSP-70001979-SK-060 Rev I |
Sheet 1 | 2.3A | WSP-70001979-SK-060 Rev H |
Sheet 2 | 2.3B | WSP-70001979-SK-060 Rev G |
Sheet 3 | 2.3C | WSP-70001979-SK-060 Rev F |
Sheet 4 | 2.3D | WSP-70001979-SK-060 Rev F |
Sheet 5 | 2.3E | WSP-70001979-SK-060 Rev F |
Sheet 6 | 2.3F | WSP-70001979-SK-060 Rev F |
Sheet 7 | 2.3G | WSP-70001979-SK-060 Rev B |
The book of reference | 4.3B | 21 August 2019 |
The bridge plans | ||
Proposed road bridges plan and long section | 2.18A | 1516-0425-WDK-SI-C-301-010 Rev P11 |
Road Bridge B1 | 2.18B | 1516-0425-WDK-SI-C-301-006 Rev P14 |
Road Bridge B2 and B3 | 2.18C | 1516-0425-WDK-SI-C-300-007 Rev P14 |
Proposed road bridge B4 section and elevation | 2.18D | 1516-0425-WDK-SI-C-301-008 Rev P17 |
The design and access statement | 7.5 | 3 August 2018 |
The environmental statement | 6.2 | 3 August 2018 (subject to the substitutions set out below): (i) Figures 10.001, 10.002, 10.003 and 10.004 – 12 September 2018 (ii) Annex 10.1.1 – 12 September 2018 |
(iii) Addendum to Chapter 13 (Noise and Vibration) – 5 April 2019 (iv) Appendix I to Transport Assessment (Appendix 15.1) (Site Wide HGV Management Plan) – 7 May 2019 (v) Appendix H to Transport Assessment (Appendix 15.1) (Site Wide Travel plan) – 5 July 2019 (vi) Appendix 2.3 (Outline Demolition and Construction Management Plan) – 5 July 2019 (vii) Appendix 10.4 (Framework Ecological Mitigation and Management Plan) – 5 July 2019 (viii) Updated Chapter 7 (Air Quality) and Appendices 7.2, 7.3, 7.4, 7.6 and 7.7 – 7 August 2019 | ||
The future highways maintenance plans | ||
Key Plan | 2.10 | WSP-70001979-SK-091 Rev F |
Sheet 1 | 2.10A | WSP-70001979-SK-091 Rev F |
Sheet 2 | 2.10B | WSP-70001979-SK-091 Rev C |
Sheet 3 | 2.10C | WSP-70001979-SK-091 Rev C |
The highway classification plans | ||
Key Plan | 2.13 | WSP-70001979-SK-068 Rev I |
Sheet 1 | 2.13A | WSP-70001979-SK-068 Rev H |
Sheet 2 | 2.13B | WSP-70001979-SK-068 Rev E |
Sheet 3 | 2.13C | WSP-70001979-SK-068 Rev E |
The highway general arrangement plans | ||
Key Plan/Highway Masterplan | 2.9 | WSP-70001979-GA-100 Rev M |
General Arrangement Plan 101 | 2.9A | WSP-70001979-GA-101 Rev E |
General Arrangement Plan 102 | 2.9B | WSP-70001979-GA-102 Rev E |
General Arrangement Plan 103 | 2.9C | WSP-70001979-GA-103 Rev I |
General Arrangement Plan 104 | 2.9D | WSP-70001979-GA-104 Rev M |
General Arrangement Plan 105 | 2.9E | WSP-70001979-GA-105 Rev E |
General Arrangement Plan 106 | 2.9F | WSP-70001979-GA-106 Rev G |
General Arrangement Plan 107 | 2.9G | WSP-70001979-GA-107 Rev H |
General Arrangement Plan 108 | 2.9H | WSP-70001979-GA-108 Rev F |
General Arrangement Plan 109 | 2.9I | WSP-70001979-GA-109 Rev G |
General Arrangement Plan 110 | 2.9J | WSP-70001979-GA-110 Rev H |
General Arrangement Plan 111 | 2.9K | WSP-70001979-GA-111 Rev H |
The land plans | ||
Key Plan | 2.1 | Key Plan v1 |
Sheet 1 | 2.1A | Sheet 1 of 12 v0 |
Sheet 2 | 2.1B | Sheet 2 of 12 v0 |
Sheet 3 | 2.1C | Sheet 3 of 12 v0 |
Sheet 4 | 2.1D | Sheet 4 of 12 v1 |
Sheet 5 | 2.1E | Sheet 5 of 12 v0 |
Sheet 6 | 2.1F | Sheet 6 of 12 v0 |
Sheet 7 | 2.1G | Sheet 7 of 12 v0 |
Sheet 8 | 2.1H | Sheet 8 of 12 v0 |
Sheet 9 | 2.1I | Sheet 9 of 12 v0 |
Sheet 10 | 2.1J | Sheet 10 of 12 v0 |
Sheet 11 | 2.1K | Sheet 11 of 12 v0 |
Sheet 12 | 2.1L | Sheet 12 of 12 v0 |
Order limits plan | 2.4 | 4990-00011 Rev 06 |
The parameters plans | ||
Development Zone Parameters Plan | ||
Key Plan | 2.5 | 4990-02000 Rev 08 |
Sheet 1 | 2.5A | 4990-02001 Rev 08 |
Sheet 2 | 2.5B | 4990-02002 Rev 08 |
Sheet 3 | 2.5C | 4990-02003 Rev 09 |
Sheet 4 | 2.5D | 4990-02004 Rev 07 |
Floor Levels and Building Heights Parameters Plan | ||
Key Plan | 2.6 | 4990-02010 Rev 08 |
Sheet 1 | 2.6A | 4990-02011 Rev 07 |
Sheet 2 | 2.6B | 4990-02012 Rev 07 |
Sheet 3 | 2.6C | 4990-02013 Rev 08 |
Sheet 4 | 2.6D | 4990-02014 Rev 07 |
Green Infrastructure Parameters Plan | ||
Key Plan | 2.7 | 4990-02020 Rev 11 |
Sheet 1 | 2.7A | 4990-02021 Rev 10 |
Sheet 2 | 2.7B | 4990-02022 Rev 10 |
Sheet 3 | 2.7C | 4990-02023 Rev 11 |
Sheet 4 | 2.7D | 4990-02024 Rev 09 |
The illustrative arrangement of railway alignment | 2.14 | TRS-DRG-FA-001003 Rev 05 |
The rail terminal – illustrative expanded rail terminal layout plan | 2.15B | TRS-DRG-FA-001010 Rev 04 |
The rail section plans | ||
Rail Alignment Cross Sections – Sheet 1 | 2.16A | TRS-DRG-FA-001005 Rev 02 |
Rail Alignment Cross Sections – Sheet 2 | 2.16B | TRS-DRG-FA-001006 Rev 03 |
Rail Alignment Cross Sections – Sheet 3 | 2.16C | TRS-DRG-FA-001007 Rev 02 |
Long sections rail alignment Sheet 1 | 2.16D | TRS-DRG-FA-001004 Rev 02 |
Long sections rail alignment Sheet 2 | 2.16E | TRS-DRG-FA-001008 Rev 02 |
The speed limit plans | ||
Key Plan | 2.12 | WSP-70001979-SK-062 Rev I |
Sheet 1 | 2.12A | WSP-70001979-SK-062 Rev K |
Sheet 2 | 2.12B | WSP-70001979-SK-062 Rev F |
Sheet 3 | 2.12C | WSP-70001979-SK-062 Rev E |
SI facility plan | 2.20 | 01 |
The traffic regulation plans | ||
Key Plan | 2.11 | WSP-70001979-SK-061 Rev I |
Sheet 1 | 2.11A | WSP-70001979-SK-061 Rev H |
Sheet 2 | 2.11B | WSP-70001979-SK-061 Rev E |
Sheet 3 | 2.11C | WSP-70001979-SK-061 Rev F |
Sheet 4 | 2.11D | WSP-70001979-SK-061 Rev A |
The works plans | ||
Key Plan | 2.2 | Key Plan v3.0 |
Sheet 1 | 2.2A | Sheet 1 of 9 v3.0 |
Sheet 2 | 2.2B | Sheet 2 of 9 v3.0 |
Sheet 3 | 2.2C | Sheet 3 of 9 v1 |
Sheet 4 | 2.2D | Sheet 4 of 9 v1 |
Sheet 5 | 2.2E | Sheet 5 of 9 v1 |
Sheet 6 | 2.2F | Sheet 6 of 9 v3.0 |
Sheet 7 | 2.2G | Sheet 7 of 9 v1 |
Sheet 8 | 2.2H | Sheet 8 of 9 v1 |
Sheet 9 | 2.2I | Sheet 9 of 9 v1] |
Textual Amendments
F1Sch. 15 Table substituted (26.10.2023) by The West Midlands Rail Freight Interchange (Amendment) Order 2023 (S.I. 2023/1132), art. 1, Sch.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys