Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 33

SCHEDULE 10E+WLAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Commencement Information

I1Sch. 10 in force at 11.6.2020, see art. 1

(1)

Plot reference Number shown on Land Plans

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

Land Plans – Sheet 2
2/3z, 2/58a, 2/58b, 2/59Required for provision of a temporary construction compound.Works Nos. 3 ,6 and 70
2/52Temporary possession associated with the Solihull Road Overbridge and temporary alignments to ensure Solihull road remains open.Work Nos. 3 and 70
2/2aRequired for the provision of temporary access to facilitate the construction worksWork Nos. 1 and 5
2/2cRequired for construction of a diversion to an existing local high pressure gas main; and to provide temporary access to land associated with the provision of environmental mitigation.Work No. 55
2/3aRequired for construction of a new M42 off slip road and the demolition of an existing sheet pile wall.Work No. 4
2/3cRequired for storage of earthworks and for the construction of a diversion to an existing local high pressure gas main.Works Nos. 3 and 55
2/3dRequired for construction of a new M42 off slip road and the demolition of an existing sheet pile wall and to provide temporary access to land associated with environmental mitigation.Work No. 4
2/3g, 2/3h, 2/3i, 2/3j, 2/3p, 2/3r, 2/22Required to provide temporary access to land associated with the provision of environmental mitigation.Work Nos. 3, 4 and 5
2/3o, 2/10c, 2/29, 2/30Required for construction of diversions to existing utilities apparatus and equipment.Work No. 3
2/3u, 2/3ahRequired for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for construction of a reinforced cover slab for an existing fuel pipeline.Works Nos. 56, 62 and 66
2/3wRequired for construction of a temporary two lane single carriageway; and for the stockpiling of construction materials.Work No. 70
2/3aaRequired for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials.Works No. 33, 56 and 62
2/3abRequired for construction of a temporary merge onto the M42 for construction vehicles; and for the stockpiling of construction materials.All Works
2/10a, 2/10b, 2/11Required for lining and signing works.All Works
2/62aRequired for construction of realigned B4438 Catherine- de- Barnes Lane.Work No. 11
2/65Required for construction of a temporary southbound diverge for construction traffic.All Works
2/76aRequired for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities.Work No. 68
Land Plans – Sheet 3
3/3d, 3/51a, 3/57, 3/58aRequired for the stockpiling of construction materials.All Works
3/4bRequired for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials.Works No. 33, 56 and 62
3/4fRequired for access to drainage attenuation and treatment systems; and for the stockpiling of construction materials.Work No. 33
3/15a, 3/15c,3/15eRequired for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities.Work No. 68
3/22a, 3/22bTo access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI – Shadowbrook Meadows unitWork No. 76
3/32b, 3/32cTo access land in connection with the monitoring of the Bickenhill Meadows SSSI – Shadowbrook Meadows unit.All Works
3/23, 3/73fRequired for construction of diversions to existing utilities apparatus and equipment.All Works
3/73dRequired for construction of diversions to existing utilities apparatus and equipment.Work No. 69
Required for the provision of a temporary construction compound.All Works
3/25Required for access to land associated with the provision of environmental mitigation within the Bickenhill Meadows SSSI – Shadowbrook Meadows unit.Work No.76
For construction of diversions to existing utilities apparatus and equipment.All Works
3/30Required for access to construct a diversion to a private means of access.Work No.17
3/87a, 3/87bRequired for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.Works Nos. 57, 64 and 65
Land Plans – Sheet 4
4/1a, 4/1i, 4/1ad, 4/1af, 4/1ag, 4/1ah, 4/1ai, 4/1ak, 4/1al, 4/3r, 4/146Required for signage installation.All Works
4/1c, 4/1bf, 4/3b, 4/3c, 4/3ai, 4/3aj, 4/3s, 4/3x, 4/6n, 4/6p, 4/10Required for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 21, 45 and 59
4/1dRequired for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.Work No. 20
4/1fRequired for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 22, 23 and 24
4/1gRequired for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 20 and 22
4/1h, 4/3abRequired for access to construct a new free flow link road; and for construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 2, 21 and 59
4/1kRequired for the realignment of Public Right of Way M106; and for access and construction of a diversion to an existing medium pressure gas main.Works Nos. 53 and 60
4/1m, 4/1s, 4/1x, 4/1ap, 4/1bb, 4/3f, 4/3g, 4/62, 4/71, 4/147Required for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment.Work No. 19
4/1nRequired for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 19 and 60
4/1p, 4/25cRequired for access to monitor existing drainage attenuation features.Work No.20
4/1q, 4/3h, 4/3k, 4/3mRequired for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment.Work No. 20
4/1rRequired for access to construct a pedestrian overbridge; and for construction of a diversion to a medium pressure gas main.Works Nos. 39 and 60
4/1t, 4/1uRequired for signage installation and the construction of diversions to existing utilities apparatus and equipment.Work No.2
4/1v, 4/1am, 4/3j, 4/3ae, 4/4n, 4/4v, 4/4x, 4/25b, 4/25d, 4/25s, 4/73, 4/76, 4/151, 4/152, 4/153Required for access and construction of diversions to existing utilities apparatus and equipment.All Works
4/1w, 4/3e; 4/3o, 4/3p, 4/6e, 4/6f, 4/6g, 4/6h, 4/25e, 4/25g, 4/25l, 4/25n, 4/66, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/150, 4/155Required for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment.Work No. 2
4/1zRequired for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road.Works Nos. 20 and 22
4/1aa, 4/1ab, 4/1ac, 4/1ax, 4/3adRequired for temporary access to construct a realignment of the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road.Work No. 22
4/1ao, 4/7bRequired for temporary access to construct alterations to the existing Bickenhill Lane carriageway; and for drainage.Work No. 24
4/1aq, 4/1bcRequired for access and construction of a realignment to an existing private means of access; and for access and construction of environmental mitigation; and for monitoring of attenuation devices.Work No. 21
4/1asRequired for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment.Work No. 2
4/1az, 4/1baRequired for access and construction of a diversion to an existing aqueduct pipeline.Work No. 63
4/2a, 4/2b, 4/2c, 4/2d, 4/3af,Required for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.Works Nos. 57, 64 and 65
4/25fRequired for access and construction of improvements to the eastbound and westbound carriageway of the A45; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.Works Nos. 2, 57, 64 and 65
4/3dRequired for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange; and for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 20, 22, 23 and 24
4/3i, 4/3lRequired for access and construction of diversions to existing utilities apparatus and equipment.Work Nos. 2 and 20
4/3nRequired for temporary access to construct improvements to the existing Clock Interchange.Work No. 20
4/3u, 4/3v, 4/3agRequired for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.Works Nos. 26, 57, 64 and 65
4/3yRequired for access and construction of improvements to the existing Clock Interchange; and for construction of a new free flow link road; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.Works Nos. 20 and 21
4/3ah, 4/4u, 4/25q, 4/25u, 4/160Required for access to and construction of a diversion to an existing aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment.Work No. 63
4/4g, 4/4kRequired for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 53 and 69
4/4wRequired for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for access and construction of a diversion to an existing aqueduct pipeline; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 53, 63 and 69
4/6aRequired for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of a diversion to an existing aqueduct pipeline; and for construction of diversions to existing utilities apparatus and equipment.Works Nos. 21, 45, 59 and 63
4/6bRequired for access and construction of diversions to existing electric lines, cables, equipment and apparatus; and for access and construction of an extension to an existing culvert.Works Nos. 57, 64 and 65
4/6dRequired for construction of a pedestrian overbridge; and for access and construction of a diversion to an existing medium pressure gas main; and for access and construction of an extension to an existing culvert; and for the construction of diversions to existing electric lines, cables, equipment and apparatus.Works Nos. 39, 57, 60, 64 and 65
4/7aRequired for alterations to the existing Bickenhill Lane carriageway; and for the construction of diversions to existing electric lines, cables, equipment and apparatus.Works Nos. 23 and 24
4/9Required for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for access and construction of diversions to existing utilities apparatus and equipment.Works Nos. 2 and 59
4/11bRequired for access to construct a pedestrian overbridge across the A45.Work No. 39
4/25a, 4/69, 4/80Required for access and construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.Work No. 20
4/11a, 4/25i, 4/25mRequired for access and construction of a cantilever gantry; and for lining and signing; and for access and construction of diversions to existing utilities apparatus and equipment.Work No. 2
4/25j, 4/25o and 4/25pRequired for construction of a cantilever gantry and demolition of a portal gantry; and for access and construction of a pedestrian overbridge; and for lining and signing works; and for access and construction of diversions to existing utilities equipment and apparatus.Works Nos. 2 and 39
4/59Required for lining and signing; and for access to and construction of a new free flow link road; and for access to and construction of a realignment to a private means of access.Works Nos. 2 and 21
4/82Required for lining and signing works; and for access to and construction of a pedestrian overbridge; and for access to and construction of a diversion to an existing medium pressure gas main; and access to and construction of diversions to existing utilities apparatus and equipment.Works Nos. 2, 39 and 60
4/149Required for lining and signing works; and for access to and construction of a diversion to an aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment.Works Nos. 2 and 63
4/156Required for lining and signing works; and for access to and construction of a new free flow link; and for access to and construction of a footway/cycleway; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment.Works Nos. 2, 21, 45, 59 and 63
4/158, 4/159Required lining and signing in connection with Airport Way connector road; and for access to and construction of a free flow link road; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment.Works Nos. 21 and 59
Land Plans – Sheet 5
5/1a, 5/1bRequired for access to and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.Works Nos. 57, 64 and 65
5/7Required for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment.Work No. 2
5/29b, 5/29c, 5/29h, 5/29t, 5/29u and 5/29yRequired for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.Works Nos. 26, 57, 64 and 65
5/29p, 5/29rRequired for removal of existing East Way Roundabout.Work No. 30(a)
5/62Required for lining and signing works.Work No. 31
Land Plans – Sheet 6
6/2cRequired for access to and construction of a new free flow single carriageway.Work No. 26

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill