The Immingham Open Cycle Gas Turbine Order 2020

InterpretationE+W

161.  In this Part of this Schedule—

the contractor” means any contractor or sub-contractor appointed by the undertaker to construct the HE works;

the detailed design information” means details of the following where applicable to the HE works—

(a)

site clearance details;

(b)

boundary and mitigation fencing;

(c)

road restraints systems and supporting road restraint risk appraisal process assessment;

(d)

drainage and ducting and supporting drainage calculations;

(e)

earthworks including supporting geotechnical assessments and any required strengthened earthworks appraisal form certification;

(f)

kerbs, footways and paved areas;

(g)

traffic signs and road markings;

(h)

traffic signal equipment and associated signal phasing and timing detail;

(i)

road lighting (including columns and brackets) and supporting lighting calculations;

(j)

electrical work for road lighting, traffic signs and signals;

(k)

highway structures and any required structural approval in principle;

(l)

landscaping;

(m)

proposed departures from DMRB requirements;

(n)

utilities diversions;

(o)

topographical survey;

(p)

site waste management plan;

(q)

maintenance and repair strategy in accordance with Designing for Maintenance Interim Advice Note 69/15 or any replacement or modification of it;

(r)

asbestos survey;

(s)

regime of core testing and sampling of existing trunk road pavement construction;

(t)

site investigation survey;

(u)

health and safety information; and

(v)

other such information used to inform the detailed design of the HE works that may be required by Highways England;

DMRB” means the Design Manual for Roads and Bridges or any replacement or modification of it;

the estimated costs” means the estimated costs in respect of any HE works agreed pursuant to paragraph 164 of this Part of this Schedule;

the Existing Gas Pipeline” means the existing gas pipeline the location of which is shown shaded blue within the Order Land but outside the Order Limits as shown on F1... the Land Plans;

the HE works” means any works carried out by the undertaker on the strategic road network F1... to maintain, alter, inspect, repair, renew, replace, decommission or remove in whole or in part the Existing Gas Pipeline;

Highways England” means the Highways England Company Limited with company number 04346363 and whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey GU1 4LZ;

the nominated persons” means the undertaker's representatives or the contractor's representatives on site during construction of the HE works, as notified to Highways England from time to time;

the programme of works” means a document setting out the sequence and timetabling of the HE works; and

utilities” means any pipes, wires, cables or other equipment belonging to any person or body having power or consent to undertake street works under the 1991 Act.