Regulation 4
(1) | (2) |
---|---|
Category of development for which approval is sought | Fee payable |
1. Plans and specifications for the following works | |
A | |
(i) Building works – the erection, construction, alteration or extension of a building, other than a temporary building and excluding anything in C below. | (a) where no gross floor space is to be created by the development, £195; (b) where the area of the gross floor space to be created by the development does not exceed 40 square metres, £195; (c) where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £385; (d) where the area of gross floor space to be created by the development exceeds 75 square metres but does not exceed 3750 square metres £385 for each 75 square metres or part thereof of that area; (e) where the area of gross floor space to be created by the development exceeds 3750 square metres, £19,049; and an additional £115 for each 75 square metres or part thereof subject to a maximum of £250,000. |
(ii) Fences and walls – the erection, alteration or extension of any fence or wall (other than sight, noise or dust screens). | |
(iii) Sight, noise or dust screens – the erection, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening and dust suppression. | |
(iv) Artificial lighting equipment – the erection, alteration, extension or installation of lighting equipment. | |
B Road vehicle park – does not include anything that is not a building. | £195. |
C Earthworks – the erection, alteration or extension of any terracing, cuttings, embankments or other earth works | £195 for each 0.1 hectares or part thereof of the site, subject to a maximum of £1,690. |
D | |
(i) Telecommunication masts or pedestrian access to the railway line. | £195. |
(ii) Transformers. | The criteria in (a) to (e) in category 1A apply for the calculation of the fee. |
2. Matters ancillary to development | |
A. Handling of re-useable spoil or top soil – handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. | £195. |
B. Storage sites – sites on land within the Act limits at which materials are to be stored until used or re-used in carrying out the development or disposal as waste. | £195. |
C. Construction camps – sites on land within the Act limits which are to be used for the residential accommodation of persons engaged in carrying out the development. | £195. |
D. Works screening – the provision where necessary on land within the Act limits of any screening for working sites on such land required for the purpose of carrying out the development. | £195. |
E. Artificial lighting – the use of artificial lighting on land within the Act limits for the purpose of carrying out the development. | £195. |
F. Dust Suppression – the suppression caused by construction operations carried out on land within the Act limits for the purpose of carrying out the development. | £195. |
G. Road mud control measures – the measures to be taken on land within the Act limits to prevent or reduce the carrying of mud on to any public highway as a result if carrying out the development. | £195. |
3. Road Transport | |
Arrangements concerning road transport – the arrangements regarding the routes by which anything is to be transported on a highway by a large goods vehicle(1) to a working or storage site; a site where it will be re-used; or a waste disposal site. | £195. |
4. Waste and spoil disposal and excavations | |
The development to the extent it consists of waste and spoil disposal or the excavation of bulk materials from borrow pits. | £195 for each 0.1 hectares or part thereof of the site area, subject to a maximum of £29,112. |
5. Bringing scheduled works or deposits into use | |
Arrangements for bringing into use scheduled works and depots. | £195. |
6. Mitigation Schemes | |
Measures to mitigate the effect of the work or its operation on the local environment or local amenity (see paragraph 9(4)(b) of the Schedule). | £195. |
7. Site restoration schemes | |
A site restoration scheme. | £195. |
8. Additional details | |
A request for approval of additional details where that approval is required under paragraph 2(3), 3(4) or 7(4) of the Schedule. | £97. |
9. Non-material changes | |
The request for a non-material change of any approval (paragraph 21 of the Schedule). | £195. |
See paragraph 6(7) of Schedule 17 to the High Speed Rail (West Midlands – Crewe) Act 2021 where this term is defined.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys