Chwilio Deddfwriaeth

The Space Industry Regulations 2021

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: SCHEDULE 1

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Space Industry Regulations 2021, SCHEDULE 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulations 26, 27, 29

SCHEDULE 1U.K.Information the safety case must contain

This Atodlen has no associated Memorandwm Esboniadol

General informationU.K.

1.  A description of the proposed spaceflight activities including the proposed flight trajectory, any planned orbital parameters for the launch vehicle, any planned orbital parameters for any payload and details of any planned re-entry from orbit by the launch vehicle.

Commencement Information

I1Sch. 1 para. 1 in force at 29.7.2021, see reg. 1(1)

2.  General descriptions of—

(a)the applicant’s organisation and management structure;

(b)the launch vehicle to be used including descriptions and, where appropriate, diagrams of—

(i)its concept of operations,

(ii)any payload or class of payload, and

(iii)the layout of systems that are part of it;

(c)any carrier aircraft to be used including descriptions and, where appropriate, diagrams of—

(i)its concept of operations,

(ii)any payload or class of payload, and

(iii)the layout of systems that are part of it;

(d)the facilities and major items of equipment that the applicant will need to carry out the proposed spaceflight activities, and which, if any, of these will be provided by a proposed spaceport licensee or by a proposed range control service provider;

(e)the areas which could be affected by a major accident during the proposed spaceflight activities, including—

(i)their geography,

(ii)any structures in them built by humans or built for human use or benefit, and

(iii)the existing and expected locations of humans and areas of habitation within those areas.

Commencement Information

I2Sch. 1 para. 2 in force at 29.7.2021, see reg. 1(1)

3.  For launch operator licence applicants, identification of the spaceport or other place from which the launch is to take place and the proposed spaceport licensee.

Commencement Information

I3Sch. 1 para. 3 in force at 29.7.2021, see reg. 1(1)

4.  Identification of—

(a)any range control services needed;

(b)any proposed range control service providers;

(c)any site or facility other than a spaceport that has been or is to be used by the applicant in the design, manufacture, testing or operation of the applicant’s launch vehicle or any carrier aircraft.

Commencement Information

I4Sch. 1 para. 4 in force at 29.7.2021, see reg. 1(1)

5.—(1) For launch operator licence applicants—

(a)a schedule of the preparatory events mentioned in the ground safety analysis required by regulation 27 setting out how long before the launch each preparatory event is intended to take place;

(b)the review processes the applicant will use to check—

(i)that launch preparations are progressing safely, and

(ii)whether the applicant and any other licensees involved in the launch are ready to commence the launch;

(c)a schedule of any safety-critical actions the proposed range control service provider and the proposed spaceport licensee will carry out in preparation for the launch from the time when the launch vehicle or its components arrive at the spaceport or other place from which the launch is to take place.

(2) In this paragraph, “safety-critical action” means any action which is essential to preventing the proposed spaceflight activities from causing a major accident.

Commencement Information

I5Sch. 1 para. 5 in force at 29.7.2021, see reg. 1(1)

6.  Evidence that the applicant will, if granted the licence, be able to meet the requirements of regulations 84 to 104 of Part 8 (safety of operator’s spaceflight activities).

Commencement Information

I6Sch. 1 para. 6 in force at 29.7.2021, see reg. 1(1)

7.  Details of the applicant’s safety management system for the proposed spaceflight activities.

Commencement Information

I7Sch. 1 para. 7 in force at 29.7.2021, see reg. 1(1)

8.  Particulars of any licence, permit or approval that any country other than the United Kingdom has granted to the applicant in relation to the proposed spaceflight activities or a launch vehicle that the applicant plans to use for those activities.

Commencement Information

I8Sch. 1 para. 8 in force at 29.7.2021, see reg. 1(1)

9.  Information about what applications, if any, the applicant has previously made for a licence or approval to carry out spaceflight activities similar to the proposed spaceflight activities, and what the outcome was of each of those applications.

Commencement Information

I9Sch. 1 para. 9 in force at 29.7.2021, see reg. 1(1)

10.  Information about the applicant’s experience, if any, in the design, development or operation of launch vehicles, payloads or any other space-related hardware or software.

Commencement Information

I10Sch. 1 para. 10 in force at 29.7.2021, see reg. 1(1)

Technical particularsU.K.

11.  Descriptions of the technical requirements which apply to the launch vehicle, which must be either—

(a)the requirements described under the headings of technical requirements types contained in Chapter 6 of the Space Engineering Technical Requirements Specification produced by the European Cooperation for Space Standardisation and dated 6th March 2009(1), or

(b)requirements of substantially like effect to the requirements referred to in sub-paragraph (a).

Commencement Information

I11Sch. 1 para. 11 in force at 29.7.2021, see reg. 1(1)

12.—(1) For each safety-critical system used in the proposed spaceflight activities—

(a)a description, drawing and schematic diagram of the system;

(b)a statement of the system’s purpose;

(c)documentation justifying the choice of design for that system;

(d)a description of each way that system could fail;

(e)predicted probabilities of failure and, where known, failure frequencies;

(f)predicted consequences of failure;

(g)a description of any method used to check that the applicant has correctly identified the environment within which the system is expected to operate;

(h)a description of the methods used to—

(i)design, test and qualify the system;

(ii)accept the system hardware and any software for use;

(iii)determine the service life of the system and the major phases of its lifecycle;

(i)the criteria and procedures for disposal or refurbishment of the system or its major components;

(j)a description of any standards used in paragraphs (a) to (i).

(2) In this paragraph, “safety-critical system” means any system, including hardware and software, the performance of which is essential to preventing a major accident as a result of the proposed spaceflight activities.

Commencement Information

I12Sch. 1 para. 12 in force at 29.7.2021, see reg. 1(1)

13.  A description of the engineering practices used in the design, manufacture, assembly and operation of the launch vehicle including of—

(a)the design and analysis tools used;

(b)any national or international design, engineering or safety standards followed;

(c)test, validation and verification procedures undertaken or to be undertaken as required by regulation 94.

Commencement Information

I13Sch. 1 para. 13 in force at 29.7.2021, see reg. 1(1)

14.  A description of the engineering practices and design and operational measures that will be used to prevent or mitigate the creation of space debris during the proposed spaceflight activities, including identification of methods for verifying and validating those practices and measures.

Commencement Information

I14Sch. 1 para. 14 in force at 29.7.2021, see reg. 1(1)

15.  Descriptions of any hazardous material that is part of the launch vehicle or payload or is to be carried on board the launch vehicle during the proposed spaceflight activities.

Commencement Information

I15Sch. 1 para. 15 in force at 29.7.2021, see reg. 1(1)

16.  For any payload that the launch vehicle will carry, technical particulars relevant to the risk of a major accident, including—

(a)descriptions of any systems on board the payload that are required for the basic operation of the payload or necessary to carry out its intended mission;

(b)information about any hazardous material or any equipment or device carried on board the payload that could give rise to a major accident hazard;

(c)a description of any ground support equipment needed for the payload or its integration with the launch vehicle;

(d)information about any essential interface between the payload and specific equipment at the place of launch.

Commencement Information

I16Sch. 1 para. 16 in force at 29.7.2021, see reg. 1(1)

17.  Technical particulars of and performance data for any carrier aircraft intended to be used, including any existing aircraft certification or permit.

Commencement Information

I17Sch. 1 para. 17 in force at 29.7.2021, see reg. 1(1)

Flight safety analysisU.K.

18.—(1) The hazards mentioned in regulation 26(2) which the applicant must consider in carrying out the flight safety analysis are—

(a)blast overpressure;

(b)fragmentation debris;

(c)thermal radiation;

(d)toxic release;

(e)major accident hazards arising from—

(i)any discarded part of the launch vehicle and any object, including any payload, released or separated from the launch vehicle;

(ii)collision with a space object;

(iii)meteorological or environmental conditions;

(iv)the use of a carrier aircraft, if applicable;

(v)re-entry of the launch vehicle, or any part of it, from orbit, if applicable.

(2) The matters mentioned in regulation 26(3) which the applicant must take into account in carrying out the flight safety analysis are—

(a)the locations of individuals who could be harmed by any of the identified hazards;

(b)the applicant’s own and each proposed range control service provider’s capabilities in—

(i)tracking;

(ii)telemetry;

(iii)communications;

(c)how any flight safety system will be activated if its activation is necessary;

(d)how the applicant will coordinate and communicate with air traffic control service providers, meteorological information providers and emergency services;

(e)any legal requirements relevant to the applicant’s proposed use of airspace;

(f)information available about any known space object with which there is a risk of the launch vehicle colliding.

Commencement Information

I18Sch. 1 para. 18 in force at 29.7.2021, see reg. 1(1)

Ground safety analysisU.K.

19.  The hazards mentioned in regulation 27(5) which the applicant must consider in carrying out the ground safety analysis are—

(a)blast overpressure;

(b)fragmentation debris;

(c)thermal radiation;

(d)toxic release;

(e)major accident hazards arising from—

(i)hazardous material;

(ii)contamination of hazardous material intended for use in the launch vehicle;

(iii)impact damage and mechanical damage;

(iv)meteorological or environmental conditions;

(v)sources of electrical discharge.

Commencement Information

I19Sch. 1 para. 19 in force at 29.7.2021, see reg. 1(1)

(1)

ECSS-E-ST-10-06C (https://ecss.nl/standard/ecss-e-st-10-06c-technical-requirements-specification). The specification is annexed to the guidance for launch operator and return operator applicants and licensees, available on the CAA’s website (www.caa.co.uk). A paper copy of that guidance may be requested by writing to the CAA at Aviation House, Beehive Ringroad, Crawley, West Sussex RH6 0YR.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan heb Atodlenni

Yr Offeryn Cyfan heb Atodlenni you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill