The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)
 Help about opening options

Dewisiadau AgorExpand opening options

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). Dim ond ar ei ffurf wreiddiol y mae’r eitem hon o ddeddfwriaeth ar gael ar hyn o bryd.

39.—(1) The following provisions of this Schedule, unless otherwise agreed in writing between Network Rail and the Trust, have effect.

(2) In this Schedule—

construction”, in relation to any specified work or protective work, includes—

(a)

the execution and placing of that work; and

(b)

any replacing, relaying, removal, alteration, renewal, maintenance, repair or reconstruction of that work as may be carried out during the period of 12 months from the completion of the work;

and “construct” and “constructed” have corresponding meanings;

detriment” means any damage to the waterways or any other property of the Trust and, without limitation on the scope of that meaning, includes—

(a)

the erosion of the bed or banks of the waterways, or the impairment of the stability of any works, lands or premises forming part of the waterways;

(b)

the silting of the waterways or the deposit of materials in the waterways so as to permanently damage the waterways;

(c)

the pollution of the waterways;

(d)

any permanent alteration in the water level of the waterways, or permanent interference with the supply of water to the waterways, or drainage of water from it; and

(e)

any permanent harm to the ecology of the waterways (including any permanent adverse impact on any site of special scientific interest comprised in the waterways);

the engineer” means an engineer appointed by the Trust for the purpose in question;

plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;

protective work” means a work which is reasonably necessary to be carried out before the commencement of construction of any specified work to prevent detriment;

specified work” means so much of any of the authorised works as is situated upon, a cross under, over or within 15 metres of, or may directly and physically affect, the waterways; and

the waterways” means the Huddersfield Broad Canal and the Calder and Hebble Navigation, and includes any works, lands or premises belonging to the Trust, or under its management or control, that are held and used by the Trust in connection with the waterways.