Chwilio Deddfwriaeth

The East Anglia TWO Offshore Wind Farm Order 2022

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: SCHEDULE 18

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The East Anglia TWO Offshore Wind Farm Order 2022, SCHEDULE 18. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 44

SCHEDULE 18E+W+SOffshore Ornithology Compensation Measures

PART 1E+W+SFlamborough and Filey Coast Special Protection Area: Kittiwake Compensation Measures

1.  In this Part—E+W+S

the kittiwake compensation plan” means Appendix 1 of the Offshore Ornithology Without Prejudice Compensation Measures.

Commencement Information

I1Sch. 18 Pt. 1 para. 1 in force at 22.4.2022, see art. 1(2)

2.  The authorised development may not be commenced until a plan for the work of the kittiwake compensation steering group (“KCSG”) has been submitted to and approved by the Secretary of State. Such plan to include—E+W+S

(a)terms of Reference of the KCSG;

(b)details of the membership of the KCSG;

(c)details of the schedule of meetings, timetable for preparation of the kittiwake implementation and monitoring plan (the “KIMP”) and reporting and review periods; and

(d)the dispute resolution mechanism.

Commencement Information

I2Sch. 18 Pt. 1 para. 2 in force at 22.4.2022, see art. 1(2)

3.  Following consultation with the KCSG, the KIMP must be submitted to and approved by the Secretary of State (in consultation with the MMO, the local planning authority for the land containing the artificial nest site, and the relevant statutory nature conservation body). The KCSG must be consulted further as required during the approval process. The KIMP must be based on the strategy for kittiwake compensation set out in the kittiwake compensation plan and include—E+W+S

(a)details of the location where compensation measures will be deployed, why the location is appropriate ecologically and likely to support successful compensation, and details of agreements demonstrating how the land and/or rights will or have been secured to deliver the ecology objectives of the KIMP;

(b)details of designs of the artificial nest site including the type of nesting structure; and how risks from avian or mammalian predation and unauthorised human access will be mitigated;

(c)an implementation timetable for delivery of the artificial nest structure that ensures relevant compensation measures are in place to allow four full kittiwake breeding seasons prior to the operation of any wind turbine generator forming part of the authorised development;

(d)details of the proposed ongoing monitoring of the measures including: survey methods; survey programmes; success criteria; recording of KCSG consultations and project reviews; adaptive management measures and details of the factors used to trigger alternative compensation measures and/or adaptive management measures;

(e)details of the artificial nesting site maintenance schedule; and

(f)provision for annual reporting to the Secretary of State, to include details of the number of birds colonising the site including: evidence of birds prospecting; nesting attempts; egg laying; hatching; and fledging, to identify barriers to breeding success and target alternative or adaptive management measures.

Commencement Information

I3Sch. 18 Pt. 1 para. 3 in force at 22.4.2022, see art. 1(2)

4.  The undertaker must not commence the authorised development unless it has first—E+W+S

(a)provided a reasonable estimate of the cost of delivery of the compensation measures; and

(b)put in place either—

(i)a guarantee in respect of the reasonable estimate of costs associated with the delivery of the compensation measures; or

(ii)an alternative form of security for that purpose,

that has been approved by the Secretary of State.

Commencement Information

I4Sch. 18 Pt. 1 para. 4 in force at 22.4.2022, see art. 1(2)

5.  The undertaker must implement the measures as set out in the KIMP approved by the Secretary of State, unless otherwise agreed in writing by the Secretary of State in consultation with the relevant statutory nature conservation body and the relevant local planning authority. In particular, no operation of any turbine forming part of the authorised development may begin until four full breeding seasons following the implementation of the measures set out in the KIMP have elapsed. For the purposes of this paragraph each breeding season is assumed to have commenced on 1st March in each year and ended on 30th September.E+W+S

Commencement Information

I5Sch. 18 Pt. 1 para. 5 in force at 22.4.2022, see art. 1(2)

6.  The undertaker shall notify the Secretary of State of completion of implementation of the measures set out in the KIMP.E+W+S

Commencement Information

I6Sch. 18 Pt. 1 para. 6 in force at 22.4.2022, see art. 1(2)

7.  Results from the monitoring scheme must be submitted at least annually to the Secretary of State and the relevant statutory nature conservation body. This must include details of any finding that the measures have been ineffective in securing an increase in the number of adult kittiwakes available to recruit to the SPA and, in such case, proposals to address this. Any proposals to address effectiveness must thereafter be implemented by the undertaker as approved in writing by the Secretary of State in consultation with the relevant statutory nature conservation body.E+W+S

Commencement Information

I7Sch. 18 Pt. 1 para. 7 in force at 22.4.2022, see art. 1(2)

8.  The artificial nest structure must not be decommissioned without written approval of the Secretary of State, in consultation with the relevant statutory nature conservation body. The artificial nest structures shall be maintained beyond the operational lifetime of the authorised development if they are colonised, and routine and adaptive management measures and monitoring must continue whilst the artificial nesting structures are in place.E+W+S

Commencement Information

I8Sch. 18 Pt. 1 para. 8 in force at 22.4.2022, see art. 1(2)

9.  The KIMP approved under this Schedule includes any amendments that may subsequently be approved in writing by the Secretary of State. Any amendments to or variations of the approved KIMP must be in accordance with the principles set out in the kittiwake compensation plan and may only be approved where it has been demonstrated to the satisfaction of the Secretary of State that it is unlikely to give rise to any materially new or materially different environmental effects from those considered in the kittiwake compensation plan.E+W+S

Commencement Information

I9Sch. 18 Pt. 1 para. 9 in force at 22.4.2022, see art. 1(2)

10.  In the event of any conflict or inconsistency between the terms of the kittwake compensation plan and the provisions of this Order, the provisions of this Order shall prevail.E+W+S

Commencement Information

I10Sch. 18 Pt. 1 para. 10 in force at 22.4.2022, see art. 1(2)

PART 2E+W+SAlde-Ore Estuary Special Protection Area: Lesser black-backed gull Compensation Measures

1.  In this Part—E+W+S

the lesser black-backed gull compensation plan” means Appendices 5 and 7 of the Offshore Ornithology Without Prejudice Compensation Measures.

Commencement Information

I11Sch. 18 Pt. 2 para. 1 in force at 22.4.2022, see art. 1(2)

2.  The authorised development may not be commenced until a plan for the work of the lesser black-backed gull compensation steering group (“LBBCSG”) has been submitted to and approved by the Secretary of State. Such plan to include—E+W+S

(a)terms of Reference of the LBBCSG;

(b)details of the membership of the LBBCSG;

(c)details of the schedule of meetings, timetable for preparation of the lesser black-backed gull implementation and monitoring plan (the “LBBIMP”) and reporting and review periods; and

(d)the dispute resolution mechanism.

Commencement Information

I12Sch. 18 Pt. 2 para. 2 in force at 22.4.2022, see art. 1(2)

3.  Following consultation with the LBBCSG, the LBBIMP must be submitted to the Secretary of State for approval (in consultation with the MMO, the local planning authority for any land containing the predator control fencing, and the relevant statutory nature conservation body). The LBBCSG must be consulted further as required during the approval process. The LBBIMP must be based on the strategy for lesser black-backed gull compensation set out in the lesser black-backed gull compensation plan and include—E+W+S

(a)details of the location where compensation measures will be deployed, why the location is appropriate ecologically and likely to support successful compensation, and details of agreements demonstrating how any land and/or rights will or have been secured to deliver the ecology objectives of the LBBIMP;

(b)details of designs of any predator control fencing including the type of fencing and area and location of enclosure, and details of any other habitats management measures;

(c)an implementation timetable for delivery of any predator control fencing and any other habitat management measures that ensures relevant compensation measures are in place to allow four full lesser black-backed gull breeding seasons prior to the operation of any wind turbine generator forming part of the authorised development;

(d)details of the proposed ongoing monitoring of the measures including: survey methods; survey programmes; success criteria; recording of LBBCSG consultations and project reviews; adaptive management measures and details of the factors used to trigger alternative compensation measures and/ or adaptive management measures;

(e)details of the maintenance schedule for any predator proof fencing; and

(f)details of the work in respect of ornithological by-catch measures as set out in Appendix 7 of the Offshore Ornithology Without Prejudice Compensation Measures, that could support practical management measures to reduce ornithological by-catch, and which would be undertaken alongside or in place of the predator control fencing.

Commencement Information

I13Sch. 18 Pt. 2 para. 3 in force at 22.4.2022, see art. 1(2)

4.  The undertaker must not commence the authorised development unless it has first—E+W+S

(a)provided a reasonable estimate of the cost of delivery of the compensation measures; and

(b)put in place either—

(i)a guarantee in respect of the reasonable estimate of costs associated with the delivery of the compensation measures; or

(ii)an alternative form of security for that purpose,

that has been approved by the Secretary of State.

Commencement Information

I14Sch. 18 Pt. 2 para. 4 in force at 22.4.2022, see art. 1(2)

5.  The undertaker must implement the measures as set out in the LBBIMP approved by the Secretary of State, unless otherwise agreed in writing by the Secretary of State in consultation with the relevant statutory nature conservation body and the relevant local planning authority. In particular, no operation of any turbine forming part of the authorised development may begin until four full breeding seasons following the implementation of the measures set out in the LBBIMP have elapsed. For the purposes of this paragraph each breeding season is assumed to have commenced on 1st March in each year and ended on 30th September.E+W+S

Commencement Information

I15Sch. 18 Pt. 2 para. 5 in force at 22.4.2022, see art. 1(2)

6.  The undertaker shall notify the Secretary of State of completion of implementation of the measures set out in the LBBIMP.E+W+S

Commencement Information

I16Sch. 18 Pt. 2 para. 6 in force at 22.4.2022, see art. 1(2)

7.  Results from the monitoring scheme must be submitted at least annually to the Secretary of State and the relevant statutory nature conservation body. This must include details of any finding that the measures have been ineffective in securing an increase in the number of adult lesser black-backed gulls available to recruit to the SPA and, in such case, proposals to address this. Any proposals to address effectiveness must thereafter be implemented by the undertaker as approved in writing by the Secretary of State in consultation with the relevant statutory nature conservation body.E+W+S

Commencement Information

I17Sch. 18 Pt. 2 para. 7 in force at 22.4.2022, see art. 1(2)

8.  Any predator proof fencing installed must not be decommissioned without written approval of the Secretary of State, in consultation with the relevant statutory nature conservation body. The predator control fencing shall be maintained beyond the operational lifetime of the authorised development if the site is colonised. The routine and adaptive management measures and monitoring should continue whilst the fencing is in place.E+W+S

Commencement Information

I18Sch. 18 Pt. 2 para. 8 in force at 22.4.2022, see art. 1(2)

9.  The LBBIMP approved under this Schedule includes any amendments that may subsequently be approved in writing by the Secretary of State. Any amendments to or variations of the approved LBBIMP must be in accordance with the principles set out in the lesser black-backed gull compensation plan and may only be approved where it has been demonstrated to the satisfaction of the Secretary of State that it is unlikely to give rise to any materially new or materially different environmental effects from those considered in the lesser black-backed gull compensation plan.E+W+S

Commencement Information

I19Sch. 18 Pt. 2 para. 9 in force at 22.4.2022, see art. 1(2)

10.  In the event of any conflict or inconsistency between the terms of the lesser black-backed gull compensation plan and the provisions of this Order, the provisions of this Order shall prevail.E+W+S

Commencement Information

I20Sch. 18 Pt. 2 para. 10 in force at 22.4.2022, see art. 1(2)

PART 3E+W+SOuter Thames Estuary Special Protection Area: Red-throated diver Compensation Measures

1.  In this Part—E+W+S

the red-throated diver compensation plan” means Appendix 6 of the Offshore Ornithology Without Prejudice Compensation Measures.

Commencement Information

I21Sch. 18 Pt. 3 para. 1 in force at 22.4.2022, see art. 1(2)

2.  The authorised development may not be commenced until a plan for the work of the red-throated diver compensation steering group (“RTDCSG”) has been submitted to and approved by the Secretary of State. Such plan to include—E+W+S

(a)terms of Reference of the RTDCSG;

(b)details of the membership of the RTDCSG;

(c)details of the schedule of meetings, timetable for preparation of the [F1red-throated diver] implementation and monitoring plan (the “RTDIMP”) and reporting and review periods; and

(d)the dispute resolution mechanism.

Textual Amendments

Commencement Information

I22Sch. 18 Pt. 3 para. 2 in force at 22.4.2022, see art. 1(2)

3.  Following consultation with the RTDCSG, the RTDIMP must be submitted to the Secretary of State for approval (in consultation with the MMO and the relevant statutory nature conservation body). The RTDCSG must be consulted further as required during the approval process. The RTDIMP must be based on the strategy for red-throated diver compensation set out in the red-throated diver compensation plan and include—E+W+S

(a)details of the location where compensation measures will be deployed, why the location is appropriate ecologically and likely to support successful compensation, and details of agreements demonstrating how the vessel route diversions and/or exclusions will or have been secured to deliver the ecology objectives of the RTDIMP;

(b)an implementation timetable for delivery of the vessel route diversion and/or exclusion compensation measures [F2that] ensures that the measures are in place prior to the installation of any tower comprised within a wind turbine generator forming part of the authorised development;

(c)details in relation to the monitoring of red-throated diver abundance and distribution using aerial digital surveys in the Outer Thames Estuary SPA and a 10km buffer over two winters. Three surveys should take place each winter (between 1st November and 31st March) with one batch to take place before the installation of the turbines forming part of the authorised development and the other batch to take place after;

(d)details of the proposed ongoing monitoring of the measures including: survey methods; survey programmes; success criteria; recording of RTDCSG consultations and project reviews; details of the factors used to trigger alternative compensation measures and/or adaptive management measures;

(e)details in relation to the convening of a partnership with relevant authorities and user representation to—

(i)improve understanding of disturbance and displacement effects on red-throated diver within the Outer Thames Estuary SPA;

(ii)identify and implement opportunities to reduce these effects; and

(iii)ensure stakeholder engagement and liaison to raise awareness and communicate any proposed changes in usage; and

(f)details of the work in respect of ornithological by-catch measures as set out in Appendix 7 of the Offshore Ornithology Without Prejudice Compensation Measures, that could support practical management measures to reduce ornithological by-catch F3... .

Textual Amendments

Commencement Information

I23Sch. 18 Pt. 3 para. 3 in force at 22.4.2022, see art. 1(2)

4.  The undertaker must not commence the authorised development unless it has first—E+W+S

(a)provided a reasonable estimate of the cost of delivery of the compensation measures; and

(b)put in place either—

(i)a guarantee in respect of the reasonable estimate of costs associated with the delivery of the compensation measures; or

(ii)an alternative form of security for that purpose,

that has been approved by the Secretary of State.

Commencement Information

I24Sch. 18 Pt. 3 para. 4 in force at 22.4.2022, see art. 1(2)

5.  The undertaker must implement the measures as set out in the RTDIMP approved by the Secretary of State unless otherwise agreed in writing by the Secretary of State in consultation with the relevant statutory nature conservation body and the relevant local planning authority. No tower comprised within a wind turbine generator forming part of the authorised development may be installed until the implementation of relevant measures as set out in the RTDIMP.E+W+S

Commencement Information

I25Sch. 18 Pt. 3 para. 5 in force at 22.4.2022, see art. 1(2)

6.  The undertaker shall notify the Secretary of State of completion of implementation of the measures set out in the RTDIMP. Once implemented, the measures should remain in place throughout the operational lifetime of the authorised development.E+W+S

Commencement Information

I26Sch. 18 Pt. 3 para. 6 in force at 22.4.2022, see art. 1(2)

7.  Results from the monitoring scheme and aerial digital surveys must be submitted at least annually to the Secretary of State and the relevant statutory nature conservation body. This must include details of any finding that the measures have been ineffective in securing the maintenance of the SPA’s conservation objectives and, in such case, proposals to address this. Any proposals to address effectiveness must thereafter be implemented by the undertaker as approved in writing by the Secretary of State in consultation with the relevant statutory nature conservation body.E+W+S

Commencement Information

I27Sch. 18 Pt. 3 para. 7 in force at 22.4.2022, see art. 1(2)

8.  The RTDIMP approved under this Schedule includes any amendments that may subsequently be approved in writing by the Secretary of State. Any amendments to or variations of the approved RTDIMP must be in accordance with the principles set out in the red-throated diver compensation plan and may only be approved where it has been demonstrated to the satisfaction of the Secretary of State that it is unlikely to give rise to any materially new or materially different environmental effects from those considered in the red-throated diver compensation plan.E+W+S

Commencement Information

I28Sch. 18 Pt. 3 para. 8 in force at 22.4.2022, see art. 1(2)

9.  In the event of any conflict or inconsistency between the terms of the red-throated diver compensation plan and the provisions of this Order, the provisions of this Order shall prevail.E+W+S

Commencement Information

I29Sch. 18 Pt. 3 para. 9 in force at 22.4.2022, see art. 1(2)

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill