Chwilio Deddfwriaeth

The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about opening options

Dewisiadau AgorExpand opening options

Changes to legislation:

There are currently no known outstanding effects for the The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022. Help about Changes to Legislation

PART 1E+WPRELIMINARY

Citation and commencementE+W

1.  This Order may be cited as the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 and comes into force on 2nd June 2022.

Commencement Information

I1Art. 1 in force at 2.6.2022, see art. 1

InterpretationE+W

2.—(1) In this Order—

the 1961 Act” means the Land Compensation Act 1961(1);

the 1965 Act” means the Compulsory Purchase Act 1965(2);

the 1980 Act” means the Highways Act 1980(3);

the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981(4);

the 1984 Act” means the Road Traffic Regulation Act 1984(5);

the 1990 Act” means the Town and Country Planning Act 1990(6);

the 1991 Act” means the New Roads and Street Works Act 1991(7);

the 2008 Act” means the Planning Act 2008(8);

address” includes any number or address for the purposes of electronic transmission;

apparatus” has the same meaning as in Part 3 of the 1991 Act;

authorised development” means the development described in Schedule 1 (authorised development) and any other development authorised by this Order, which is development within the meaning of section 32 (meaning of development) of the 2008 Act;

the book of reference” means the book of reference listed in Schedule 11 (documents to be certified) and certified by the Secretary of State under article 45 (certification of documents, etc.) as the book of reference for the purposes of this Order;

bridleway” has the same meaning as in section 329(1) (further provision as to interpretation) of the 1980 Act;

building” includes any structure or erection or any part of a building, structure or erection;

carriageway” has the same meaning as in section 329(1) of the 1980 Act;

cycle track” has the same meaning as in section 329(1) of the 1980 Act(9);

cycleway” means a way constituting or comprised in a highway, being a way over which the public have the following, but no other rights of way, that is to say a right of way on pedal cycles (other than pedal cycles that are motor vehicles within the meaning of the Road Traffic Act 1988(10)) with a right of way on foot and a right of way on horseback or leading a horse;

electronic transmission” means a communication transmitted—

(a)

by means of an electronic communications network; or

(b)

by other means but while in electronic form,

and in this definition “electronic communications network” has the same meaning as in section 32(1) (meaning of electronic communications networks and [F1services)] of the Communications Act 2003(11);

the engineering drawings and sections” means the drawings and sections listed in Schedule 11 (documents to be certified) and certified as the engineering drawings and sections by the Secretary of State under article 45 (certification of documents, etc.) for the purposes of this Order;

environmental statement” means the document of that description listed in Schedule 11 (documents to be certified) and certified as the environmental statement by the Secretary of State under article 45 (certification of documents, etc.) for the purposes of this Order;

footway” and “footpath” have the same meaning as in section 329(1) of the 1980 Act;

highway”, “highway authority” and “local highway authority” have the same meaning as in the 1980 Act;

the land plans” means the plans of that description listed in Schedule 11 (documents to be certified) and certified as the land plans by the Secretary of State under article 45 (certification of documents, etc.) for the purposes of this Order;

limits of deviation” means the limits of deviation referred to in article 7 (limits of deviation);

maintain” in relation to any part of the authorised development includes to inspect, repair, adjust, landscape, preserve, remove, reconstruct, refurbish or replace, provided such works do not give rise to any materially new or materially different environmental effects to those identified in the environmental statement, and any derivative of “maintain” is to be construed accordingly;

Order land” means the land shown on the land plans which is within the limits of land to be acquired or used permanently or temporarily and described in the book of reference;

the Order limits” means the limits of lands to be acquired or used permanently or temporarily shown on the land plans and works plans within which the authorised development may be carried out;

owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 1981(12);

the permit scheme” means the Traffic Management (Surrey County Council) Permit Scheme Order 2015 (as varied) made under Part 3 (permit schemes) of the Traffic Management Act 2004(13) as in force at the date on which this Order is made;

relevant planning authority” means, in relation to any provision of this Order, either Guildford Borough Council or Elmbridge Borough Council in their capacity as local planning authorities insofar as the matter in question falls within their respective administrative areas, or both, as the case may be;

the special category land plans” means the plans of that description listed in Schedule 11 (documents to be certified) and certified by the Secretary of State under article 45 (certification of documents, etc.) as the special category land plans for the purposes of this Order;

the speed limits and traffic regulations plans” means the plans of that description listed in Schedule 11 (documents to be certified) and certified by the Secretary of State under article 45 (certification of documents, etc.) as the speed limits and traffic [F2regulations] plans for the purposes of this Order;

special road” means a highway which is a special road in accordance with section 16(14) (general provisions as to special roads) of the 1980 Act or by virtue of an order granting development consent;

statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land) of the 2008 Act;

street” means a street within the meaning of section 48(15) (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;

street authority”, in relation to a street, has the same meaning as in Part 3 (street works in England and Wales) of the 1991 Act;

streets, rights of way and access plans” means the plans of that description listed in Schedule 11 (documents to be certified) and certified as the streets, rights of way and access plans by the Secretary of State under article 45 (certification of documents, etc.) for the purposes of this Order;

traffic authority” has the same meaning as in section 121A(16) (traffic authorities) of the 1984 Act;

trunk road” means a highway which is a trunk road by virtue of—

(a)

section 10(17) (general provision as to trunk roads) or 19(1)(18) (certain special roads and other highways to become trunk roads) of the 1980 Act;

(b)

an order or direction under section 10 of that Act;

(c)

an order granting development consent; or

(d)

any other enactment;

undertaker” means National Highways Limited, company number 09346363, whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ;

watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain; and

the works plans” means the plans listed in Schedule 11 (documents to be certified) and certified as the works plans by the Secretary of State under article 45 (Certification of documents, etc.) for the purposes of this Order.

(2) References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or is otherwise comprised in the Order land.

(3) All distances, directions and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.

(4) For the purposes of this Order, all areas described in square metres in the book of reference are approximate.

(5) References in this Order to points identified by letters or numbers are to be construed as references to points so lettered or numbered on the streets, rights of way and access plans.

(6) References in this Order to numbered works are references to works as numbered in Schedule 1 (authorised development).

Disapplication of legislative provisionsE+W

3.—(1) The following provisions do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development—

(a)regulation 12 (requirement for environmental permit) of the Environmental Permitting (England and Wales) Regulations 2016(19) in relation to the carrying on of a flood risk activity;

(b)the provisions of any byelaws made under, or having effect as if made under, paragraph 5, 6 or 6A of Schedule 25 (byelaw making powers of the appropriate agency) to the Water Resources Act 1991(20);

(c)section 23 (prohibition on obstructions etc in watercourses) of the Land Drainage Act 1991(21);

(d)section 32(22) (variation of awards) of the Land Drainage Act 1991;

(e)the provisions of any byelaws made under section 66(23) (powers to make byelaws) of the Land Drainage Act 1991; and

(f)section 28E (duties in relation to sites of special scientific interest) of the Wildlife and Countryside Act 1981(24).

(2) In paragraph (1)(a) “flood risk activity” has the meaning given in the Environmental Permitting (England and Wales) Regulations 2016.

(3) The provisions of the Neighbourhood Planning Act 2017(25), insofar as they relate to temporary possession of land under articles 32 (temporary use of land for carrying out the authorised development) and 33 (temporary use of land for maintaining the authorised development) of this Order, do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development and, within the maintenance period defined in article 33(11), any maintenance of any part of the authorised development.

Commencement Information

I3Art. 3 in force at 2.6.2022, see art. 1

PART 2E+WPRINCIPAL POWERS

Development consent etc. granted by the OrderE+W

4.—(1) Subject to the provisions of this Order including the requirements in Schedule 2 (requirements), the undertaker is granted development consent for the authorised development to be carried out within the Order limits.

(2) Any enactment applying to land within or adjacent to the Order limits has effect subject to the provisions of this Order.

Commencement Information

I4Art. 4 in force at 2.6.2022, see art. 1

Maintenance of authorised developmentE+W

5.  The undertaker may at any time maintain the authorised development, except to the extent that this Order, or an agreement made under this Order, provides otherwise.

Commencement Information

I5Art. 5 in force at 2.6.2022, see art. 1

Maintenance of drainage worksE+W

6.—(1) Nothing in this Order, or the construction, maintenance or operation of the authorised development under it, affects any responsibility for the maintenance of any works connected with the drainage of land, whether that responsibility is imposed or allocated by or under any enactment, or otherwise, unless otherwise agreed in writing between the undertaker and the person responsible.

(2) In this article “drainage” has the same meaning as in section 72 (interpretation) of the Land Drainage Act 1991(26).

Commencement Information

I6Art. 6 in force at 2.6.2022, see art. 1

Limits of deviationE+W

7.  In carrying out the authorised development the undertaker may—

(a)deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; and

(b)deviate vertically from the levels of the authorised development shown on the engineering drawings and sections to a maximum of 0.50 metres upwards or 0.50 metres downwards,

except that these maximum limits of vertical deviation do not apply where it is demonstrated by the undertaker to the Secretary of State’s satisfaction, and the Secretary of State, following consultation with the relevant planning authority and the local highway authority, certifies accordingly that a deviation in excess of these limits would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

Commencement Information

I7Art. 7 in force at 2.6.2022, see art. 1

Benefit of OrderE+W

8.—(1) Subject to paragraph (2) and article 9 (consent to transfer benefit of Order), the provisions of this Order conferring powers on the undertaker have effect solely for the benefit of the undertaker.

(2) Paragraph (1) does not apply to the works for which consent is granted by this Order for the express benefit of owners and occupiers of land, statutory undertakers and other persons affected by the authorised development.

Commencement Information

I8Art. 8 in force at 2.6.2022, see art. 1

Consent to transfer benefit of OrderE+W

9.—(1) Subject to paragraphs (4) and (5), the undertaker may—

(a)transfer to another person (“the transferee”) any or all of the benefit of the provisions of this Order and such related statutory rights as may be agreed between the undertaker and the transferee; or

(b)grant to another person (“the lessee”) for a period agreed between the undertaker and the lessee any or all of the benefit of the provisions of this Order and such related statutory rights as may be so agreed.

(2) Where an agreement has been made in accordance with paragraph (1) references in this Order to the undertaker, except in paragraph (3), includes references to the transferee or the lessee.

(3) The exercise by a person of any benefits or rights conferred in accordance with any transfer or grant under paragraph (1) is subject to the same restrictions, liabilities and obligations as would apply under this Order if those benefits or rights were exercised by the undertaker.

(4) If the benefit of the provisions of this Order relating to compulsory acquisition is transferred or granted to a transferee or lessee pursuant to this article and the transferee or lessee exercises those powers then the undertaker alone is liable for any compensation that is payable to another party as a consequence of the exercise of those powers by the transferee or lessee.

(5) The consent of the Secretary of State is required for a transfer or grant under this article, except where the transfer or grant is made to—

[F3(za)South Eastern Power Networks plc (company number 03043097, whose registered office is at Newington House, 237 Southwark Bridge Road, London, SE1 6NP) for the purposes of undertaking Work No. 62(a) to (q);]

(a)Southern Gas Networks PLC (company number 5167021, whose registered office is at St Lawrence House, Station Approach, Horley, Surrey, RH6 9HJ) for the purposes of undertaking Work No. 63(a) to 63(e);

(b)Affinity Water Limited (company number 2546950, whose registered office is at Tamblin Way, Hatfield, Hertfordshire, AL10 9EZ) for the purposes of undertaking Work No. 64(a) to 64(k);

(c)British Telecommunications PLC (company number 1800000, whose registered office is at 81 Newgate Street, London, EC1A 7AJ) ) for the purposes of undertaking Work No. 65(a) to 65(f);

(d)Sky Telecommunications Services Limited (company number 2883980, whose registered office is at Grant Way, Isleworth, Middlesex, TW7 5QD) for the purposes of undertaking Work No. 65(g); or

(e)Virgin Media Limited (company number 2591237, whose registered office is at 500 Brook Drive, Reading, RG2 6UU) for the purposes of undertaking Work No. 65(g) and 65(h).

Textual Amendments

Commencement Information

I9Art. 9 in force at 2.6.2022, see art. 1

Planning permissionE+W

10.  If planning permission is issued pursuant to the 1990 Act for development any part of which is within the Order limits following the publication of this Order that is—

(a)not itself a nationally significant infrastructure project under the 2008 Act or part of such a project; or

(b)required to complete or enable the construction, use or operation of any part of the development authorised by this Order,

then the carrying out, use or operation of such development pursuant to the terms of the planning permission is not to constitute a breach of the terms of this Order.

Commencement Information

I10Art. 10 in force at 2.6.2022, see art. 1

PART 3E+WSTREETS

Application of the 1991 ActE+W

11.—(1) Works executed under this Order in relation to a highway which consists of or includes a carriageway are to be treated for the purposes of Part 3 (street works in England and Wales) of the 1991 Act as major highway works if—

(a)they are of a description mentioned in any of paragraphs (a), (c) to (e), (g) and (h) of section 86(3) (which defines what highway authority works are major highway works) of that Act; or

(b)they are works which, had they been executed by the highway authority, might have been carried out in exercise of the powers conferred by section 64(27) (dual carriageways and roundabouts) of the 1980 Act or section 184(28) (vehicle crossings over footways and verges) of that Act.

(2) In Part 3 of the 1991 Act, in relation to works which are major highway works by virtue of paragraph (1), references to the highway authority concerned are to be construed as references to the undertaker.

(3) The following provisions of the 1991 Act (whether modified or not by the permit scheme) do not apply in relation to any works executed under the powers of this Order—

section 56(29) (power to give directions as to timing of street works);

section 56A(30) (power to give directions as to placing of apparatus);

section 58(31) (restrictions on works following substantial road works);

section 58A(32) (restriction on works following substantial street works);

section 73A(33) (power to require undertaker to re-surface street);

section 73B(34) (power to specify timing etc. of re-surfacing);

section 73C(35) (materials, workmanship and standard of re-surfacing);

section 78A(36) (contributions to costs of re-surfacing by undertaker); and

Schedule 3A(37) (restriction on works following substantial street works).

(4) The provisions of the 1991 Act mentioned in paragraph (5) (which, together with other provisions of that Act, apply in relation to the execution of street works) and any regulations made, or code of practice issued or approved under, those provisions apply (with the necessary modifications) in relation to any stopping up, alteration or diversion of a street of a temporary nature by the undertaker under the powers conferred by article 14 (temporary closure and restriction of use of streets), whether or not the stopping up, alteration or diversion constitutes street works within the meaning of that Act.

(5) The provisions of the 1991 Act(38) referred to in paragraph (4) are—

section 54(39) (advance notice of certain works), subject to paragraph (6);

section 55(40) (notice of starting date of works), subject to paragraph (6);

section 57(41) (notice of emergency works);

section 59(42) (general duty of street authority to co-ordinate works);

section 60 (general duty of undertakers to co-operate);

section 68 (facilities to be afforded to street authority);

section 69 (works likely to affect other apparatus in the street);

section 75 (inspection fees);

section 76 (liability for cost of temporary traffic regulation); and

section 77 (liability for cost of use of alternative route),

and all such other provisions as apply for the purposes of the provisions mentioned above.

(6) Sections 54 and 55 of the 1991 Act as applied by paragraph (4) have effect as if references in section 57 of that Act to emergency works were a reference to a stopping up, alteration or diversion (as the case may be) required in a case of emergency.

(7) Nothing in article 12 (construction and maintenance of new, altered or diverted streets and other structures)—

(a)affects the operation of section 87 (prospectively maintainable highways) of the 1991 Act, and the undertaker is not by reason of any duty under that article to maintain a street, to be taken to be the street authority in relation to that street for the purposes of Part 3 of that Act; or

(b)has effect in relation to maintenance works which are street works within the meaning of the 1991 Act, as respects which the provisions of Part 3 of the 1991 Act apply.

(8) Subject to paragraph (3), the permit scheme applies to the construction and maintenance of the authorised development and will be used by the undertaker in connection with the exercise of any powers conferred by this Part.

(9) For the purposes of this Order a permit may not be granted under the permit scheme subject to conditions where compliance with those conditions would constitute a breach of this Order or where the undertaker would be unable to comply with those conditions pursuant to the powers conferred by this Order.

(10) Any difference arising between the undertaker and Surrey County Council under the permit scheme will be referred to the appeals procedure under section 7.2 of the permit scheme.

(11) Where agreement cannot be reached under sub-paragraph (10) the undertaker and Surrey County Council may refer the dispute to independent adjudication under section 7.3 of the permit scheme or where this is not agreed, the dispute will be resolved by arbitration under article 48 (arbitration).

(12) Any order which may be made by the Secretary of State under section 74A(2)(43) of the 1991 Act designating Surrey County Council as an approved authority for the purposes of the Street Works (Charges for Occupation of the Highway) (England) Regulations 2012(44) will not have effect in relation to works carried out by the undertaker as part of the construction or maintenance of the authorised development.

Commencement Information

I11Art. 11 in force at 2.6.2022, see art. 1

Construction and maintenance of new, altered or diverted streets and other structuresE+W

12.—(1) Any highway (other than a trunk road or special road) to be constructed under this Order must be completed to the reasonable satisfaction of the local highway authority in whose area the highway lies and, unless otherwise agreed in writing between the undertaker and the local highway authority, the highway including any structures or culverts laid under it must be maintained by and at the expense of the local highway authority from its completion.

(2) Where a highway (other than a trunk road or special road) is altered or diverted under this Order, the altered or diverted part of the highway must, when completed to the reasonable satisfaction of the local highway authority in whose area the highway lies and, unless otherwise agreed in writing between the undertaker and the local highway authority, be maintained by and at the expense of the local highway authority from its completion.

(3) Where a street which is not, and is not intended to be, a highway is constructed, altered or diverted under this Order, the street (or part of the street as the case may be) must, when completed to the reasonable satisfaction of the street authority, unless otherwise agreed in writing, be maintained by and at the expense of the undertaker for a period of 12 months from its completion and at the expiry of that period by and at the expense of the street authority.

(4) In the case of a bridge constructed under this Order to carry a highway (other than a trunk road or special road) over a trunk road or special road, the highway surface (being those elements over the waterproofing membrane and indicator layer) must be maintained by and at the expense of the local highway authority unless otherwise agreed in writing between the undertaker and the local highway authority, and the remainder of the bridge, including the waterproofing membrane, indicator layer and structure below, must be maintained by and at the expense of the undertaker.

(5) In any action against the undertaker in respect of loss or damage resulting from any failure by it to maintain a street under this article, it is a defence (without prejudice to any other defence or the application of the law relating to contributory negligence) to prove that the undertaker had taken such care as in all the circumstances was reasonably required to secure that the part of the street to which the action relates was not dangerous to traffic.

(6) For the purposes of a defence under paragraph (5), the court must in particular have regard to the following matters—

(a)the character of the street and the traffic which was reasonably to be expected to use it;

(b)the standard of maintenance appropriate for a street of that character and used by such traffic;

(c)the state of repair in which a reasonable person would have expected to find the street;

(d)whether the undertaker knew, or could reasonably have been expected to know, that the condition of the part of the street to which the action relates was likely to cause danger to users of the street; and

(e)where the undertaker could not reasonably have been expected to repair that part of the street before the cause of action arose, what warning notices of its condition had been displayed,

but for the purposes of such a defence it is not relevant to prove that the undertaker had arranged for a competent person to carry out or supervise the maintenance of the part of the street to which the action relates unless it is also proved that the undertaker had given the competent person proper instructions with regard to the maintenance of the street and that the competent person had carried out those instructions.

Commencement Information

I12Art. 12 in force at 2.6.2022, see art. 1

Classification of roads, etc.E+W

[F413.(1) The roads described in Part 1 (special roads) of Schedule 3 (classification of roads, etc.) will be—

(a)classified as special roads for the purpose of any enactment or instrument which refers to highways classified as special roads; and

(b)provided for the use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 (classes of traffic for purposes of special roads) to the 1980 Act.

(2) From the date on which the undertaker notifies the Secretary of State that the roads described in Part 1 of Schedule 3 have been completed and open for traffic—

(a)the undertaker will be the highway authority for those roads; and

(b)they are classified as trunk roads for the purpose of any enactment or instrument which refers to highways classified as trunk roads.

(3) On or after the date on which the roads described in Part 2 (trunk roads) of Schedule 3 are completed and open for traffic, they are to be trunk roads as if they had become so by virtue of an order under section 10(2) (general provision as to trunk roads) of the 1980 Act specifying that date as the date on which they were to become trunk roads.

(4) On or after the date on which the roads described in Part 3 (classified roads) of Schedule 3 are completed and open for traffic they are to become—

(a)principal roads for the purpose of any enactment or instrument which refers to highways classified as principal roads; and

(b)classified roads for the purpose of any enactment or instrument which refers to highways classified as classified roads,

as if such classification had been made under section 12(3) (general provision as to principal and classified roads) of the 1980 Act.

(5) On or after the date on which the roads described in Part 4 (unclassified roads) of Schedule 3 are complete and open for traffic, they are to become unclassified roads for the purpose of any enactment or instrument which refers to unclassified roads.

(6) The public rights of way described in Part 8 (other public rights of way) of Schedule 3 are to be of the types described in column (1) to the extent described in column (2) are open for use on or after the date on which the authorised development is open for traffic.

(7) On or after the date on which the roads specified in Part 5 (speed limits) of Schedule 3 are open for traffic, no person is to drive any motor vehicle at a speed exceeding the limit in miles per hour specified in column (3) of that Part in respect of the lengths of road identified in the corresponding row of column (2) of that Part.

(8) Subject to article 17 (clearways), on and after the date on which the roads specified in Part 6 (traffic regulation measures (clearways and prohibitions)) of Schedule 3 are open for traffic, the restrictions specified in column (3) of that Part are to apply to the lengths of the road identified in the corresponding row of column (2) of that Part.

(9) On such day as the undertaker may determine, the orders specified in column (2) of Part 7 (revocations and variations of existing traffic regulation measures (clearways and prohibitions)) of Schedule 3 are to be varied or revoked as specified in the corresponding row of column (3) of that Part in respect the lengths of roads specified in the corresponding row of column (1) of that Part.

(10) The application of paragraphs (1) to (8) may be varied or revoked by any instrument made under any enactment which provides for the variation or revocation of such matters.]

Temporary closure and restriction of use of streetsE+W

14.—(1) The undertaker, during and for the purposes of carrying out the authorised development, may temporarily close, alter, divert or restrict the use of any street and may for any reasonable time—

(a)divert the traffic from the street; and

(b)subject to paragraph (3), prevent all persons from passing along the street.

(2) Without limitation on the scope of paragraph (1), the undertaker may use any street temporarily closed or restricted under the powers conferred by this article, and which is within the Order limits, as a temporary working site.

(3) The undertaker must provide reasonable access for pedestrians going to or from premises abutting a street affected by the temporary closure, alteration or diversion of a street under this article if there would otherwise be no such access.

(4) The undertaker must not temporarily close, alter or divert any street for which it is not the street authority without the consent of the street authority, which may attach reasonable conditions to any consent but such consent must not be unreasonably withheld or delayed.

(5) Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.

(6) If a street authority which receives an application for consent under paragraph (4) fails to notify the undertaker of its decision before the end of the period of 28 days beginning with the date on which the application was made, it is deemed to have granted consent.

Commencement Information

I13Art. 14 in force at 2.6.2022, see art. 1

Permanent stopping up and restriction of use of streets and private means of accessE+W

15.—(1) Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development, stop up each of the streets and private means of access specified in column (1) of Parts 1, 2, 3, and 4 of Schedule 4 (permanent stopping up of highways and private means of access and provision of new highways and private means of access) to the extent specified and described in column (2) of those Parts of that Schedule.

(2) No street or private means of access specified in column (1) of Parts 1 and 3 of Schedule 4 is to be wholly or partly stopped up under this article unless—

(a)the new street or private means of access to be constructed and substituted for it, which is specified in column (3) of those Parts of that Schedule, has been completed to the reasonable satisfaction of the street authority and is open for use; or

(b)a temporary alternative route for the passage of such traffic as could have used the street or private means of access to be stopped up is first provided and subsequently maintained by the undertaker, to the reasonable satisfaction of the street authority, between the commencement and termination points for the stopping up of the street or private means of access until the completion and opening of the new street or private means of access in accordance with sub-paragraph (a).

(3) No street or private means of access specified in column (1) of Part 4 of Schedule 4 is to be wholly or partly stopped up under this article unless the condition specified in paragraph (4) is satisfied in relation to all the land which abuts on either side of the street or private means of access to be stopped up.

(4) The condition referred to in paragraph (3) is that—

(a)the undertaker is in possession of the land; or

(b)there is no right of access to the land from the street or private means of access concerned; or

(c)there is reasonably convenient access to the land otherwise than from the street or private means of access concerned; or

(d)the owners and occupiers of the land have agreed to the stopping up.

(5) The private means of access specified in column (1) of Part 5 of Schedule 4 are to be altered to the extent specified in the corresponding row of column (2) of that Part.

(6) Where a street or private means of access has been stopped up under this article—

(a)all rights of way over or along the street or private means of access so stopped up are extinguished; and

(b)the undertaker may appropriate and use for the purposes of the authorised development so much of the site of the street or private means of access as is bounded on both sides by land owned by the undertaker.

(7) Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.

(8) This article is subject to article 36 (apparatus and rights of statutory undertakers in stopped up streets).

Commencement Information

I14Art. 15 in force at 2.6.2022, see art. 1

Access to worksE+W

16.  The undertaker may, for the purposes of the authorised development, form and lay out means of access, or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.

Commencement Information

I15Art. 16 in force at 2.6.2022, see art. 1

ClearwaysE+W

17.—(1) Except as provided in paragraph (2), from the date on which the roads described in column (2) of Part 6 (traffic regulation measures (clearways and prohibitions)) of Schedule 3 (classification of roads, etc.) and identified in the corresponding row of column (3) of that Part as to become a clearway, are open to traffic, no person is to cause or permit any vehicle to wait on any part of the lengths of road, except upon the direction of, [F5or with the permission of], a uniformed constable or uniformed traffic officer.

(2) Nothing in paragraph (1) applies—

(a)to render it unlawful to cause or permit a vehicle to wait on any part of a road, for so long as may be necessary to enable that vehicle to be used in connection with—

(i)the removal of any obstruction to traffic;

(ii)the maintenance, improvement, reconstruction or operation of the road;

(iii)the laying, erection, maintenance or renewal in or near the road of any sewer, main pipe, conduit, wire, cable or other apparatus for the supply of gas, water, electricity or any electronic communications apparatus as defined in Schedule 3A (the electronic communications code) to the Communications Act 2003(45); or

(iv)any building operation or demolition;

(b)in relation to a vehicle being used—

(i)for police, ambulance, fire and rescue authority or traffic officer purposes;

(ii)in the service of a local authority, safety camera partnership or Driver and Vehicle Standards Agency in pursuance of statutory powers or duties;

(iii)in the service of a water or sewerage undertaker within the meaning of the Water Industry Act 1991(46); or

(iv)by a universal service provider for the purposes of providing a universal postal service as defined by the Postal Service Act 2000(47); or

(c)in relation to a vehicle waiting when the person in control of it is—

(i)required by law to stop;

(ii)obliged to stop in order to avoid an accident; or

(iii)prevented from proceeding by circumstances outside the person’s control.

(3) No person is to cause or permit any vehicle to wait on any part of the roads described in paragraph (1) for the purposes of selling, or dispensing of, goods from that vehicle, unless the goods are immediately delivered at, or taken into, premises adjacent to the land on which the vehicle stood when the goods were sold or dispensed.

(4) Paragraphs (1), (2) and (3) have effect as if made by order under the 1984 Act, and their application may be varied or revoked by an order made under that Act or any other enactment which provides for the variation or revocation of such orders.

(5) In this article, “traffic officer” means an individual designated under section 2 (designation of traffic officers) of the Traffic Management Act 2004(48).

Textual Amendments

Commencement Information

I16Art. 17 in force at 2.6.2022, see art. 1

Traffic regulationE+W

18.—(1) This article applies to roads in respect of which the undertaker is not the traffic authority.

(2) Subject to the provisions of this article, and the consent of the traffic authority in whose area the road concerned is situated, which consent must not be unreasonably withheld, the undertaker may, for the purposes of the authorised development—

(a)revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act;

(b)permit, prohibit or restrict the stopping, waiting, loading or unloading of vehicles on any road;

(c)authorise the use as a parking place of any road;

(d)make provision as to the direction or priority of vehicular traffic on any road; and

(e)permit or prohibit vehicular access to any road,

either at all times or at times, on days or during such periods as may be specified by the undertaker.

(3) The power conferred by paragraph (2) may be exercised at any time prior to the expiry of 12 months from the opening of the authorised development for public use but subject to paragraph (7) any prohibition, restriction or other provision made under paragraph (2) may have effect both before and after the expiry of that period.

(4) The undertaker must consult the chief officer of police and the traffic authority in whose area the road is situated before complying with the provisions of paragraph (5).

(5) The undertaker must not exercise the powers conferred by paragraph (2) unless it has—

(a)given not less than—

(i)12 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect permanently; or

(ii)4 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect temporarily,

to the chief officer of police and to the traffic authority in whose area the road is situated; and

(b)advertised its intention in such manner as the traffic authority may specify in writing within 28 days of the receipt of notice of the undertaker’s intention in the case of sub-paragraph (a)(i), or within 7 days of the receipt of notice of the undertaker’s intention in the case of sub-paragraph (a)(ii).

(6) Any prohibition, restriction or other provision made by the undertaker under paragraph (2)—

(a)has effect as if duly made by, as the case may be—

(i)the traffic authority in whose area the road is situated, as a traffic regulation order under the 1984 Act; or

(ii)the local authority in whose area the road is situated, as an order under section 32(49) (power of local authorities to provide parking spaces) of the 1984 Act,

and the instrument by which it is effected may specify savings and exemptions to which the prohibition, restriction or other provision is subject; and

(b)is deemed to be a traffic order for the purposes of Schedule 7 (road traffic contraventions subject to civil enforcement) to the Traffic Management Act 2004(50).

(7) Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the undertaker from time to time by subsequent exercise of the powers of paragraph (2) within a period of 24 months from the opening of the authorised development.

(8) Before exercising the powers conferred by paragraph (2), the undertaker must consult such persons as it considers necessary and appropriate and must take into consideration any representations made to it by any such person.

(9) Expressions used in this article and in the 1984 Act shall have the same meaning in this article as in that Act.

(10) The powers conferred on the undertaker by this article with respect to any road have effect subject to any agreement entered into by the undertaker with any person with an interest in (or who undertakes activities in relation to) premises served by the road.

(11) If the traffic authority fails to notify the undertaker of its decision within 28 days of receiving an application for consent under paragraph (2) the traffic authority is deemed to have granted consent.

Commencement Information

I17Art. 18 in force at 2.6.2022, see art. 1

PART 4E+WSUPPLEMENTAL POWERS

Discharge of waterE+W

19.—(1) Subject to paragraphs (3) and (4), the undertaker may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out or maintenance of the authorised development and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain.

(2) Any dispute arising from the making of connections to or the use of a public sewer or drain by the undertaker under paragraph (1) is to be determined as if it were a dispute under section 106 (right to communicate with public sewers) of the Water Industry Act 1991(51).

(3) The undertaker must not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld.

(4) The undertaker must not make any opening into any public sewer or drain except—

(a)in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and

(b)where that person has been given the opportunity to supervise the making of the opening.

(5) The undertaker must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain pursuant to this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.

(6) Subject to paragraph 1(a) of article 3 (disapplication of legislative provisions) nothing in this article overrides the requirement for an environmental permit under regulation 12(1)(b) (requirement for environmental permit) of the Environmental Permitting (England and Wales) Regulations 2016(52).

(7) If a person who receives an application for consent under paragraph (3) or approval under paragraph (4)(a) fails to notify the undertaker of a decision within 28 days of receiving an application that person will be deemed to have granted consent or given approval, as the case may be.

(8) In this article—

(a)public sewer or drain” means a sewer or drain which belongs to the Homes and Communities Agency (known as Homes England), the Environment Agency, an internal drainage board, a joint planning board, a local authority, a sewerage undertaker or an urban development corporation; and

(b)other expressions, excluding watercourse, used both in this article and in the Water Resources Act 1991(53) have the same meaning as in that Act.

Commencement Information

I18Art. 19 in force at 2.6.2022, see art. 1

Protective work to buildingsE+W

20.—(1) Subject to the following provisions of this article, the undertaker may at its own expense carry out such protective works to any building which may be affected by the authorised development as the undertaker considers necessary or expedient.

(2) Protective works may be carried out—

(a)at any time before or during the carrying out in the vicinity of the building of any part of the authorised development; or

(b)after the completion of that part of the authorised development in the vicinity of the building at any time up to the end of the period of 5 years beginning with the day on which that part of the authorised development is first opened for use.

(3) For the purpose of determining how the functions under this article are to be exercised the undertaker may enter and survey any building falling within paragraph (1) and any land within its curtilage.

(4) For the purpose of carrying out protective works under this article to a building the undertaker may (subject to paragraphs (5) and (6))—

(a)enter the building and any land within its curtilage; and

(b)where the works cannot be carried out reasonably conveniently without entering land which is adjacent to the building but outside its curtilage, enter the adjacent land (but not any building erected on it).

(5) Before exercising—

(a)a right under paragraph (1) to carry out protective works to a building;

(b)a right under paragraph (3) to enter a building and land within its curtilage;

(c)a right under paragraph (4)(a) to enter a building and land within its curtilage; or

(d)a right under paragraph (4)(b) to enter land,

the undertaker must, except in the case of emergency, serve on the owners and occupiers of the building or land not less than 14 days’ notice of its intention to exercise that right and, in a case falling within sub-paragraph (a) or (c), specifying the protective works proposed to be carried out.

(6) Where a notice is served under paragraph (5)(a), (c) or (d), the owner or occupier of the building or land concerned may, by serving a counter-notice within the period of 10 days beginning with the day on which the notice was served, require the question whether it is necessary or expedient to carry out the protective works or to enter the building or land to be referred to arbitration under article 48 (arbitration).

(7) The undertaker must compensate the owners and occupiers of any building or land in relation to which rights under this article have been exercised for any loss or damage arising to them by reason of the exercise of those rights.

(8) Where—

(a)protective works are carried out under this article to a building; and

(b)within the period of 5 years beginning with the day on which the part of the authorised development carried out in the vicinity of the building is first opened for use it appears that the protective works are inadequate to protect the building against damage caused by the carrying out or use of that part of the authorised development,

the undertaker must compensate the owners and occupiers of the building for any loss or damage sustained by them.

(9) Nothing in this article relieves the undertaker from any liability to pay compensation under section 152(54) (compensation in case where no right to claim in nuisance) of the 2008 Act.

(10) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the entry onto land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (compulsory acquisition provisions) of the 2008 Act.

(11) Any compensation payable under paragraph (7) or (8) is to be determined, in case of dispute, as if it were a dispute under Part 1 (determination of questions of disputed compensation) of the 1961 Act.

(12) In this article “protective works” in relation to a building means—

(a)underpinning, strengthening and any other works the purpose of which is to prevent damage which may be caused to the building by the carrying out, maintenance or use of the authorised development; and

(b)any works the purpose of which is to remedy any damage which has been caused to the building by the carrying out, maintenance or use of the authorised development.

Commencement Information

I19Art. 20 in force at 2.6.2022, see art. 1

Authority to survey and investigate the landE+W

21.—(1) The undertaker may for the purposes of this Order enter on any land shown within the Order limits or which may be affected by the authorised development and—

(a)survey or investigate the land;

(b)without limitation on the scope of sub-paragraph (a), make trial holes in such positions on the land as the undertaker thinks fit to investigate the nature of the surface layer and subsoil and remove soil samples;

(c)without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land; and

(d)place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes.

(2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least 14 days’ notice has been served on every owner and occupier of the land.

(3) Any person entering land under this article on behalf of the undertaker—

(a)must, if so required, before or after entering the land, produce written evidence of their authority to do so; and

(b)may take onto the land such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes.

(4) No trial holes are to be made under this article—

(a)in land located within a highway boundary without the consent of the highway authority; or

(b)in a private street without the consent of the street authority,

but such consent must not be unreasonably withheld.

(5) The undertaker must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the powers conferred by this article, such compensation to be determined, in case of dispute, as if it were a dispute under Part 1 (determination of questions of disputed compensation) of the 1961 Act.

(6) If either a highway authority or street authority which receives an application for consent fails to notify the undertaker of its decision within 28 days of receiving the application for consent—

(a)under paragraph (4)(a) in the case of a highway authority; or

(b)under paragraph (4)(b) in the case of a street authority,

that authority will be deemed to have granted consent.

Commencement Information

I20Art. 21 in force at 2.6.2022, see art. 1

PART 5E+WPOWERS OF ACQUISITION AND POSSESSION OF LAND

Compulsory acquisition of landE+W

22.—(1) The undertaker may acquire compulsorily so much of the Order land as is required for the authorised development, or to facilitate it, or is incidental to it or is required as replacement land.

(2) This article is subject to paragraph (2) of article 25 (compulsory acquisition of rights and restrictive covenants) and article 32 (temporary use of land for carrying out the authorised development).

Commencement Information

I21Art. 22 in force at 2.6.2022, see art. 1

Compulsory acquisition of land – incorporation of the mineral codeE+W

23.  Part 2 of Schedule 2 (minerals) to the Acquisition of Land Act 1981(55) is incorporated in this Order subject to the modification that for “the acquiring authority” substitute “the undertaker”.

Commencement Information

I22Art. 23 in force at 2.6.2022, see art. 1

Time limit for exercise of authority to acquire land compulsorilyE+W

24.—(1) After the end of the period of 5 years beginning on the day on which this Order is made—

(a)no notice to treat is to be served under Part 1 of the 1965 Act as modified by article 28 (modification of Part 1 of the 1965 Act); and

(b)no declaration is to be executed under section 4 (execution of declaration) of the 1981 Act as applied by article 29 (application of the 1981 Act).

(2) The authority conferred by article 32 (temporary use of land for carrying out the authorised development) to take temporary possession of land ceases at the end of the period referred to in paragraph (1), except that nothing in this paragraph prevents the undertaker remaining in possession of land after the end of that period (subject to article 32(3)), if the land was entered and possession was taken before the end of that period.

Commencement Information

I23Art. 24 in force at 2.6.2022, see art. 1

Compulsory acquisition of rights and restrictive covenantsE+W

25.—(1) Subject to paragraphs (2) to (5), the undertaker may acquire such rights over the Order land, or impose restrictive covenants affecting the Order land, including rights and restrictive covenants for the benefit of a statutory undertaker or any other person, as may be required for any purpose for which that land may be acquired under article 22 (compulsory acquisition of land) by creating them as well as acquiring rights already in existence.

(2) In the case of the Order land specified in column (1) of Schedule 5 (land in which only new rights etc. may be acquired) the undertaker’s powers of compulsory acquisition are limited to the acquisition of such wayleaves, easements, new rights in the land or the imposition of restrictive covenants, as may be required for the purpose specified in relation to that land in column (2) of that Schedule and relating to that part of the authorised development specified in column (3) of that Schedule.

(3) The power to impose restrictive covenants under paragraph (1) is exercisable only in respect of plots specified in column (1) of Schedule 5.

(4) The power conferred by paragraph (1) to acquire the rights and to impose the restrictive covenants described in Schedule 5 for the benefit of statutory undertakers or for the benefit of any other person—

(a)does not preclude the acquisition of such other rights and the imposition of such other restrictive covenants in respect of the same land in accordance with Schedule 5 as may be required for the benefit of any other statutory undertaker or any other person; and

(b)must not be exercised by the undertaker in a way that precludes the acquisition of such other rights and the imposition of such other restrictive covenants in respect of the same land in accordance with Schedule 5 as are required for the benefit of any other statutory undertaker or any other person.

(5) Subject to Schedule 2A (counter-notice requiring purchase of land not in notice to treat) of the 1965 Act, as substituted by paragraph 5(8) of Schedule 6 (modification of compensation and compulsory purchase enactments for creation of new rights), where the undertaker acquires a right over land or the benefit of a restrictive covenant affecting land under paragraph (1) or (2), the undertaker is not required to acquire a greater interest in that land.

(6) Schedule 6 has effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article of a right over land by the creation of a new right or the imposition of a restrictive covenant.

Commencement Information

I24Art. 25 in force at 2.6.2022, see art. 1

Extinguishment of public rights of wayE+W

26.—(1) The public rights of way identified in column (1) of Parts 1 and 2 of Schedule 4 (permanent stopping up of highways and private means of access and provision of new highways and private means of access) and shown on the streets, rights of way and access plans are to be extinguished on the date of the expiry of the notice given under paragraph (2).

(2) Prior to the extinguishment of each of the public rights of way identified in column (1) of Parts 1 and 2 of Schedule 4 and shown on the streets, rights of way and access plans, the undertaker must erect a site notice at each end of the rights of way to be extinguished no less than 28 days prior to the extinguishment of that right of way.

(3) The notice to be erected under paragraph (2) must include—

(a)details of the public rights of way to be extinguished;

(b)the date on which the extinguishment will take effect;

(c)details of any public rights of way being provided in substitution; and

(d)details of the places where a copy of this Order and the documents listed in Schedule 11 (documents to be certified) may be inspected.

Commencement Information

I25Art. 26 in force at 2.6.2022, see art. 1

Private rights over landE+W

27.—(1) Subject to the provisions of this article, all private rights over land subject to compulsory acquisition under this Order are extinguished—

(a)from the date of acquisition of the land by the undertaker, whether compulsorily or by agreement; or

(b)on the date of entry on the land by the undertaker under section 11(1)(56) (power of entry) of the 1965 Act,

whichever is the earlier.

(2) Subject to the provisions of this article, all private rights over land subject to the compulsory acquisition of the rights or the imposition of restrictive covenants under this Order are extinguished in so far as their continuance would be inconsistent with the exercise of the right or the burden of the restrictive covenant—

(a)as from the date of the acquisition of the right or the benefit of the restrictive covenant by the undertaker, whether compulsorily or by agreement; or

(b)on the date of entry on the land by the undertaker under section 11(1) of the 1965 Act,

whichever is the earlier.

(3) Subject to the provisions of this article, all private rights over land owned by the undertaker that are within the Order limits are extinguished on commencement of any activity authorised by this Order which interferes with or breaches those rights.

(4) Subject to the provisions of this article, all private rights over land of which the undertaker takes temporary possession under this Order are suspended and unenforceable for as long as the undertaker remains in lawful possession of the land.

(5) Any person who suffers loss by the extinguishment or suspension of any private right under this article is entitled to compensation in accordance with the terms of section 152(57) (compensation in case where no right to claim in nuisance) of the 2008 Act to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.

(6) This article does not apply in relation to any right to which section 138(58) (extinguishment of rights, and removal of apparatus, of statutory undertakers etc.) of the 2008 Act or article 35 (statutory undertakers) applies.

(7) Paragraphs (1) to (4) have effect subject to—

(a)any notice given by the undertaker before—

(i)the completion of the acquisition of the land or the acquisition of the right or the imposition of the restrictive covenant over or affecting the land;

(ii)the undertaker’s appropriation of it;

(iii)the undertaker’s entry onto it; or

(iv)the undertaker’s taking temporary possession of it,

that any or all of those paragraphs do not apply to any right specified in the notice; and

(b)any agreement made at any time between the undertaker and the person in or to whom the right in question is vested or belongs.

(8) If any such agreement as is referred to in paragraph (7)(b)—

(a)is made with a person in or to whom the right is vested or belongs; and

(b)is expressed to have effect also for the benefit of those deriving title from or under that person,

it is effective in respect of the persons so deriving title, whether the title was derived before or after the making of the agreement.

(9) References in this article to private rights over land include any trust, incident, easement, liberty, privilege, right or advantage annexed to land and adversely affecting other land, including any natural right to support and include restrictions as to the user of land arising by virtue of a contract, agreement or undertaking having that effect.

Commencement Information

I26Art. 27 in force at 2.6.2022, see art. 1

Modification of Part 1 of the 1965 ActE+W

28.—(1) Part 1 of the 1965 Act, as applied to this Order by section 125(59) (application of compulsory acquisition provisions) of the 2008 Act is modified as follows.

(2) In section 4A(1)(60) (extension of time limit during challenge) for “section 23 of the Acquisition of Land Act 1981 (application to the High Court in respect of compulsory purchase order), the three year period mentioned in section 4” substitute “section 118(61) (legal challenges relating to applications for orders granting development consent) of the Planning Act 2008, the five year period mentioned in article 24 (time limit for exercise of authority to acquire land compulsorily) of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022.

(3) In section 11A(62) (powers of entry: further notice of entry)—

(a)in subsection (1)(a), after “land” insert “under that provision”;

(b)in subsection (2), after “land” insert “under that provision”.

(4) In section 22(2) (expiry of time limit for exercise of compulsory purchase power not to affect acquisition of interests omitted from purchase), for “section 4 of this Act” substitute “article 24 (time limit for exercise of authority to acquire land compulsorily) of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022”.

(5) In Schedule 2A (counter-notice requiring purchase of land not in notice to treat)—

(a)for paragraphs 1(2) and 14(2) substitute—

(2) But see article 31(3) (acquisition of subsoil or airspace only) of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022, which excludes the acquisition of subsoil or airspace only from this Schedule.; and

(b)after paragraph 29, insert—

PART 4E+WINTERPRETATION

30.  In this Schedule, references to entering on and taking possession of land do not include doing so under articles 20 (protective work to buildings), 32 (temporary use of land for carrying out the authorised development) or 33 (temporary use of land for maintaining the authorised development) of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022..

Commencement Information

I27Art. 28 in force at 2.6.2022, see art. 1

Application of the 1981 ActE+W

29.—(1) The 1981 Act applies as if this Order were a compulsory purchase order.

(2) The 1981 Act, as so applied by paragraph (1), has effect with the following modifications.

(3) In section 1 (application of Act), for subsection (2) substitute—

(2) This section applies to any Minister, any local or other public authority or any other body or person authorised to acquire land by means of a compulsory purchase order..

(4) In section 5(63) (earliest date for execution of declaration), in subsection (2), omit the words from “, and this subsection” to the end.

(5) Omit section 5A(64) (time limit for general vesting declaration).

(6) In section 5B(1)(65) (extension of time limit during challenge) for “section 23 of the Acquisition of Land Act 1981 (application to High Court in respect of compulsory purchase order), the three year period mentioned in section 5A” substitute “section 118 (legal challenges relating to applications for orders granting development consent) of the Planning Act 2008 the five year period mentioned in article 24 (time limit for exercise of authority to acquire land compulsorily) of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022”.

(7) In section 6(66) (notices after execution of declaration) in subsection (1)(b) for “section 15 of, or paragraph 6 of Schedule 1 to, the Acquisition of Land Act 1981” substitute “section 134(67) (notice of authorisation of compulsory acquisition) of the Planning Act 2008”.

(8) In section 7(68) (constructive notice to treat) in subsection (1)(a), omit “(as modified by section 4 of the Acquisition of Land Act 1981)”.

(9) In Schedule A1(69) (counter-notice requiring purchase of land not in general vesting declaration), omit paragraph 1(2).

(10) References to the 1965 Act in the 1981 Act are to be construed as references to the 1965 Act as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and as modified by article 28 (modification of Part 1 of the 1965 Act)) to the compulsory acquisition of land under this Order.

Commencement Information

I28Art. 29 in force at 2.6.2022, see art. 1

Acquisition of subsoil or airspace onlyE+W

30.—(1) The undertaker may acquire compulsorily so much of, or such rights in, the subsoil of or of the airspace over the land referred to in paragraph (1) of article 22 (compulsory acquisition of land) as may be required for any purpose for which that land may be acquired under that provision instead of acquiring the whole of the land.

(2) Where the undertaker acquires any part of, or rights in, the subsoil of or the airspace over land referred to in paragraph (1), the undertaker is not required to acquire an interest in any other part of the land.

(3) The following do not apply in connection with the exercise of the power under paragraph (1) in relation to subsoil or airspace only—

(a)Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as modified by article 28 (modification of Part 1 of the 1965 Act));

(b)Schedule A1 (counter-notice requiring purchase of land not in general vesting declaration) to the 1981 Act; and

(c)section 153(4A)(70) (blighted land: proposed acquisition of part interest; material detriment test) of the 1990 Act.

(4) Paragraphs (2) and (3) are to be disregarded where the undertaker acquires a cellar, vault, arch or other construction forming part of a house, building or manufactory or airspace above a house, building or manufactory.

Commencement Information

I29Art. 30 in force at 2.6.2022, see art. 1

Rights under or over streetsE+W

31.—(1) The undertaker may enter on and appropriate so much of the subsoil of, or airspace over, any street within the Order limits as may be required for the purposes of the authorised development and may use the subsoil or airspace for those purposes or any other purpose ancillary to the authorised development.

(2) Subject to paragraph (3), the undertaker may exercise any power conferred by paragraph (1) in relation to a street without being required to acquire any part of the street or any easement or right in the street.

(3) Paragraph (2) does not apply in relation to—

(a)any subway or underground building; or

(b)any cellar, vault, arch or other construction in, on or under a street which forms part of a building fronting onto the street.

(4) Subject to paragraph (5), any person who is an owner or occupier of land in respect of which the power of appropriation conferred by paragraph (1) is exercised without the undertaker acquiring any part of that person’s interest in the land, and who suffers loss as a result, will be entitled to compensation to be determined, in case of dispute, as if it were a dispute under Part 1 of the 1961 Act.

(5) Compensation is not payable under paragraph (4) to any person who is a statutory undertaker to whom section 85 (sharing cost of necessary measures) of the 1991 Act applies in respect of measures of which the allowable costs are to be borne in accordance with that section.

Commencement Information

I30Art. 31 in force at 2.6.2022, see art. 1

Temporary use of land for carrying out the authorised developmentE+W

32.—(1) The undertaker may, in connection with the carrying out of the authorised development, but subject to article 24(2) (time limit for the exercise of authority to acquire land compulsorily)—

(a)enter on and take temporary possession of—

(i)the land specified in column (1) of Schedule 7 (land of which temporary possession may be taken) for the purpose specified in relation to that land in column (2) of that Schedule relating to the part of the authorised development specified in column (3) of that Schedule; and

(ii)any other Order land in respect of which no notice of entry has been served under section 11 (powers of entry) of the 1965 Act (other than in connection with the acquisition of rights only) and no declaration has been made under section 4 (execution of declaration) of the 1981 Act;

(b)remove any buildings and vegetation from that land;

(c)construct temporary works (including the provision of means of access) and buildings on that land; and

(d)construct any works on that land as are mentioned in Schedule 1 (authorised development).

(2) Not less than 14 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land and explain the purpose for which entry is taken in respect of land specified under paragraph (1)(a)(ii).

(3) Notwithstanding article 24(2), the undertaker may not, without the agreement of the owners of the land, remain in possession of any land under this article—

(a)in the case of land specified in paragraph (1)(a)(i), after the end of the period of one year beginning with the date of completion of the part of the authorised development specified in relation to that land in column (3) of Schedule 7; or

(b)in the case of any land referred to in paragraph (1)(a)(ii), after the end of the period of one year beginning with the date of completion of the work for which temporary possession of the land was taken unless the undertaker has, by the end of that period, served a notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act in relation to that land.

(4) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but the undertaker is not required to—

(a)replace a building removed under this article;

(b)restore the land on which any permanent works have been constructed under paragraph (1)(d);

(c)remove any ground strengthening works which have been placed on the land to facilitate construction of the authorised development; or

(d)remove any measures installed over or around statutory undertakers’ apparatus to protect that apparatus from the authorised development.

(5) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.

(6) Any dispute as to a person’s entitlement to compensation under paragraph (5), or as to the amount of the compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.

(7) Any dispute as to the satisfactory removal of temporary works and restoration of land under paragraph (4) does not prevent the undertaker giving up possession of the land.

(8) Nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (5).

(9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.

(10) Section 13(71) (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.

Commencement Information

I31Art. 32 in force at 2.6.2022, see art. 1

Temporary use of land for maintaining the authorised developmentE+W

33.—(1) Subject to paragraph (2), at any time during the maintenance period relating to any part of the authorised development, the undertaker may—

(a)enter upon and take temporary possession of any land within the Order limits if such possession is reasonably required for the purpose of maintaining the authorised development; and

(b)construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.

(2) Paragraph (1) does not authorise the undertaker to take temporary possession of—

(a)any house or garden belonging to a house; or

(b)any building (other than a house) if it is for the time being occupied.

(3) Not less than 28 days before entering upon and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land and explain the purpose for which entry is taken.

(4) The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.

(5) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.

(6) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.

(7) Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of the compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.

(8) Nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under paragraph (6).

(9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.

(10) Section 13 (refusal to give possession to the acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.

(11) In this article “the maintenance period”, in relation to any part of the authorised development means the period of 5 years beginning with the date on which that part of the authorised development is first opened for use, save that in relation to the replacement land identified in Part 4 of Schedule 10 (replacement land), “the maintenance period” means such period for the maintenance and management of that land as may be specified in a scheme approved by the Secretary of State under requirement 7 of Schedule 2 (design, layout and implementation of Replacement Land).

Commencement Information

I32Art. 33 in force at 2.6.2022, see art. 1

Crown RightsE+W

34.—(1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and, in particular, nothing in this Order authorises the undertaker to take, use, enter on or in any other manner interfere with any land or rights of any description including any part of any river, channel or creek—

(a)belonging [F6to] Her Majesty in right of the Crown and forming part of the Crown Estate without the consent in writing of the Crown Estate Commissioners;

(b)belonging to Her Majesty in right of the Crown and not forming part of the Crown Estate without the consent in writing of the government department having the management of that land; or

(c)belonging to a government department or held in trust for Her Majesty for the purposes of a government department without the consent in writing of that government department.

(2) Paragraph (1) does not apply to the exercise [F7of] any right under this Order for the [F8compulsory] acquisition of an interest in any Crown land (as defined in section 227 of the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown.

(3) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions, and is deemed to have been given in writing where it is sent electronically.

Statutory undertakersE+W

35.—(1) Subject to the provisions of Schedule 9 (protective provisions), article 25 (compulsory acquisition of rights and restrictive covenants) and paragraph (2), the undertaker may—

(a)acquire compulsorily, or acquire new rights or impose restrictive covenants over, any Order land belonging to statutory undertakers; and

(b)extinguish the rights of, and remove or reposition apparatus belonging to, statutory undertakers over or within the Order land.

(2) Paragraph (1)(b) has no effect in relation to apparatus in respect of which the following provisions apply—

(a)Part 3 (street works in England and Wales) of the 1991 Act; and

(b)article 36 (apparatus and rights of statutory undertakers in stopped up streets).

Commencement Information

I34Art. 35 in force at 2.6.2022, see art. 1

Apparatus and rights of statutory undertakers in stopped up streetsE+W

36.—(1) Where a street is stopped up under article 15 (permanent stopping up and restriction of use of streets and private means of access), any statutory utility whose apparatus is under, in, on, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this article, as if this Order had not been made.

(2) Where a street is stopped up under article 15 any statutory utility whose apparatus is under, in, on, over, along or across the street may, and if reasonably requested to do so by the undertaker must—

(a)remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the [F9statutory] utility may reasonably determine and have power to place it; or

(b)provide other apparatus in substitution for the existing apparatus and place it in such position as described in sub-paragraph (a).

(3) Subject to the following provisions of this article, the undertaker must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—

(a)the execution of the relocation works required in consequence of the stopping up of the street; and

(b)the doing of any other work or thing rendered necessary by the execution of the relocation works.

(4) If in the course of the execution of relocation works under paragraph (2)—

(a)apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which, apart from this paragraph, would be payable to the statutory utility by virtue of paragraph (3) is to be reduced by the amount of that excess.

(5) For the purposes of paragraph (4)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(6) An amount which, apart from this paragraph, would be payable to a statutory utility in respect of works by virtue of paragraph (3) (and having regard, where relevant, to paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

(7) Paragraphs (3) to (6) do not apply where the authorised development constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 of the 1991 Act, but instead—

(a)the allowable costs of the relocation works are to be determined in accordance with section 85 (sharing of cost of necessary measures) of that Act and any regulations for the time being having effect under that section; and

(b)the allowable costs are to be borne by the undertaker and the statutory utility in such proportions as may be prescribed by any such regulations.

(8) In this article—

relocation works” means work executed, or apparatus provided, under paragraph (2); and

statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in section 151(1) of the Communications Act 2003(72).

Textual Amendments

Commencement Information

I35Art. 36 in force at 2.6.2022, see art. 1

Recovery of costs of new connectionsE+W

37.—(1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 35 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

(2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 35, any person who is—

(a)the owner or occupier of premises the drains of which communicated with that sewer; or

(b)the owner of a private sewer which communicated with that sewer,

is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

(3) This article does not have effect in relation to apparatus to which article 36 (apparatus and rights of statutory undertakers in stopped up streets) or Part 3 of the 1991 Act applies.

(4) In this paragraph—

public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003; and

public utility undertaker” means a gas, water, electricity or sewerage undertaker.

Commencement Information

I36Art. 37 in force at 2.6.2022, see art. 1

Special category landE+W

38.—(1) On the exercise by the undertaker of the relevant Order powers, the special category land identified in Part 1 of Schedule 10 is not to vest in the undertaker, and the undertaker may not acquire any rights over the special category (rights) land identified in Part 2 of Schedule 10, until the undertaker has acquired the replacement land identified in Part 4 of Schedule 10 and the Secretary of State has approved the details required by requirement 7 (design, layout and implementation of Replacement Land) of Schedule 2 (requirements).

(2) On the requirements of paragraph (1) being satisfied, the special category land identified in Part 1 of Schedule 10 is to vest in the undertaker and be discharged from all rights, trusts and incidents to which it was previously subject.

(3) On the requirements of paragraph (1) being satisfied, the undertaker may acquire the rights over the special category (rights) land identified in Part 2 of Schedule 10 and the said land is to be discharged from all rights, trusts and incidents to which it was previously subject so far as their continuance would be inconsistent with the said rights to be acquired.

(4) On the requirements of paragraph (1) being satisfied, the land numbered 2/13 (being common land of which temporary possession may be taken under this Order) in the book of reference and on the land plans will be discharged from all rights, trusts and incidents to which it was previously subject.

(5) On the date on which the land comprising plots numbered in the book of reference and on the land plans 11/16, 11/17, 11/17b, 11/17c (in so far as not required for the purpose of paragraph (7)) 11/17d, 11/17e, 11/17f, 11/17g, 11/17h, 11/17i and 11/17j is laid out and provided in accordance with the requirements at paragraph (1), the said land is to vest in the persons in whom the special category land identified in Part 1 and Part 2 of Schedule 10 (save for the land comprised in plots numbered 11/3a, 11/4a, 11/8 and 11/8a in the book of reference and on the land plans) was vested immediately before it was vested in the undertaker and is to be subject to the same rights, trusts and incidents as attached to that land.

(6) On the date on which the land comprising [F10plots] numbered 27/1 and 11/17a in the book of reference and on the land plans is laid out and provided in accordance with the scheme requirements at paragraph (1), the said land is to vest in the persons in whom the land comprised in plots numbered 11/3a and 11/4a in the book of reference and on the land plans was vested immediately before it was vested in the undertaker and is to be subject to the same rights, trusts and incidents as attached to that land.

(7) On the date on which the land comprising so much of plot numbered 11/17c in the book of reference as is required for the purpose of providing replacement land to the persons in whom those parts of the special category land comprised in plots numbered 11/8, 11/8a and 28/2 in the book of reference and on the land plans was vested immediately before it was vested in the undertaker is laid out and provided in accordance with the scheme requirements at paragraph (1), the said land is to vest in the persons described in this paragraph and is to be subject to the same rights, trusts and incidents as attached to that land.

(8) In this article “the relevant Order powers” means the powers exercisable over the special category land or the special category (rights) land by the undertaker under article 22 (compulsory acquisition of land) or article 25 (compulsory acquisition of rights and restrictive covenants).

Textual Amendments

Commencement Information

I37Art. 38 in force at 2.6.2022, see art. 1

PART 6E+WOPERATIONS

Felling or lopping of trees and removal of hedgerowsE+W

39.—(1) The undertaker may fell or lop any tree or shrub within or overhanging land within the Order limits, or cut back its roots, if it reasonably believes it to be necessary to do so to prevent the tree or shrub—

(a)from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or

(b)from constituting a danger to persons using the authorised development.

(2) In carrying out any activity authorised by paragraph (1), the undertaker must do no unnecessary damage to any tree or shrub and must pay compensation to any person for any loss or damage arising from such activity.

(3) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.

(4) The undertaker may, for the purposes of carrying out the authorised development but subject to paragraph (2), remove any hedgerow within the Order limits that is required to be removed.

(5) In this article “hedgerow” includes a hedgerow to which the Hedgerow Regulations 1997(73) apply and includes important hedgerows.

Commencement Information

I38Art. 39 in force at 2.6.2022, see art. 1

Trees subject to tree preservation ordersE+W

40.—(1) The undertaker may fell or lop any tree described in Schedule 8 (trees subject to tree preservation orders) or cut back its roots or undertake such other works described in column (2) of that Schedule relating to the relevant part of the authorised development described in column (3) of that Schedule, if it reasonably believes it to be necessary in order to do so to prevent the tree or shrub—

(a)from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or

(b)from constituting a danger to persons using the authorised development.

(2) In carrying out any activity authorised by paragraph (1)—

(a)the undertaker must do no unnecessary damage to any tree or shrub and must pay compensation to any person for any loss or damage arising from such activity; and

(b)the duty contained in section 206(1) (replacement of trees) of the 1990 Act is not to apply.

(3) The authority given by paragraph (1) constitutes a deemed consent under the relevant tree preservation order.

(4) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, shall be determined as if it were a dispute under Part 1 of the 1961 Act.

Commencement Information

I39Art. 40 in force at 2.6.2022, see art. 1

PART 7E+WMISCELLANEOUS AND GENERAL

Application of landlord and tenant lawE+W

41.—(1) This article applies to—

(a)any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same; and

(b)any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it,

so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person’s use.

(2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.

(3) No such enactment or rule of law applies in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—

(a)exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;

(b)confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or

(c)restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.

Commencement Information

I40Art. 41 in force at 2.6.2022, see art. 1

Operational land for purposes of the 1990 ActE+W

42.  Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3) (cases in which land is to be treated as operational land for the purposes of that Act) of the 1990 Act.

Commencement Information

I41Art. 42 in force at 2.6.2022, see art. 1

Defence to proceedings in respect of statutory nuisanceE+W

43.—(1) Where proceedings are brought under section 82(1) (summary proceedings by person aggrieved by statutory nuisance) of the Environmental Protection Act 1990(74) in relation to a nuisance falling within paragraph (g) of section 79(1) (noise emitted from premises so as to be prejudicial to health or a nuisance) of that Act no order is to be made, and no fine may be imposed, under section 82(2)(75) of that Act if—

(a)the defendant shows that the nuisance—

(i)relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction site), or a consent given under section 61 (prior consent for work on construction site) of the Control of Pollution Act 1974(76); or

(ii)is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or

(b)the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot reasonably be avoided.

(2) Section 61(9)(77) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.

Commencement Information

I42Art. 43 in force at 2.6.2022, see art. 1

Protection of interestsE+W

44.  Schedule 9 (protective provisions) has effect.

Commencement Information

I43Art. 44 in force at 2.6.2022, see art. 1

Certification of documents, etc.E+W

45.—(1) As soon as practicable after the making of this Order, the undertaker must submit copies of each of the plans and documents set out in Schedule 11 (documents to be certified) to the Secretary of State for certification that they are true copies of those plans and documents.

(2) Where any plan or document set out in Schedule 11 requires to be amended to reflect the terms of the Secretary of State’s decision to make the Order, that plan or document in the form amended to the Secretary of State’s satisfaction is the version of the plan or document required to be certified under paragraph (1).

(3) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Commencement Information

I44Art. 45 in force at 2.6.2022, see art. 1

Service of noticesE+W

46.—(1) A notice or other document required or authorised to be served for the purposes of this Order may be served—

(a)by post;

(b)by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or

(c)with the consent of the recipient and subject to paragraphs (5) to (8) by electronic transmission.

(2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.

(3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978(78) as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—

(a)in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and

(b)in any other case, the last known address of that person at the time of service.

(4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—

(a)addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and

(b)either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.

(5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement will be taken to be fulfilled only where—

(a)the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;

(b)the notice or document is capable of being accessed by the recipient;

(c)the notice or document is legible in all material respects; and

(d)the notice or document is in a form sufficiently permanent to be used for subsequent reference.

(6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender will provide such a copy as soon as reasonably practicable.

(7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).

(8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—

(a)that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and

(b)such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.

(9) This article does not exclude the employment of any method of service not expressly provided for by it.

(10) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.

Commencement Information

I45Art. 46 in force at 2.6.2022, see art. 1

Application of local legislationE+W

47.—(1) The following local enactments and local byelaws, and any byelaws or other provisions made under any of those enactments or byelaws do not apply where inconsistent with a provision or a power conferred by this Order—

(a)Cobham, Leatherhead and Godalming Bridges Act 1782(79) sections 1 and 6;

(b)Cobham Gas Act 1899(80) section 29;

(c)Electric Lighting Orders Confirmation (No.1) Act 1908(81) sections 4 and 5;

(d)Borough of Guildford Byelaws with respect to Loading of Vehicles and Deposit of Mud on Highways 1968, byelaws 2 and 3; and

(e)Surrey Act 1985(82) sections 5(1) and 5(2).

(2) For the purpose of paragraph (1) a provision is inconsistent with the exercise of a power conferred by this Order to the extent that—

(a)it would make it an offence to take action, or not to take action, in pursuance of the power;

(b)action taken in pursuance of the power would cause the provision to apply so as to enable a person to require the taking of remedial or other action or so as to enable remedial or other action to be taken; or

(c)action taken in pursuance of a power or duty under the provision would or might interfere with the exercise of any work authorised by this Order.

(3) Where any person notifies the undertaker in writing that anything done or proposed to be done by the undertaker or by virtue of this Order would amount to a contravention of a statutory provision of local application, the undertaker must as soon as reasonably practicable, and in any event within 14 days of receipt of the notice, respond in writing setting out—

(a)whether the undertaker agrees that the action taken or proposed does or would contravene the provision of local application;

(b)if the undertaker does agree, the grounds (if any) on which the undertaker believes that the provision is excluded by this article; and

(c)the extent of that exclusion.

Commencement Information

I46Art. 47 in force at 2.6.2022, see art. 1

ArbitrationE+W

48.  Except where otherwise expressly provided for in this Order and unless otherwise agreed between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the Lands Chamber of the Upper Tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.

Commencement Information

I47Art. 48 in force at 2.6.2022, see art. 1

Signed by authority of the Secretary of State for Transport

Natasha Kopala

Head of the Transport and Works Act Orders Unit

Department for Transport

Yn ôl i’r brig

Options/Help

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?