The A428 Black Cat to Caxton Gibbet Development Consent Order 2022

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: PART 1

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The A428 Black Cat to Caxton Gibbet Development Consent Order 2022, PART 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART 1E+WREQUIREMENTS

InterpretationE+W

1.  In this Schedule—

archaeological mitigation strategy” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the archaeological mitigation strategy for the purposes of this Order;

biodiversity pre-commencement plan” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the biodiversity pre-commencement plan for the purposes of this Order;

Brook Cottages heritage strategy” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the Brook Cottages heritage strategy for the purposes of this Order;

Brook Cottages soft strip” means the soft strip referred to in the Brook Cottages heritage strategy at section 3;

contaminated land” means land which the undertaker considers would amount to contaminated land within the meaning given in section 78A(2)(a) or (b) of the Environmental Protection Act 1990(1);

DMRB” means the Design Manual for Roads and Bridges, which accommodates all current standards, advice and other documents relating to the design, assessment and operation of trunk roads and motorways, or any equivalent replacement to the DMRB published;

Ecological Clerk of Works” means the individual appointed as such by the undertaker as required by the First Iteration EMP;

First Iteration EMP” means the document of that description listed in Schedule 10 (documents to be certified), being the first iteration of the environmental management plan produced in accordance with the DMRB during the preliminary design stage and certified by the Secretary of State as the First Iteration EMP for the purposes of this Order, and which includes an outline plan for the following—

(a)

Air Quality Management Plan;

(b)

Noise Management Plan;

(c)

Waste Management Plan;

(d)

Biodiversity Management Plan;

(e)

Soil Handling and Management Plan;

(f)

Water Management Plan;

(g)

Energy and Resource Management Plan;

(h)

Materials Management Plan;

(i)

Contaminated Land Management Plan;

(j)

Archaeological Management Plan;

(k)

Construction Compound Management Plan;

(l)

Landscape and Ecology Management Plan;

(m)

Travel Plan; and

(n)

Borrow Pits Management Plan;

European protected species” has the same meaning as in regulations 42 (European protected species of animals) and 46 (European protected species of plants) of the Conservation of Habitats and Species Regulations 2017(2);

flood risk assessment” means the document of that description including the flood risk assessment technical note as listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the flood risk assessment for the purposes of this Order;

outline construction traffic management plan” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the outline construction traffic management plan for the purposes of this Order;

pre-commencement plan” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the pre-commencement plan for the purposes of this Order;

priority habitat” means a type of habitat identified as being of principle importance in England in accordance with section 41 (biodiversity lists and actions (England)) of the Natural Environment and Rural Communities Act 2006(3);

protected species” means species which are subject to protection under the laws of England or which are European protected species;

relevant local authority” means a local authority within the meaning given by section 43(3)(4) of the 2008 Act and in whose area the part of the authorised development in question is located;

relevant stakeholders” in relation to a part of the authorised development means relevant local authorities and relevant statutory environmental bodies;

relevant statutory environmental body” means a statutory body exercising functions relating to environmental matters and which because of those functions is likely to be interested in the detailed design of the part of the authorised development in question;

scheme design approach and design principles” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the scheme design approach and design principles for the purposes of this Order;

Second Iteration EMP” means the second iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the construction phase of the authorised development substantially in accordance with the First Iteration EMP;

Third Iteration EMP” means the third iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the operational and maintenance phase of the authorised development substantially in accordance with the First Iteration EMP.

Commencement Information

I1Sch. 2 para. 1 in force at 8.9.2022, see art. 1

Time limitsE+W

2.  The authorised development must not begin later than the expiration of 5 years from the date on which this Order comes into force.

Commencement Information

I2Sch. 2 para. 2 in force at 8.9.2022, see art. 1

Second Iteration EMPE+W

3.—(1) No part of the authorised development is to commence until the Second Iteration EMP in relation to that part has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority, the Environment Agency, Natural England, and the relevant local highway authority so far as it is relevant to their respective functions.

(2) The authorised development must be constructed in accordance with the Second Iteration EMP.

Commencement Information

I3Sch. 2 para. 3 in force at 8.9.2022, see art. 1

Third Iteration EMPE+W

4.—(1) Following completion of construction of the authorised development the Third Iteration EMP must be submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the relevant local highway authority so far as it is relevant to their respective functions.

(2) The authorised development must be operated and maintained in accordance with the Third Iteration EMP.

Commencement Information

I4Sch. 2 para. 4 in force at 8.9.2022, see art. 1

Details of consultationE+W

5.—(1) With respect to any requirement which requires details to be submitted to the Secretary of State for approval under this Schedule following consultation with another party, the details submitted must be accompanied by a summary report enclosing the written responses received and setting out the consultation undertaken by the undertaker pursuant to that requirement to inform the details submitted and the undertaker’s response to that consultation.

(2) Promptly after submission to the Secretary of State for approval, the undertaker must provide a copy of the summary report referred to under paragraph (1) to the relevant consultees referred to in the requirement in relation to which approval is being sought from the Secretary of State.

Commencement Information

I5Sch. 2 para. 5 in force at 8.9.2022, see art. 1

LandscapingE+W

6.—(1) No part of the authorised development can come into use until a landscaping scheme for that part which sets out details of all proposed hard and soft landscaping works is submitted to the Secretary of State for approval in writing following consultation with Natural England, the relevant planning authority and the relevant local highway authority so far as it is relevant to their respective functions.

(2) The landscaping scheme for each part must be substantially in accordance with the applicable mitigation measures for landscaping set out in the First Iteration EMP and the landscaping principles set out in the environmental masterplan.

(3) The authorised development must be landscaped in accordance with the approved landscaping scheme for that part.

(4) A landscaping scheme referred to in paragraph (1) must contain details of—

(a)location, number, species, mix, size and planting density of any proposed planting;

(b)cultivation, importing of materials and other operations to ensure plant establishment;

(c)proposed finished ground levels;

(d)existing trees to be retained, with measures for their protection during the construction period; and

(e)implementation timetables for all landscaping works.

(5) All landscaping works must be carried out to a reasonable standard in accordance with the relevant recommendations of appropriate British Standards or other recognised codes of good practice.

(6) Any tree or shrub planted as part of a landscaping scheme that, within a period of 5 years after planting, is removed, dies or becomes in the opinion of the relevant planning authority, seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted, unless the Secretary of State, following consultation with the relevant planning authority, gives consent to a variation.

Commencement Information

I6Sch. 2 para. 6 in force at 8.9.2022, see art. 1

FencingE+W

7.  Any permanent and temporary fencing and other means of enclosure that would be adjacent to the new dual carriageway forming part of the authorised development must be constructed and installed in accordance with the undertaker’s Manual of Contract Documents for Highway Works except where any departures from that manual are agreed in writing by the Secretary of State in connection with the authorised development.

Commencement Information

I7Sch. 2 para. 7 in force at 8.9.2022, see art. 1

Contaminated land and groundwaterE+W

8.—(1) In the event that contaminated land, including groundwater, is found at any time when carrying out the authorised development, which was not previously identified in the environmental statement, it must be reported as soon as reasonably practicable to the Secretary of State, the Environment Agency and the relevant planning authority, and the undertaker must complete a risk assessment of the contamination in consultation with the Environment Agency and the relevant planning authority.

(2) Where the undertaker determines that remediation of the contaminated land is necessary, a written scheme and programme for the remedial measures to be taken to render the land fit for its intended purpose must be submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency and the relevant planning authority.

(3) Remediation must be carried out in accordance with the approved scheme.

Commencement Information

I8Sch. 2 para. 8 in force at 8.9.2022, see art. 1

ArchaeologyE+W

9.  The authorised development must be carried out, operated and maintained in accordance with the archaeological mitigation strategy and, as set out in that strategy, the undertaker must submit individual Site Specific Written Schemes of Investigation to the relevant planning authority for approval.

Commencement Information

I9Sch. 2 para. 9 in force at 8.9.2022, see art. 1

Protected speciesE+W

10.—(1) In the event that any protected species which were not previously identified in the environmental statement or nesting birds are found at any time when carrying out the authorised development the undertaker must—

(a)cease the relevant parts of the relevant works and report it immediately to the Ecological Clerk of Works; and

(b)prepare a written scheme for the protection and mitigation measures of such protected species or nesting birds when carrying out the authorised development.

(2) The undertaker must implement the written scheme prepared under paragraph (1) immediately and construction in the area specified in the written scheme must not recommence until any necessary licences are obtained to enable mitigation measures to be implemented.

Commencement Information

I10Sch. 2 para. 10 in force at 8.9.2022, see art. 1

Traffic managementE+W

11.—(1) No part of the authorised development is to commence until a traffic management plan for the construction of that part of the authorised development, substantially in accordance with the outline construction traffic management plan, has been submitted to and approved in writing by the Secretary of State following consultation with the relevant local highway authority.

(2) The authorised development must be constructed in accordance with the approved traffic management plan.

Commencement Information

I11Sch. 2 para. 11 in force at 8.9.2022, see art. 1

Detailed designE+W

12.—(1) The detailed design for the authorised development must accord with—

(a)the preliminary scheme design shown on the works plans, the general arrangement plans and the engineering section drawings;

(b)the principles set out in the environmental masterplan; and

(c)the design principles set out in the scheme design approach and design principles,

unless otherwise agreed in writing by the Secretary of State following consultation with the relevant local authority on matters related to their functions, provided that the Secretary of State is satisfied that any amendments would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

(2) Where amended details are approved by the Secretary of State under paragraph (1), those details are deemed to be substituted for the corresponding plans or sections and the undertaker must make those amended details available in electronic form for inspection by members of the public.

(3) No part of the authorised development is to commence until, for that part, a report has been submitted to, and, following consultation with the relevant local planning authority, approved by the Secretary of State, demonstrating that—

(a)the undertaker has engaged with relevant stakeholders on refinements to detailed design for that part of the authorised development;

(b)the undertaker has had regard to the relevant stakeholders’ comments; and

(c)any refinements to the detailed design for that part of the authorised development arising as a result of that engagement accord with the scheme design approach and design principles.

Commencement Information

I12Sch. 2 para. 12 in force at 8.9.2022, see art. 1

Surface and foul water drainageE+W

13.—(1) No part of the authorised development is to commence until for that part written details of the surface and foul water drainage system, reflecting the mitigation measures set out in the engineering section drawings (drainage layouts) including means of pollution control, have been submitted to and approved in writing by the Secretary of State following consultation with the relevant local authority on matters relating to its function.

(2) The surface and foul water drainage system must be constructed in accordance with the approved details referred to in paragraph (1) unless otherwise agreed in writing by the Secretary of State following consultation with the relevant local authority on matters relating to its function, provided that the Secretary of State is satisfied that any amendments to the approved details would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

Commencement Information

I13Sch. 2 para. 13 in force at 8.9.2022, see art. 1

Flood compensatory storageE+W

14.—(1) Subject to paragraph (2) below, no part of the authorised development is to commence until a detailed floodplain compensation scheme for that part has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the Environment Agency.

(2) No part of the authorised development at the River Great Ouse is to commence until a detailed floodplain compensation scheme for that part has been submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency.

(3) The schemes prepared under paragraphs (1) and (2) must provide suitable flood storage for any flood waters that would be displaced by the authorised development in the 1 in 100 year plus 35% climate change allowance event.

(4) The scheme must be implemented as approved and subsequently maintained.

Commencement Information

I14Sch. 2 para. 14 in force at 8.9.2022, see art. 1

Safeguarding of milestonesE+W

15.  Any work to the grade II listed milestones with National Heritage Numbers 1163534, 1331394 and 1162760 and the non-designated milestone Historic Environment Record Reference 8808 must be carried out in accordance with the archaeological mitigation strategy.

Commencement Information

I15Sch. 2 para. 15 in force at 8.9.2022, see art. 1

Brook CottagesE+W

16.—(1) Subject to paragraphs (2) and (5), the dismantling of Brook Cottages comprised within Work No. 21 must be carried out in accordance with the Brook Cottages heritage strategy unless otherwise agreed with the Secretary of State.

(2) At the completion of the Brook Cottages soft strip, the undertaker must provide to Historic England and Bedford Borough Council a report containing—

(a)information on the heritage interest and significance of Brook Cottages;

(b)details of the existing physical condition of Brook Cottages; and

(c)in light of (a) and (b) above, options for dismantling Brook Cottages and if relevant, storing, transporting and reconstructing those elements of Brook Cottages that could be relocated to conserve the historic fabric.

(3) Within 35 days of receipt of the information set out in paragraph (2), Historic England, in consultation with Bedford Borough Council, must advise the undertaker of the suitability of proceeding with relocation and, if Historic England advises that the historic fabric is suitable for relocation, it must confirm an approved method of dismantling and storing the historic fabric.

(4) Unless Historic England, in consultation with Bedford Borough Council, advise that the historic fabric is suitable for relocation within 35 days in accordance with paragraph (3) the undertaker must proceed with dismantling and recording as set out in the Brook Cottages heritage strategy but is not required to take any further steps in relation to relocation.

(5) If Historic England, in consultation with Bedford Borough Council, advises that the historic fabric is suitable for relocation then, unless otherwise agreed with the Secretary of State, the undertaker must complete the dismantling and store the historic fabric using the approved method confirmed by Historic England under paragraph (3).

(6) As soon as reasonably practicable following dismantling and storage of the historic fabric in accordance with paragraph (5) the undertaker must submit to the Secretary of State for approval in consultation with Bedford Borough Council and Historic England, either—

(a)details demonstrating why reconstruction is not appropriate; or

(b)details of—

(i)an appropriate future use for the historic fabric;

(ii)a suitable receptor willing to receive the historic fabric;

(iii)the method of transporting the historic fabric for reconstruction;

(iv)a schedule of works for reconstruction; and

(v)a timetable for the completion of the reconstruction.

(7) In the event that the Secretary of State approves details for the relocation of the historic fabric under sub-paragraph (6)(b), the undertaker must relocate the historic fabric in accordance with the details so approved, unless otherwise agreed with the Secretary of State.

(8) The undertaker must provide a copy of the level 3 record to Bedford Borough Council and Historic England on completion of the dismantling.

(9) The level 3 record referred in sub-paragraph (8) is a record prepared in accordance with the Brook Cottages heritage strategy which conforms to a level 3 archaeological record, as defined in Historic England’s Understanding Historic Buildings: A Guide to Good Recording Practice (2016).

Commencement Information

I16Sch. 2 para. 16 in force at 8.9.2022, see art. 1

Highway LightingE+W

17.—(1) No part of the authorised development may be brought into use until a written scheme of the proposed highway lighting to be provided for that part of the authorised development has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant local authority on matters relating to its function.

(2) The highway lighting scheme referred to in paragraph (1) must encompass the specification, level of provision, energy efficiency, light spillage, intensity and brightness of the highway lighting and must—

(a)reflect the mitigation measures included in Chapter 8 Biodiversity and Chapter 14 Climate of the environmental statement; or

(b)where it materially differs from these measures, must demonstrate that the mitigation proposed would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

(3) The highway lighting must be provided in accordance with the approved details referred to in paragraph (1).

(4) Nothing in this requirement restricts the lighting of the authorised development during its construction or where temporarily required for maintenance.

Commencement Information

I17Sch. 2 para. 17 in force at 8.9.2022, see art. 1

Noise MitigationE+W

18.—(1) No part of the authorised development is to commence until written details of the proposed noise mitigation for the use and operation of that part of the authorised development, including noise barriers, noise bunds and low noise surfacing, has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority.

(2) The written details referred to in paragraph (1) must—

(a)reflect the mitigation measures for operation included in Chapter 11 Noise and Vibration, of the environmental statement; or

(b)where it materially differs from these measures, must demonstrate that the mitigation proposed would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

(3) The noise mitigation must be provided in accordance with the approved details referred to in paragraph (1) and must be retained thereafter.

Commencement Information

I18Sch. 2 para. 18 in force at 8.9.2022, see art. 1

Construction hoursE+W

19.—(1) Construction work for the authorised development must only take place between 0700 hours and 1800 hours Monday to Friday, and 0700 hours to 1300 hours on Saturdays, with no activity on Sundays or bank holidays, except as specified in paragraphs (2) and (3).

(2) Outside the hours and days specified in paragraph (1), daily start up and shut down is permitted and construction work may be undertaken for essential activities comprising—

(a)bridge and gantry demolition and installation including the installation of safety systems;

(b)works over and adjacent to the East Coast Main Line railway;

(c)lifting operations;

(d)site clearance of vegetation adjacent to live carriageways;

(e)site clearance of signs, street furniture and lighting columns adjacent to live carriageways;

(f)any oversize deliveries or deliveries where daytime working would be excessively disruptive to normal traffic operation, including delivery of plant;

(g)junction and highway tie-in works;

(h)installation of temporary and permanent line markings;

(i)traffic management measures and signal changes;

(j)installation of signs and technology;

(k)any emergency works or operations required for safe working;

(l)completion of activities already begun which require continuous periods of operation, such as completing concrete pouring; or

(m)non-intrusive environmental and engineering surveys.

(3) Outside the hours and days specified in paragraph (1), the undertaker may with the prior written consent of the relevant planning authority carry out the following activities—

(a)concrete pours and piling, diaphragm wall works, pavement operations;

(b)work associated with the diversion of existing utilities, including the removal of overhead power lines;

(c)earthworks operations, including excavation, filling, transport, placing and compacting of earthworks material;

(d)intrusive environmental and engineering surveys; or

(e)activities assessed in the environmental statement or which would not give rise to new or materially different effects from those assessed in the environmental statement which do not fall within paragraph (2).

Commencement Information

I19Sch. 2 para. 19 in force at 8.9.2022, see art. 1

Pre-commencement worksE+W

20.  Any pre-commencement works must be carried out in accordance with the biodiversity pre-commencement plan and the pre-commencement plan.

Commencement Information

I20Sch. 2 para. 20 in force at 8.9.2022, see art. 1

Flood risk assessmentE+W

21.—(1) Subject to sub-paragraph (2), the authorised development must be carried out in accordance with the flood risk assessment, including the mitigation measures detailed in it, so that no part of the authorised development is predicted to result in any exceedance of the flood levels to properties and land shown in the flood risk assessment.

(2) Sub-paragraph (1) does not apply in any circumstance where the undertaker proposes to carry out a part of the authorised development otherwise than in accordance with the flood risk assessment and either demonstrates to the Secretary of State’s satisfaction, in consultation with the Environment Agency, that the part of the authorised development concerned would not result in an exceedance of the flood levels shown in the flood risk assessment beyond 10mm or demonstrates that all affected landowners accept the predicted exceedance of the flood levels shown in the flood risk assessment.

Commencement Information

I21Sch. 2 para. 21 in force at 8.9.2022, see art. 1

Construction phase local traffic monitoringE+W

22.—(1) No part of the authorised development is to commence until a construction phase local traffic monitoring scheme for the locations identified in the outline construction traffic management plan has been submitted to, and, following consultation with the relevant local highway authority, approved by the Secretary of State.

(2) The construction phase local traffic management scheme must include—

(a)a survey to assess baseline traffic at the locations identified in the outline construction traffic management plan;

(b)the methodology to be used to collect the required data;

(c)the periods over which construction phase traffic is to be monitored;

(d)proposals for the submission of the survey data collected and an interpretative report to be provided to the relevant local highway authority; and

(e)surveys as agreed in paragraphs (b) to (d) at the location in paragraph (a).

(3) The scheme approved under sub-paragraph (1) must be implemented by the undertaker unless otherwise agreed in writing with the Secretary of State following consultation with the relevant local highway authority.

Commencement Information

I22Sch. 2 para. 22 in force at 8.9.2022, see art. 1

Operation phase local traffic monitoringE+W

23.—(1) No part of the authorised development is to commence until an operation phase local traffic monitoring scheme has been submitted to, and following consultation with the relevant local highway authority, approved by the Secretary of State for the following locations—

(a)Great North Road, between A428 and Nelson Road;

(b)Cambridge Road, between Station Road and A428;

(c)Park Street East, Dry Drayton;

(d)Brook Lane, Coton; and

(e)St Neots Road, Sandy.

(2) The operation phase local traffic monitoring scheme must include—

(a)a survey to assess baseline traffic levels at the locations listed in sub-paragraph (1)(a) to (e);

(b)an operation [F1phase] traffic survey at the locations listed in sub-paragraph (1)(a) to (e) within the first year and fifth year following the date on which the authorised development is fully completed and open for traffic to assess the changes in traffic from the baseline;

(c)the methodology to be used to collect the required data;

(d)the periods over which operation [F2phase] traffic is to be monitored; and

(e)proposals for the submission of the survey data collected and an interpretative report to be provided to the relevant local highway authority.

(3) The scheme approved under sub-paragraph (1) must be implemented by the undertaker unless otherwise agreed in writing with the Secretary of State following consultation with the relevant local highway authority.

Textual Amendments

Commencement Information

I23Sch. 2 para. 23 in force at 8.9.2022, see art. 1

Biodiversity net gain assessment and offsetting schemeE+W

24.—(1) No part of the authorised development is to commence until an updated biodiversity net gain assessment has been submitted to, and, following consultation with Natural England and the relevant local planning authorities, approved by the Secretary of State.

(2) The biodiversity net gain assessment must describe—

(a)the scope of the assessment, which must include priority habitats such as lowland mixed deciduous woodland, wood-pasture and parkland, and hedgerows;

(b)the methodology used to collect the required data based on a metric that has been agreed with Natural England and the relevant local planning authorities (such agreement not to be unreasonably withheld or delayed);

(c)the timing of the assessment; and

(d)the assessment findings and conclusions.

(3) If the assessment findings and conclusions demonstrate that a loss of priority habitat will be incurred, no part of the authorised development is to commence until a biodiversity offsetting scheme has been submitted to, and, following consultation with Natural England and the relevant local planning authorities, approved by the Secretary of State.

(4) A biodiversity offsetting scheme must include—

(a)details of how any priority habitat losses incurred as a result of the authorised development will be offset and the target condition for each habitat; and

(b)a programme for the implementation, monitoring and management of the biodiversity offset proposals.

(5) The biodiversity offsetting scheme must provide for its implementation before any part of the authorised development is open to traffic.

Commencement Information

I24Sch. 2 para. 24 in force at 8.9.2022, see art. 1

Approvals and amendments to approved detailsE+W

25.  With respect to any requirement which requires the authorised development to be carried out in accordance with the details approved under this Schedule, the approved details are taken to include any amendments that may subsequently be approved or agreed in writing by the Secretary of State.

Commencement Information

I25Sch. 2 para. 25 in force at 8.9.2022, see art. 1

(1)

1990 c. 43. Section 78A was inserted by section 57 of the Environment Act 1995 (c. 25) and was amended by section 86(2) the Water Act 2003 (c. 37).

(4)

Section 43(3) was substituted by section 133(4) of the Localism Act 2011 (c. 20).

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill