Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Article 34
Commencement Information
I1Sch. 7 in force at 10.3.2023, see art. 1
(1) Location | (2) Plot Reference Number shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised development |
---|---|---|---|
Parish of Thornhaugh | 1/1a | Temporary storage and working area to support construction of the following in adjoining land parcels: a new private means of access to 4 properties, diversion, protection and removal of potable water pipes and the protection of the NGG gas pipeline including the crossing of Work No. 2. | 2, 3, 4 |
Parish of Thornhaugh | 1/1c | Temporary storage and working area to support construction of the following in adjoining land parcels: a new private means of access to 4 properties, diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables. | 2, 3 |
Parish of Thornhaugh | 1/1e | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, overhead and underground electricity cables crossing Work No. 2 and protection of NGG gas pipeline. | 3, 4 |
Parish of Thornhaugh | 1/3a | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 3 |
Parish of Thornhaugh | 1/3c | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 3 |
Parish of Thornhaugh | 1/9a | Protection, diversion and removal of existing water pipes, electricity and telecommunications cables and associated apparatus Temporary storage and working area to support construction of the following in adjoining land parcels: new private means of access to 4 properties and a service vehicle turning point including earthworks and associated drainage. Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 2, 3 |
Parish of Thornhaugh | 1/10a | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 3, 5 |
Parish of Wansford | 2/1d | Temporary protection of electricity and telecommunications cables and associated apparatus. Temporary storage and working area to support construction of the following in adjoining land parcels: improvement to the eastbound carriageway of the existing A47 including the realignment of the central reserve and a new cycle crossing point at the Wansford western roundabout. | 12 |
Parish of Thornhaugh | 2/3b | Temporary storage and working area to support construction of the following in adjoining land parcels: new carriageway to create a free flow link from A1 southbound to the dualled A47 eastbound including embankments and associated drainage. Temporary storage and working area to support diversion and removal of underground electronic communication cables and apparatus and adjacent utilities works. | 5, 6 |
Parish of Wansford | 3/1c | Temporary protection of electricity and telecommunications cables and associated apparatus. Temporary storage and working area to support construction of the following in adjoining land parcels new carriageway to create a free flow link from A1 southbound to the dualled A47 eastbound including embankments and associated drainage. Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline including earthworks and associated drainage. Temporary storage and working area to support diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and adjacent utilities works. | 1, 2, 6 |
Parish of Wansford | 3/1j | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes and construction of a site office and construction areas. | 16 |
Parish of Wansford | 3/1l | Temporary protection of water pipes, sewers, electricity and telecommunications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes and construction of a site office and construction areas. | 16 |
Parish of Wansford | 3/1o | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes and construction of a site office and construction areas. | 16 |
Parish of Wansford | 3/2c | Temporary welfare and compound area including a haul route. | 24 |
Parish of Wansford | 3/2e | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage. Temporary storage and working area to facilitate construction of the following in adjoining land parcels: a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage. Temporary welfare and compound area including a haul route. | 1, 21, 24 |
Parish of Wansford | 3/2i | Temporary protection of water pipes and associated apparatus. Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the termination point to the east for tie into existing A47 including earthworks and associated drainage. Temporary storage and working area to facilitate construction of the following in adjoining land parcels: a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage. Temporary welfare and compound area including a haul route. | 1, 21, 24 |
Parish of Wansford | 3/2k | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the termination point to the east for tie into existing A47 including earthworks and associated drainage. Temporary welfare and compound area including a haul route. | 1, 24 |
Parish of Wansford | 3/3d | Temporary storage and working area to support provision of a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage. | 23 |
Parish of Wansford | 3/3g | Temporary storage and working area to support provision of a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage and access link to Sacrewell Farm. | 23 |
Parish of Wansford | 3/4h | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes, provision of a site office and construction area and a new Sacrewell Farm Underbridge under the dualled A47 (Work No. 1) including structural units, concrete foundations, drainage and waterproofing. | 16, 25 |
Parish of Wansford | 3/4i | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes, provision of a site office and construction area and protection, diversion and resilience works to large diameter water pipelines and associated apparatus and adjacent utility works. | 16, 27 |
Parish of Wansford | 3/5a | Temporary storage and working area to facilitate construction of the following in adjoining land parcels: the removal of underground electricity cables crossing Work Nos. 1, 8, 10, 11, 13, 16, 17, 21 and 26, and improvements to the existing A1/A47 on and off ramps to the Wansford east roundabout including earthwork widening. | 9, 11, 27 |
Parish of Wansford | 4/2b | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage, the provision of support for a new balancing pond to the north of the dualled A47 (Work No. 1) including drainage inlets, an outlet to river Nene and an access track. Temporary storage and working area to support the diversion and removal of overhead electrical cables and adjacent utilities works. | 1, 28, 29 |
Parish of Wansford and Parish of Sutton | 4/2f | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage and adjacent utilities works. | 1, 16, 26 |
Parish of Sutton | 4/2i | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the termination point to the existing A47 including earthworks and associated drainage and adjacent utilities works and provision of a new balancing pond to the north of the dualled A47 (Work No. 1) including drainage inlets, an outlet to river Nene and an access track. | 1, 16, 26, 27, 28 |
Parish of Wansford | 4/3d | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage, a new length of carriageway to form a new link road from A47 Wansford eastern roundabout (Work No. 13) and a new A47 westbound off slip from the dualled A47 (Work No. 1) including earthworks, associated drainage and a cycle track, and adjacent utilities works. | 1, 15, 16, 29 |
Parish of Wansford | 4/3f | Temporary storage and working area to support diversion and removal of overhead electrical cables crossings and utilities works in adjoining land parcels. | 29 |
Parish of Sutton | 4/5b | Temporary storage and working area to support diversion and removal of electronic communication cables and apparatus and utilities works in adjoining land parcels. | 36 |
Parish of Sutton | 4/6b | Temporary storage and working area to support diversion and removal of overhead electrical cables crossings and utilities works in adjoining land parcels. | 29, 32 |
Parish of Sutton | 4/9a | Temporary access route from Work No. 37 turning to temporary welfare and compound area including a haul road to the north of the dualled A47 (Work No. 1) and a new temporary access track from Work No. 37. | 38 |
Parish of Sutton | 5/3a | Temporary storage and working area to facilitate construction of the following in adjoining land parcels: new Sutton Heath House roundabout (Work No. 44) north to Sutton Heath Road including earthworks and drainage and access points. | 42 |
Parish of Sutton | 5/3b | Temporary storage and working area to facilitate construction of the following in adjoining land parcels: new Sutton Heath House roundabout (Work No. 44) north to Sutton Heath Road including earthworks and drainage and access points. | 42 |
Parish of Upton | 5/4d | Temporary storage and working area to support diversion of electronic overhead and underground communication cables and apparatus crossings in adjoining land parcels. | 56 |
Parish of Upton | 5/5b | Temporary storage and working area to support improvements to the existing Upton Drift including passing places and other works in adjoining land parcels. | 55 |
Parish of Upton | 5/6a | Temporary storage and working area to support construction of the following in adjoining land parcels: improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm. | 55 |
Parish of Upton | 5/6c | Temporary storage and working area to support improvements to the existing Upton Drift including passing places in adjoining land parcels. | 55 |
Parish of Upton | 5/6e | Temporary storage and working area to support improvements to the existing Upton Drift including passing places and connected works in adjoining land parcels. | 55 |
Parish of Upton | 5/6g | Temporary storage and working area to support diversion of electronic overhead and underground communication cables and apparatus crossings in adjoining land parcels. | 56 |
Parish of Upton | 5/6h | Temporary storage and working area to support diversion of electronic overhead and underground communication cables and apparatus crossing in adjoining land parcels. | 56 |
Parish of Upton | 5/6k | Temporary storage and working area to support diversion of the underground cables and protection of the foul sewer crossings in adjoining land parcels. | 58 |
Parish of Upton | 5/6l | Temporary storage and working area to support improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm including earthworks and drainage in adjoining land parcels. | 55 |
Parish of Upton | 5/7a | Temporary storage and working area to support improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm including earthworks and drainage in adjoining land parcels. | 55 |
Parish of Upton | 5/7c | Temporary storage and working area to support improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm including earthworks and drainage in adjoining land parcels. | 55 |
Parish of Upton | 5/8a | Temporary storage and working area to support diversion of the underground cables and protection of the foul sewer crossings in adjoining land parcels. | 58 |
Parish of Sutton | 6/1e | Temporary storage and working area to support with the creation of a new turning head to the existing Drift with gated access for service providers for 250 metres including earthworks, drainage, sub-base layers, pavement, signage, fence and gates in adjoining land parcels. | 47 |
Parish of Sutton | 6/2a | Temporary storage and working area to support a new access route from Work No. 37, temporary welfare and compound area including haul road to the north of the dualled A47 in adjoining land parcels. | 38 |
Parish of Sutton | 6/3f | Temporary storage and working area to support creation of new turning head to the existing drift with gated access for service providers for 250 metres including earthworks, drainage, sub-base layers, pavement, signage, fence, and gates in adjoining land parcels. | 47 |
Parish of Sutton | 6/3h | Temporary storage and working area to support diversion and removal of existing electronic communication cables and apparatus, underground electricity cables, and utility works in adjoining land parcels. | 48 |
Parish of Sutton | 6/4a | To support access route from Work No. 37. Temporary welfare and compound area including haul road to the north of the dualled A47 (Work No. 1). To support diversion and removal of electronic communication cables and apparatus, electrical cables and potable water pipes and adjacent utility works in adjoining land parcels. | 36, 38 |
Parish of Sutton | 6/4e | Temporary storage and working area to support a new access route from Work No. 37. Temporary welfare and compound area including haul road to the north of the dualled A47 (Work No. 1) and a new temporary access track from Work No. 37. | 38 |
Parish of Sutton | 6/4g | Temporary storage and working area to support a new access route from Work No. 37. Temporary welfare and compound area including haul road to the north of the dualled A47 (Work No. 1) and a new temporary access track from Work No. 37. Temporary storage and working area to facilitate the protection, diversion and resilience works to potable water pipes and associated apparatus and adjacent utility works in adjoining land parcels. | 38, 49 |
Parish of Sutton | 6/5b | Temporary storage and working area to support the following in adjoining land parcel: diversion, and removal of existing electronic communication cables and apparatus, underground electricity cables, and adjacent utility works, ecological works and provision of landscaping area to the south of the dualled A47. | 39, 48 |
Parish of Sutton | 6/5e | Temporary storage and working area to support alterations to The Drift in adjoining land parcels. | 47 |
Parish of Sutton | 7/3a | Temporary storage and working area to support alterations to The Drift and to facilitate the protection, diversion and resilience works to potable water pipes and associated apparatus and utility works in adjoining land parcels. | 47, 49 |
Parish of Sutton | 7/4b | Temporary storage and working area to support alterations to The Drift and to support diversion and removal of existing electronic communication cables and apparatus, underground electricity cables, and potable water pipes and utility works in adjoining land parcels. | 47, 48 |
Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys