Interpretation

This adran has no associated Memorandwm Esboniadol

2.—(1) In this Order, “2022 Order” means the Electricity and Gas (Energy Company Obligation) Order 2022(1).

(2) In Parts 1 to 9—

2015 Regulations” means the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015(2);

annual cost savings”, in relation to a measure, means—

(a)

the money that would be saved by the measure annually in heating domestic premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas; and

(b)

where the measure also results in savings in the cost of heating water, the money that would be saved by the measure annually in heating water in the premises;

cavity wall insulation” means insulation between the leaves of a cavity wall;

commencement date” means the date on which Parts 1 to 9 come into force;

completed”, in relation to a measure, has the meaning given in paragraph (4);

ECO4A phase” means one of the three phases as follows—

(a)

the period beginning with the commencement date and ending with 31st March 2024 (“phase A”);

(b)

the twelve months ending with 31st March 2025 (“phase B”);

(c)

the twelve months ending with 31st March 2026 (“phase C”);

ECO4A qualifying action” has the meaning given in article 10;

equivalent ECO4 phase” means—

(a)

in relation to phase A, phase 2;

(b)

in relation to phase B, phase 3;

(c)

in relation to phase C, phase 4,

and for the purposes of this definition, “phase 2”, “phase 3” and “phase 4” have the meanings given in article 2(1) of the 2022 Order;

flat in-fill measure” means a measure that meets the condition in article 20 (see paragraph (1) of that article);

group” means a group of companies that includes as members of the group at least two companies that are licence-holders, and for the purpose of this definition—

(a)

company” includes any body corporate; and

(b)

group of companies” means a holding company and the wholly-owned subsidiaries of that holding company where “holding company” and “wholly-owned subsidiary” have the same meaning as in section 1159 of the Companies Act 2006(3);

heating control measure” means—

(a)

a thermostat that is connected to a system which provides heat for the purposes of space heating; or

(b)

a type of control listed in sections 9.4.1 to 9.4.6 of the Standard Assessment Procedure;

house in-fill measure” means a measure that meets the condition in article 21 (see paragraph (1) of that article);

in-fill measure” means a flat in-fill measure or a house in-fill measure;

innovation measure” means a standard innovation measure within the meaning of article 31(5)(f) or a substantial improvement innovation measure within the meaning of article 31(5)(g);

insulation measure” means a measure which—

(a)

improves the insulating properties of domestic premises;

(b)

in the case of a measure installed at domestic premises other than a mobile home, is one of the following—

(i)

cavity wall insulation;

(ii)

solid wall insulation;

(iii)

internal or external insulation of a wall, but not including cavity wall insulation or solid wall insulation;

(iv)

loft insulation;

(v)

insulation of the walls and ceiling of a habitable room in the roof space of the domestic premises;

(vi)

insulation of a flat roof;

(vii)

insulation of a pitched roof;

(viii)

insulation against the escape of heat from a habitable room into the ground, or space, beneath the domestic premises; and

(c)

in the case of a measure installed at a mobile home, is the insulation of the floor, walls and ceiling of the mobile home;

landlord” has the meaning given in regulation 21(b)(i) of the 2015 Regulations;

licence-holder” means a person holding one or both of the following—

(a)

a licence under section 6(1)(d) of the Electricity Act 1989(4);

(b)

a licence under section 7A(1) of the Gas Act 1986(5);

loft insulation” means insulation against the escape of heat from a habitable room into the loft area of a domestic premises;

low-income minimum requirement” means, in relation to a participant and subject to article 34 (transfer of obligations), the amount determined under article 6(2) for the participant in respect of an ECO4A phase;

low-income qualifying action” means an ECO4A qualifying action which is an ECO4A qualifying action by virtue of meeting the condition in any of articles 13 to 19;

“participant”, other than in the definition of “ECO4 participant” in article 4(3), has the meaning given in article 4(1) and (2);

pre-installation energy efficiency assessment” means an RdSAP assessment performed in accordance with article 22(1)(a)(i);

pre-installation SAP band” means the SAP band which is determined for a domestic premises pursuant to a pre-installation energy efficiency assessment;

PRS Exemptions Register” has the meaning given in regulation 36 of the 2015 Regulations;

qualification year” means—

(a)

for phase A, the year 2022;

(b)

for phase B, the year 2023;

(c)

for phase C, the year 2024;

RdSAP assessment” means an assessment of the energy efficiency of domestic premises using the Reduced Data Standard Assessment Procedure;

Reduced Data Standard Assessment Procedure” means the Reduced Data Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.94)(6);

SAP band” means the band running from A to G which is assigned to a SAP rating under the Reduced Data Standard Assessment Procedure;

SAP rating” means the energy efficiency rating of a domestic premises determined in accordance with the Reduced Data Standard Assessment Procedure;

score” means the contribution made by an ECO4A qualifying action towards a participant’s total home-heating cost reduction obligation;

statement of intent”, in relation to a relevant authority, means a statement that the relevant authority intends to identify households living in domestic premises that may benefit from the installation of an ECO4A eligible measure, and for the purposes of this definition, an “ECO4A eligible measure” is a measure that would be capable of satisfying article 10 if installed at the domestic premises;

total home-heating cost reduction obligation” means, in relation to a participant, the sum of the participant’s home-heating cost reduction obligations, if any, for each ECO4A phase(7);

total low-income minimum requirement” means, in relation to a participant, the sum of the participant’s low-income minimum requirements, if any, for each ECO4A phase.

(3) In Parts 1 to 9, the following expressions have the same meanings as in the 2022 Order—

“domestic premises”;

“mobile home”;

“owner-occupied premises”;

“private domestic premises”;

“private rented premises”;

“qualifying supply”;

“relevant authority”;

“social housing”;

“solid wall insulation”;

“Standard Assessment Procedure”(8).

(4) For the purposes of Parts 1 to 9—

(a)a notification or application to the Administrator(9) is to be treated as having been made when the notification or application is received by the Administrator;

(b)a measure is completed when the installation of the measure is completed.

(4)

Section 6 was substituted by section 30 of the Utilities Act 2000 (c. 27) and amended by section 89(3) of the Energy Act 2004 (c. 20) and S.I. 2011/2704. There are other amendments which are not relevant.

(5)

Section 7A was inserted by section 6(1) of the Gas Act 1995 (c. 45) and amended by section 3(2) of, and Schedule 6 to, the Utilities Act 2000. There are other amendments which are not relevant.

(6)

Copies can be accessed at https://bregroup.com/wp-content/uploads/2019/09/RdSAP_2012_9.94-20-09-2019.pdf. A copy can be inspected by contacting the Energy Company Obligation Team at the Department for Energy Security and Net Zero, 1 Victoria Street, London SW1H 0ET.

(7)

See section 33BD(1) of the Gas Act 1986 and section 41B(1) of the Electricity Act 1989 for the definition of “home-heating cost reduction obligation”. Subject to article 34, a participant’s home-heating cost reduction obligation for an ECO4A phase is the amount determined for the participant under article 6(1).

(8)

The Government’s Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92). Copies can be accessed at https://www.bre.co.uk/filelibrary/SAP/2012/SAP-2012_9-92.pdf. A copy can be inspected by contacting the Energy Company Obligation Team at the Department for Energy Security and Net Zero, 1 Victoria Street, London SW1H 0ET.

(9)

The Administrator is the Gas and Electricity Markets Authority. See sections 33BD(2)(a) and 66 of the Gas Act 1986 and sections 41B(2)(a) and 111 of the Electricity Act 1989.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill