Articles 19, 20 and 31

SCHEDULE 4PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS & PROVISION OF NEW HIGHWAYS AND PRIVATE MEANS OF ACCESS

In relating this Schedule to the streets, rights of way and access plans and the de-trunking and stopping up plans, the provisions described in this Schedule are shown on those plans in the following manner—

(a)Existing highways are to be stopped up, as described in column (2) of Parts 1 and 2 of this Schedule, are shown—

(i)in respect of carriageway highways, by thick black diagonal hatching on the de-trunking and stopping up plans (as shown in the key on those plans) over the extent of the area to be stopped up; and

(ii)in respect of public rights of way by a black dashed line on the streets, rights of way and access plans, with the letter “X” in the intervals (as shown in the key on those plans),

which are described in column (3) of Parts 1 and 2 of this Schedule.

(b)New highways which are to be substituted for a highway to be stopped up (or which are otherwise to be provided), as are specified in column (4) of Part 2 and column (2) of Part 3 of this Schedule, are shown by—

(i)red cross-hatching (for motorways and trunk roads),

(ii)blue cross-hatching (for other classified roads and highways) and

(iii)solid blue shading (for footpaths, footways and cycle tracks)

(as shown in the key on the streets, rights of way and access plans) and are given a reference label (a capital letter in a circle) and will be a road unless the word ‘footpath’, ‘bridleway’, ‘footway’ or ‘cycle track’ appears beneath its reference letter in column (4) of Part 2 or column (2) of Part 3 of this Schedule.

(c)Private means of access to be stopped up, as described in column (2) of Parts 4 and 6 of this Schedule, are shown by solid black shading (as shown in the key on the streets, rights of way and access plans) over the extent of stopping up described in column (3) of Parts 4 and 6 of this Schedule, and are given a reference label (a lower case letter in a circle).

(d)New private means of access to be submitted for a private means of access to be stopped up (or which are otherwise to be provided), as are included in column (4) of Part 4 and column (2) of Part 5 of this Schedule, are shown by black line hatching (as shown in the key on the streets, rights of way and access plans) and are given a reference label (a number in a circle).

PART 1HIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Highway to be stopped up

(3)

Extent of stopping up

De-trunking and stopping up plan – Sheet Nos. 6 and 7
Hatfield Peverel CPExisting A12 southbound on-slip road.

Reference F/d (sheets 6 and 7)

Existing A12 southbound on-slip road, for a distance of 134 metres to sheet 7.

De-trunking and stopping up plan – Sheet No. 7
Hatfield Peverel CPA12 northbound on-slip road.

Reference G/a

Existing A12 northbound on-slip road, for a distance of 78 metres.

De-trunking and stopping up plan – Sheet No. 12
Kelvedon CPA12 junction 23 northbound off-slip road.

Reference L/b

Existing A12 northbound off-slip road, for a distance of 367 metres.

Kelvedon CPA12 junction 23 southbound on-slip road.

Reference L/e

Existing A12 southbound on-slip road, for a distance of 143 metres.

Kelvedon CPA12 junction 23 southbound on-slip road.

Reference L/g

Existing A12 southbound on-slip road, for a distance of 210 metres.

Streets, rights of way and access plans – Sheet No. 13
Great Braxted CPFootpath No. 246_2.From point m/b to point m/c, a distance of 32 metres.
De-trunking and stopping up plan – Sheet No. 18 (and 19)
Marks Tey CPLondon Road

Reference R/e

Existing London Road, for a distance of 63 metres.

Marks Tey CPHall Chase Road

Reference R/f

For a distance of 77 metres.

Marks Tey CPFootpath No. 144_18.From point r/c to r/d for a distance of 150 metres.

PART 2HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Highway to be stopped up

(3)

Extent of stopping up

(4)

New highway to be substituted/provided

Sheet No. 2 (and 1)De-trunking and stopping up plansStreets, rights of way and access plans
Boreham CPGenerals Lane

Reference B/a

For a distance of 201metres

Reference B/10

The realigned Beaulieu Park Radial Distributor Road from the northeastern side of the Generals Lane Roundabout, tying into Beaulieu Park radial distributor road, for a distance of 225 metres.

Boreham CPExisting J19 Southbound on-slip road

Reference B/i

For a distance of 128 metres.

Reference B/1 (sheets 1 and 2)

The junction 19 southbound on-slip road, from the Generals Farm Roundabout, in a southerly direction for a distance of 474 metres.

Streets, rights of way and access plans – Sheet No. 2
Boreham CPBridleway 213_45From point b/a to point b/b, a distance of 17 metres.578 metres of bridleway from point 2/11 to 2/12.
Boreham CPBridleway 213_23From point b/c to point b/d, a distance of 40 metres.578 metres of bridleway from point 2/11 to 2/12.
Sheet No. 4De-trunking and stopping up plansStreets, rights of way and access plans
Hatfield Peverel CPA12 southbound on-slip road (Junction 20a)

Reference D/a

For a distance of 281 metres.

Reference F/5 (sheet 5)

The new junction 21 southbound on-slip road, from the junction 21 southern roundabout, in a southerly direction for a distance of 410 metres.

Sheet No. 5 (and 6)De-trunking and stopping up plansStreets, rights of way and access plans
Hatfield Peverel CPA12 northbound off-slip road (Junction 20A)

Reference E/a

For a distance of 314 metres.

Reference F/4

The new junction 21 northbound off-slip road, from the diverge from the realigned A12 (northbound) to the point where it meets the junction 21 northern roundabout, a distance of 370 metres.

Hatfield Peverel CPBury Lane

Reference E/b

For a distance of 135 metres (excluding the A12 mainline running under the overbridge).

Reference E/2

The Bury Lane overbridge replacement, in the same location, a distance of 87 metres.

Hatfield Peverel CPStation Road

Reference E/c

For a distance of 106 metres (excluding the A12 mainline running under the overbridge).

Reference E/3

The Station Road overbridge replacement, in the same location, a distance of 106 metres.

Hatfield Peverel CPVineyards slip road and Wellington Overbridge

Reference E/d

For a distance of 178 metres (excluding the A12 mainline running under the Wellington Road overbridge).

Reference E/4

The new Hatfield Peverel Link Road, including the Wellington Road Overbridge Replacement, from the B1137 and Maldon Road junction, crossing the new A12 mainline and extending east to join the new J12 northern roundabout, a distance of 895 metres.

Sheet No. 6De-trunking and stopping up plansStreets, rights of way and access plans
Hatfield Peverel CPA12 Hatfield Road (B1389) northbound off-slip road

Reference F/b

For a distance of 135 metres.

Reference F/2

The new junction 21 southbound off-slip road, from the diverge from the realigned A12 (southbound) to the point where it meets the junction 21 southern roundabout, a distance of 56 metres.

Hatfield Peverel CPA12 Hatfield Road (B1389) northbound off-slip road

Reference F/c

For a distance of 60 metres.

Reference F/2

The new junction 21 southbound off-slip road, from the diverge from the realigned A12 (southbound) to the point where it meets the junction 21 southern roundabout, a distance of 56 metres.

Hatfield Peverel CPA12 Southbound on-slip road

Reference F/e

For a distance of 29 metres (excluding mainline running over underbridge).

Reference F/5 (sheet 5)

The new junction 21 southbound on-slip road, from the junction 21 southern roundabout, in a southerly direction for a distance of 410 metres.

Hatfield Peverel CPA12 southbound off-slip road (Junction 20B)

Reference F/f

For a distance of 325 metres.

Reference F/2

The new junction 21 southbound off-slip road, from the diverge from the realigned A12 (southbound) to the point where it meets the junction 21 southern roundabout, a distance of 56 metres.

Streets, rights of way and access plans – Sheet No. 6 (and 7)
Hatfield Peverel CPFootpath 90_02From point f/a to point f/b, a distance of 19 metres.66 metres of footpath from point 6/2 to 6/3.
Hatfield Peverel CPFootpath 90_40From point f/c to point f/d, a distance of 32 metres.1,058 metres of cycle track comprised in a highway from point 6/4 to 6/20 (except between point 6/4 and point 6/35 where it constitutes a highway).
Hatfield Peverel CP; Witham CPFootpath 90_29From point f/e (inset B) to point g/a (sheet 7), a distance of 125 metres.125 metres of footpath from point 6/30 to 7/1 (sheet 7).
Sheet No. 7De-trunking and stopping up plansStreets, rights of way and access plans
Witham CPHowbridge Hall Road

Reference G/b

For a distance of 23 metres.

Reference G/1

The new Howbridge Hall Road, from a point 357 metres north of the start of the existing Howbridge Hall Road in a westerly direction, for a distance of 39 metres.

Streets, rights of way and access plans – Sheet No. 8
Witham CPFootpath 121_95From point h/c to point h/d, a distance of 112 metres.579 metres of footpath from point 8/1 to 8/4.
Witham CPFootpath 121_101From point h/a to point h/b, a distance of 165 metres.158 metres of footpath from point 8/2 to 8/3.
Streets, rights of way and access plans – Sheet No. 9 (and 8 and 10)
Witham CPFootpath 121_103From point i/a to point i/b, a distance of 74 metres.

(a) 1107 metres of footpath from point 8/5 (sheet 8) to 9/1; and

(b) 818 metres of cycle track comprised in a highway from point 10/1 (sheet 10) to 10/2 (sheet 10) (except between point 10/1 and point 10/6 where it constitutes a highway).

Sheet No. 10De-trunking and stopping up plansStreets, rights of way and access plans
Rivenhall CPJunction 22 northbound off-slip road

Reference J/a

For a distance of 82 metres.

Reference J/5

The new junction 22 northbound off-slip road, from the A12 mainline northbound diverge, in an easterly direction to the new junction 22 northern roundabout, a distance of 492 metres.

Rivenhall CPJunction 22 northbound on-slip road

Reference J/b

For a distance of 259 metres.

Reference J/11

The new junction 22 northbound on-slip road, from the junction 22 northern roundabout, in an easterly direction to merge with the new A12 northbound carriageway, a distance of 444 metres.

Rivenhall CPA12 northbound

Reference J/c

For a distance of 1,040 metres (excluding the Colemans Bridge overbridge running over the A12 mainline).

Reference J/4

The new road between the Eastways junction and the junction 22 northern roundabout, a distance of 508 metres.

Rivenhall CPA12 northbound (reference J/3); existing A12 southbound (reference J/4)

Reference J/d

For a distance of 960 metres (excluding the Colemans Bridge overbridge running over the A12 mainline).

Reference J/4

The new road between the Eastways junction and the junction 22 northern roundabout, a distance of 508 metres.

Rivenhall CPJunction 22 southbound on-slip road

Reference J/e

For a distance of 90 metres.

Reference J/6

The new junction 22 southbound on-slip road, from the new junction 22 southern roundabout, in a westerly direction to its merge with the new A12 mainline southbound carriageway, a distance of 466 metres.

Rivenhall CPJunction 22 southbound off-slip road

Reference J/f

For a distance of 266 metres.

Reference J/12

The new junction 22 southbound off-slip road, from the A12 mainline southbound diverge, in a westerly direction to the new junction 22 southern roundabout, a distance of 544 metres.

Rivenhall CPLittle Braxted Lane

Reference J/g

For a distance of 269 metres.

Reference J/3

The realigned Little Braxted Lane, including access to Colemans Quarry, from the new junction 22 southern roundabout, in a westerly direction for a distance of 544 metres.

Rivenhall CPColeman’s Bridge

Reference J/h

For a distance of 200 metres (excluding the A12 mainline running under Coleman’s bridge).

Reference J/8

The new Little Braxted Lane overbridge, connecting the junction 22 northern roundabout and the junction 22 southern roundabout, a distance of 103 metres.

Sheet No. 11 (and 12)De-trunking and stopping up plansStreets, rights of way and access plans
Rivenhall CPA12 northbound

Reference K/a

For a distance of 372 metres.

Reference K/4

The existing A12 from the Rivenhall End west roundabout, in a westerly direction, for a distance of 117 metres.

Rivenhall CPA12 southbound

Reference K/b

For a distance of 366 metres.

Reference K/4

The existing A12 from the Rivenhall End west roundabout, in a westerly direction, for a distance of 117 metres.

Rivenhall CPOak Road South

Reference K/c

For a distance of 48 metres.

Reference K/9

The northern realigned Henry Dixon Road, from the realigned Braxted Road, 109 metres south of the new Rivenhall End west roundabout, in an easterly direction, for a distance of 252 metres.

Rivenhall CPHenry Dixon Road

Reference K/d

For a distance of 232 metres.

Reference K/6

The realigned Braxted Road, from the Rivenhall End west roundabout, in a southerly direction for a distance of 519 metres.

Rivenhall CPBraxted Road

Reference K/e

For a distance of 147 metres.

Reference K/10

The southern realigned Henry Dixon Road, from the realigned Braxted Road, 447 metres south of the new Rivenhall End west roundabout, in a northerly direction, for a distance of 81 metres.

Rivenhall CP; Kelvedon CPA12 northbound

Reference K/f (sheets 11 and 12)

For a distance of 1,298 metres.

Reference K/1 (sheets 11 and 12)

The new B1024 Link Road, from the new Rivenhall End east roundabout, in an easterly direction to the B1024 Junction with Essex Fire and Rescue access, a distance of 1,297 metres.

Rivenhall CP; Kelvedon CPA12 southbound

Reference K/g (sheets 11 and 12)

For a distance of 1,295 metres.

Reference K/1 (sheets 11 and 12)

The new B1024 Link Road, from the new Rivenhall End east roundabout, in an easterly direction to the B1024 Junction with Essex Fire and Rescue access, a distance of 1,297 metres.

Streets, rights of way and access plans – Sheet No. 11 (and 12)
Rivenhall CP; Kelvedon CPFootpath 105_46From point k/a to point k/b, a distance of 170 metres.563 metres of footpath from point 11/23 to 12/1 (sheet 12).
Rivenhall CPFootpath 105_36From point k/c to point k/d, a distance of 612 metres.

(a) 92 metres of footpath from point 11/21 to 11/22; and

(b) 533 metres of cycle track comprised in a highway from point 11/34, 158 metres west of point k/c, to 12/25 (sheet 12).

Sheet No. 12De-trunking and stopping up plansStreets, rights of way and access plans
Kelvedon CPSniveller’s Lane

Reference L/a

For a distance of 157 metres.

Reference L/5

The realigned Sniveller’s Lane, from the new B1024 link road, 570 metres east of the Rivenhall End east roundabout, in a northerly direction, for a distance of 52 metres.

Kelvedon CPEssex Fire and Rescue Service access

Reference L/f

For a distance of 27 metres.

Reference L/3

Essex Fire and Rescue Service access, from the B1024 link road in a southerly direction for a distance of 48 metres.

Kelvedon CPExisting B1024 (London Road)

Reference L/d

For a distance of 125 metres.

Reference L/2

The B1024 link road, from the B1024 Junction with Essex Fire and Rescue access, in an easterly direction for a distance of 141 metres

Kelvedon CPCrane’s Lane

Reference L/c

For a distance of 19 metres.

Reference L/1

The realigned Cranes Lane access from the B1024 link road in a northerly direction, for a distance of 21 metres.

Streets, rights of way and access plans – Sheet No. 12 (and 13)
Kelvedon CPFootpath 92_30From point l/a to point m/a (sheet 13), a distance of 435 metres.437 metres of footpath from point 12/22 to 13/1 (sheet 13).
Sheet No. 13De-trunking and stopping up plansStreets, rights of way and access plans
Great Braxted CP; Kelvedon CPMaldon Road and Highfields Overbridge

Reference M/a

For a distance of 183 metres (excluding the A12 mainline running under the Highfields Overbridge).

Reference M/1

The Highfields overbridge replacement and the realigned Maldon Road, for a distance of 318 metres.

Great Braxted CP; Kelvedon CPHighfields Lane

Reference M/b

For a distance of 475 metres.

Reference M/2

The realigned Highfields Lane, at the southern end of the Highfields overbridge replacement, for a distance of 597 metres.

Streets, rights of way and access plans – Sheet No. 13 (and 14)
Kelvedon CPFootpath 92_26From point m/d to point m/e, a distance of 186 metres as shown on sheet 13.226 metres of footpath from point 13/8 to 13/9.
Kelvedon CPFootpath 92_15From point m/f (inset B) to point n/f (sheet 14), a distance of 109 metres.109 metres of footpath from point 13/11 to 14/13 (sheet 14).
Sheet No. 14 (and 4-13 and 15-19)De-trunking and stopping up plansStreets, rights of way and access plans
Messing-Cum-Inworth CPKelvedon Road

Reference N/a

For a distance of 215 metres.

Reference N/2

The realigned Kelvedon Road, starting at the eastern side of the Inworth roundabout, in an easterly direction for a distance of 90 metres.

Messing-Cum-Inworth CPExisting Inworth Road

Reference N/b

For a distance of 215 metres.

Reference N/11

The realigned south B1023 Kelvedon Road, from the Inworth Roundabout, in a southerly direction for a distance of 304 metres.

Hatfield Peverel CP; Witham CP; Rivenhall CP; Wickham Bishops CP; Great Braxted CP; Messing-Cum-Inworth CP; Feering CP; Marks Tey CP; Copford CPA12 Northbound

Reference N/c

For a distance of 1,355 metres.

Reference D/1 (sheets 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 and 19)

The new A12 mainline northbound carriageway, from at a point 36 metres east of Crix Bridge, in an easterly direction to a point 575 metres east of the Prince of Wales roundabout, a distance of 20,792 metres.

Hatfield Peverel CP; Witham CP; Rivenhall CP; Wickham Bishops CP; Great Braxted CP; Messing-Cum-Inworth CP; Feering CP; Marks Tey CP; Copford CPA12 Southbound

Reference N/d

For a distance of 1,262 metres.

Reference D/2 (sheets 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, and 19)

The new A12 mainline southbound carriageway, from a point 36 metres east of Crix Bridge, in an easterly direction to a point 1,141 metres east of the Prince of Wales roundabout, a distance of 29,103 metres.

Streets, rights of way and access plans – Sheet No. 14
Kelvedon CPFootpath 92_25From point n/a to point n/b, a distance of 353 metres.333 metres of footpath from point 14/2 to 14/3.
Kelvedon CPFootpath 92_41From point n/c to point n/d, a distance of 429 metres.477 metres of footpath from point 14/4 to 14/5.
Kelvedon CPFootpath 145_7From point n/d to point n/e, a distance of 143 metres.477 metres of footpath from point 14/4 to 14/5.
Sheet No. 15 (and 14)De-trunking and stopping up plansStreets, rights of way and access plans
Feering CPExisting A12

Reference O/a

For a distance of 35 metres.

Reference O/5

The realigned London Road, starting at the Feering East roundabout, in a westerly direction, for a distance of 354 metres.

Feering CPExisting A12

Reference O/b

For a distance of 505 metres.

Reference O/5

The realigned London Road, starting at the Feering East roundabout, in a westerly direction, for a distance of 354 metres.

Feering CPNew Lane

Reference O/c

For a distance of 33 metres.

Reference O/3

The realigned New Lane, from the Feering East roundabout, in a northerly direction, for a distance of 46 metres.

Feering CPLondon Road

Reference O/d

For a distance of 92 metres.

Reference O/3

The realigned New Lane, from the Feering East roundabout, in a northerly direction, for a distance of 46 metres.

Messing-Cum-Inworth CPLondon Road

Reference O/e

For a distance of 500 metres (excluding the Nursery Bridge overbridge running over the mainline).

Reference N/10 (sheet 14)

The junction 24 southbound off-slip road, from the southbound diverge, in a westerly direction to the new junction 24 southern roundabout, a distance of 403 metres.

Feering CPLondon Road

Reference O/f

For a distance of 500 metres, as shown on sheet 15 of the de-trunking and stopping up plans.

Reference O/3

The realigned New Lane, from the Feering East roundabout, in a northerly direction, for a distance of 46 metres, as shown on sheet 15 of the streets, rights of way and access plans.

Streets, rights of way and access plans – Sheet No. 15 (and 16)
Feering CPFootpath 78_18From point o/a to point o/b, a distance of 408 metres.

(a) 435 metres of footpath from point 15/1 to 15/2;

(b) 825 metres of cycle track comprised in a highway from point 15/5 to 15/16 (except between point 15/15 and point 15/16 where it constitutes a highway); and

(c)139 metres of footpath from point 15/25 to 15/28.

Feering CP; Copford CPFootpath 78_15From point o/c to point o/d, a distance of 194 metres.1,646 metres of footpath from point 15/29 to 16/2 (sheet 16).
Sheet No. 16De-trunking and stopping up plansStreets, rights of way and access plans
Feering CPA12 northbound

Reference P/a

For a distance of 288 metres.

(a)Reference P/2

The existing A12 from the realigned Easthorpe Road roundabout, in a westerly direction for a distance of 67 metres;

(b)Reference P/1

Easthorpe Road Roundabout, for a distance of 141 metres; and

(c)Reference P/4

The existing A12 from the realigned Easthorpe Road roundabout, in an easterly direction for a distance of 168 metres.

Feering CPA12 southbound

Reference P/b

For a distance of 288 metres.

(a)Reference P/2

The existing A12 from the realigned Easthorpe Road roundabout, in a westerly direction for a distance of 67 metres;

(b)Reference P/1

Easthorpe Road Roundabout, for a distance of 141 metres; and

Reference P/4

The existing A12 from the realigned Easthorpe Road roundabout, in an easterly direction for a distance of 168 metres.

Feering CP; Copford CPEasthorpe Road

Reference P/c

For a distance of 828 metres.

Reference P/3

The realigned Easthorpe Road, starting at the Easthorpe Road roundabout, in a southerly direction, for a distance of 537 metres.

Sheet No. 17De-trunking and stopping up plansStreets, rights of way and access plans
Copford CP; Marks Tey CPExisting A12

Reference Q/a

The existing A12 east of Wishingwell Farm, for a distance of 29 metres.

(a)Reference Q/2

The existing A12 from the Wishingwell Farm roundabout, extending in a westerly direction for a distance of 119 metres;

(b)Reference Q/1

The new Wishingwell Farm roundabout, for a distance of 135 metres; and

(c)Reference Q/5

The existing A12 from the Wishingwell Farm Roundabout, in an easterly direction, for a distance of 161 metres.

Copford CP; Marks Tey CPExisting A12

Reference Q/b

For a distance of 329 metres.

(a)Reference Q/2

The existing A12 from the Wishingwell Farm roundabout, in a westerly direction for a distance of 119 metres;

(b)Reference Q/1

The new Wishingwell Farm roundabout, for a distance of 135 metres;

(c)Reference Q/5

The existing A12 from the Wishingwell Farm Roundabout, in an easterly direction, for a distance of 161 metres.

Copford CP; Marks Tey CPExisting Easthorpe Green Farm Access

Reference Q/c

For a distance of 107 metres.

(a)Reference Q/2

The existing A12 from the Wishingwell Farm roundabout, in a westerly direction for a distance of 119 metres;

(b)Reference Q/1

The new Wishingwell Farm roundabout, for a distance of 135 metres; and

(c)Reference Q/5

The existing A12 from the Wishingwell Farm Roundabout, in an easterly direction, for a distance of 161 metres.

Sheet No. 18De-trunking and stopping up plansStreets, rights of way and access plans
Marks Tey CPExisting A12

Reference R/a

For a distance of 477 metres.

(a)Reference R/4

The existing A12 from the new London Road roundabout in a westerly direction, for a distance of 145 metres;

(b)Reference R/6

The London Road Roundabout for a distance of 160 metres;

(c)Reference R/8

New London Road, from the London Road roundabout, in an easterly direction to the Old Rectory Junction, a distance of 437 metres.

Marks Tey CPExisting A12

Reference R/b

For a distance of 228 metres.

Reference R/9

The realigned Old London Road, from 158 Old London Road, in an easterly direction for a distance of 295 metres.

Marks Tey CPCoggeshall Road

Reference R/c

For a distance of 114 metres.

Reference R/1

The realigned A120 Coggeshall Road, from the Old Rectory Junction in a westerly direction, for a distance of 119 metres.

Marks Tey CPA12 Northbound off-slip road

Reference R/d

For a distance of 173 metres.

Reference R/3

The new junction 25 northbound off-slip road, from the northbound diverge, in an easterly direction to the London Road roundabout, a distance of 376 metres.

Marks Tey CPExisting A12

Reference R/g

For a distance of 342 metres.

(a)Reference R/4

The existing A12 from the new London Road roundabout in a westerly direction, for a distance of 145 metres;

(b)Reference R/6

The London Road Roundabout for a distance of 160 metres;

(c)Reference R/8

New London Road, from the London Road roundabout, in an easterly direction to the Old Rectory Junction, a distance of 437 metres.

Marks Tey CPLondon Road and Coggeshall Road roundabout

Reference R/h

The whole of the roundabout, for a distance of 173 metres, as shown on sheet 17 of the de-trunking and stopping up plans.

Reference R/11 (sheets 18 and 19)

Old Rectory Junction, linking the realigned Old London Road and the realigned A120 Coggeshall Road, for a distance of 41 metres.

Streets, rights of way and access plans – Sheet No. 15
Marks Tey CPFootpath 114_19From point r/a to point r/b for a distance of 169 metres.424 metres of footpath from point 18/7 to 18/9.
Sheet No. 19De-trunking and stopping up plansStreets, rights of way and access plans
Marks Tey CPStation Road

Reference S/a

For a distance of 65 metres.

Reference S/3

The realigned Station Road, form Old Rectory junction, in a northerly direction, for a distance of 57 metres.

Marks Tey CPExisting A120

Reference S/b

For a distance of 40 metres.

Reference S/4

The realigned A120 road, starting at Old Rectory junction, in a north easterly direction for a distance of 116 metres.

Marks Tey CPExisting A120

Reference S/c

For a distance of 40 metres.

Reference S/4

The realigned A120 road, starting at Old Rectory junction, in a north easterly direction for a distance of 116 metres.

PART 3NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED

(1)

Area

(2)

New highway to be provided

Streets, rights of way and access plans – Sheet No. 1
Springfield CP, Boreham CP

Reference A/1

The northbound A12, south of junction 19, from a point 123 metres south of the northbound junction 19 diverge for a distance of 875 metres.

Streets, rights of way and access plans – Sheet No. 2
Boreham CP

Reference B/1 (sheets 1 and 2)

The junction 19 southbound on-slip road, from the Generals Farm roundabout, in a southerly direction for a distance of 474 metres.

Boreham CP

Reference B/2

Generals Farm roundabout, including the internal “hamburger” lanes, for a distance of 252 metres.

Boreham CP

Reference B/3

Boreham Bridge crossing the A12 mainline, linking the Generals Lane roundabout and Generals Farm roundabout, for a distance of 176 metres.

Boreham CP

Reference B/4

The realigned A138 road approach to the Generals Lane roundabout, for a distance of 74 metres.

Boreham CP

Reference B/5

The realigned A138, starting at the Generals Lane roundabout, in a south westerly direction for a distance of 126 metres.

Boreham CP

Reference B/6

A new left turn only lane, linking Boreham Bridge to the realigned A130, from a point 81 metres northwest of the Generals Farm roundabout, for a distance of 82 metres.

Boreham CP

Reference B/7

Generals Lane roundabout, 65 metres northwest of the existing junction 19 northern roundabout, for a distance of 192 metres.

Boreham CP

Reference B/8

A new merge-only lane, bypassing the Generals Lane roundabout, from a point 126 metres south west of the Generals Lane roundabout in a northerly direction to where it merges with the A12 northbound carriageway, for a distance of 924 metres.

Boreham CP

Reference B/9

A new merge-only lane, from the north side of Generals Lane to where it merges with the A12 northbound on-slip road, for a distance of 112 metres.

Boreham CP

Reference B/10

The realigned Beaulieu Park Radial Distributor Road from the northeastern side of the Generals Lane Roundabout, tying into Beaulieu Park radial distributor road, for a distance of 225 metres.

Boreham CP

Reference B/11

The upgraded A12 northbound carriageway, from a point 653 metres northeast of the Generals Lane Roundabout, for a distance of 435 metres.

Boreham CP

Reference B/12

A new junction 19 northbound on-slip road for Beaulieu Park Radial Distributor Road traffic joining the A12 northbound carriageway, from the eastern side of the Generals Lane Roundabout for a distance of 273 metres.

Boreham CP

Reference B/13

The junction 19 southbound off-slip road, starting at the Generals Farm Roundabout, in a northerly direction for a distance of 363 metres.

Boreham CP

Reference B/14

The A12 southbound carriageway, starting 270 metres north of the Generals Farm Roundabout, in a northerly direction for a distance of 569 metres.

Boreham CP

Reference B/15

The realigned B1137 Main Road, from the eastern side of the Generals Farm roundabout in an easterly direction for distance of 236 metres.

Boreham CP

Reference B/16

A new left turn only lane from the realigned Beaulieu Park Radial Distributor Road to the new on-slip joining the A12 northbound carriageway and the widened Boreham Bridge, a distance of 245 metres.

Boreham CP224 metres of cycle track comprised in a highway from point 2/1 to 2/3.
Boreham CP36 metres of cycle track comprised in a highway from point 2/2 to 2/10.
Boreham CP136 metres of cycle track comprised in a highway from point 2/4 to 2/5.
Boreham CP99 metres of cycle track comprised in a highway from point 2/6 to 2/13.
Boreham CP225 metres of footway from point 2/7 to 2/8.
Boreham CP15 metres of footway from point 2/9 to 2/10.
Boreham CP578 metres of bridleway from point 2/11 to 2/12.
Boreham CP130 metres of cycle track comprised in a highway from point 2/14 to 2/15.
Boreham CP39 metres of cycle track comprised in a highway from point 2/16 to 2/17.
Boreham CP63 metres of cycle track comprised in a highway from point 2/18 to 2/19.
Boreham CP15 metres of footway from point 2/20 to 2/21.
Boreham CP44 metres of cycle track comprised in a highway from point 2/22 to 2/23.
Boreham CP6 metres of cycle track comprised in a highway from point 2/24 to 2/25.
Boreham CP31 metres of cycle track comprised in a highway from point 2/26 to 2/27.
Boreham CP14 metres of cycle track comprised in a highway from point 2/28 to 2/29.
Boreham CP17 metres of cycle track comprised in a highway from point 2/30 to 2/31.
Streets, rights of way and access plans – Sheet No. 4 (and 5)
Hatfield Peverel CP; Witham CP; Rivenhall CP; Wickham Bishops CP; Great Braxted CP; Messing-Cum-Inworth CP; Feering CP; Marks Tey CP; Copford CP

Reference D/1 (sheets 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 and 19)

The new A12 mainline northbound carriageway, from at a point 575 metres east of Crix Bridge, in an easterly direction to a point 575 metres east of the Prince of Wales roundabout, a distance of 20,792 metres.

Hatfield Peverel CP; Witham CP; Rivenhall CP; Wickham Bishops CP; Great Braxted CP; Messing-Cum-Inworth CP; Feering CP; Marks Tey CP; Copford CP

Reference D/2

The new A12 mainline southbound carriageway, from a point 36 metres east of Crix Bridge in an easterly direction to a point 1,141 metres east of the Prince of Wales roundabout, a distance of 29,103 metres.

Hatfield Peverel CP365 metres of cycle track comprised in a highway from point 4/1 to 5/1 (sheet 5).
Streets, rights of way and access plans – Sheet No. 5
Hatfield Peverel CP

Reference E/1

The realigned B1137 Main Road, from the River Ter Bridge, in a westerly direction for a distance of 365 metres.

Hatfield Peverel CP

Reference E/2

The Bury Lane overbridge replacement, in the same location, for a distance of 87 metres, as shown on sheet 5 of the streets, rights of way and access plans.

Hatfield Peverel CP

Reference E/3

The Station Road overbridge replacement, in the same location, for a distance of 106 metres.

Hatfield Peverel CP

Reference E4

The Hatfield Peverel Link Road, including the Wellington Road Overbridge Replacement, from the B1137 and Maldon Road junction, crossing the new A12 mainline and extending east to join the new J12 northern roundabout, a distance of 895 metres as shown on sheet 6 of the streets, rights of way and access plans.

Hatfield Peverel CP10 metres of footway from point 5/3 to 5/5.
Hatfield Peverel CP5 metres of footway from point 5/6 to 5/10.
Hatfield Peverel CP4 metres of footway from point 5/7 to 5/11.
Hatfield Peverel CP72 metres of footway from point 5/8 to 5/12.
Hatfield Peverel CP85 metres of cycle track comprised in a highway from point 5/2 to 5/4 (except between point 10/1 and point 10/6 where it constitutes a highway).
Hatfield Peverel CP192 metres of cycle track comprised in a highway from point 5/9 to 6/5 (sheet 6).
Hatfield Peverel CP7 metres of footway from point 5/13 to 5/14.
Hatfield Peverel CP79 metres of footway from point 5/15 to 5/16.
Streets, rights of way and access plans – Sheet No. 6 (and 7)
Hatfield Peverel CP

Reference F/2

The junction 21 southbound off-slip road, from the diverge from the realigned A12 (southbound) to the point where it meets the junction 21 southern roundabout, a distance of 56 metres.

Hatfield Peverel CP

Reference F/3

The realigned Kennel access, from the new junction 21 southern roundabout, in an easterly direction for a distance of 646 metres.

Hatfield Peverel CP

Reference F/4

The junction 21 northbound off-slip road, from the diverge from the realigned A12 (northbound) to the point where it meets the junction 21 northern roundabout, a distance of 370 metres.

Hatfield Peverel CP

Reference F/5

The junction 21 southbound on-slip road, from the junction 21 southern roundabout, in a southerly direction for a distance of 410 metres.

Hatfield Peverel CP

Reference F/6

The junction 21 northern roundabout for a distance of 201 metres.

Hatfield Peverel CP

Reference F/7

The Hatfield Road overbridge for a distance of 97 metres.

Hatfield Peverel CP

Reference F/8

The junction 21 southern roundabout for a distance of 170 metres.

Hatfield Peverel CP

Reference F/9

The junction 21 northbound on-slip road, from the junction 21 northern roundabout in an easterly direction to the point where it merges with the realigned A12 (northbound), a distance of 435 metres.

Hatfield Peverel CP

Reference F/10

The realigned Witham Link Road, starting from the new junction 21 northern roundabout, in an easterly direction for a distance of 499 metres.

Hatfield Peverel CP

Reference F/11

The realigned B1137, from the south side of the Wellington Road overbridge replacement, in an easterly direction for a distance of 31 metres.

Hatfield Peverel CP25 metres of cycle track comprised in a highway from point 6/1 to 6/16.
Hatfield Peverel CP66 metres of footpath from point 6/2 to 6/3.
Hatfield Peverel CP1,058 metres of cycle track comprised in a highway from point 6/4 to 6/20 (except between point 6/4 and point 6/35 where it constitutes a highway).
Hatfield Peverel CP449 metres of footway from point 6/6 to 6/7.
Hatfield Peverel CP33 metres of footway from point 6/8 to 6/9.
Hatfield Peverel CP124 metres of footway from point 6/10 to 6/11.
Hatfield Peverel CP52 metres of footway from point 6/12 to 6/13.
Hatfield Peverel CP40 metres of footway from point 6/14 to 6/15.
Hatfield Peverel CP39 metres of cycle track comprised in a highway from point 6/17 to 6/36.
Witham CP54 metres of cycle track comprised in a highway from point 6/18 to 6/19.
Hatfield Peverel CP216 metres of cycle track comprised in a highway from point 6/21 to 6/31.
Hatfield Peverel CP228 metres of cycle track comprised in a highway from point 6/22 to 6/23.
Hatfield Peverel CP142 metres of cycle track comprised in a highway from point 6/24 to 6/25.
Hatfield Peverel CP771 metres of cycle track comprised in a highway from point 6/26 to 6/27 (except between point 6/6 and point 6/7 where it constitutes a highway).
Hatfield Peverel CP9 metres of footway from point 6/28 to 6/29.
Hatfield Peverel CP; Witham CP125 metres of footpath from point 6/30 to 7/1 (sheet 7).
Hatfield Peverel CP5 metres of footway from point 6/32 to 6/33.
Hatfield Peverel CP164 metres of footway from point 6/34 to 6/35.
Streets, rights of way and access plans – Sheet No. 7
Witham CP

Reference G/1

The new Howbridge Hall Road, from a point 357 metres north of the start of the existing Howbridge Hall Road in a westerly direction, for a distance of 39 metres, as shown on sheet 7 of the streets, rights of way and access plans.

Streets, rights of way and access plans – Sheet No. 8
Witham CP579 metres of footpath from point 8/1 to 8/4
Witham CP158 metres of footpath from point 8/2 to 8/3
Streets, rights of way and access plans – Sheet No. 9
Rivenhall CP587 metres of footpath from point 9/1 to 10/27 (sheet 10).
Streets, rights of way and access plans – Sheet No. 10
Witham CP

Reference J/1

The realigned Eastways, from the north side of the Eastways Junction, for a distance of 31 metres.

Rivenhall CP

Reference J/2

The upgraded Eastways Junction, at the same location as the existing junction, for a distance of 35 metres.

Rivenhall CP

Reference J/3

The realigned Little Braxted Lane, including access to Colemans Quarry, from the junction 22 southern roundabout, in a westerly and then southerly direction for a distance of 544 metres.

Rivenhall CP

Reference J/4

The road between the Eastways junction and the junction 22 northern roundabout, a distance of 508 metres.

Rivenhall CP

Reference J/5

The junction 22 northbound off-slip road, from the A12 mainline northbound diverge, in an easterly direction to the new junction 22 northern roundabout, a distance of 492 metres.

Rivenhall CP

Reference J/6

The junction 22 southbound on-slip road, from the junction 22 southern roundabout, in a westerly direction to its merge with the A12 mainline southbound, a distance of 466 metres.

Rivenhall CP

Reference J/7

The junction 22 northern roundabout for a distance of 207 metres.

Rivenhall CP

Reference J/8

The Little Braxted Lane overbridge, connecting the junction 22 northern roundabout and the junction 22 southern roundabout, a distance of 103 metres.

Witham CP

Reference J/9

The realigned Colchester Road, from the Eastways Junction, in a westerly direction for a distance of 87 metres.

Rivenhall CP

Reference J/10

The junction 22 southern roundabout for a distance of 207 metres.

Rivenhall CP

Reference J/11

The junction 22 northbound on-slip road, from the junction 22 northern roundabout, in an easterly direction to merge with the new A12 northbound carriageway, a distance of 444 metres.

Rivenhall CP

Reference J/12

The junction 22 southbound off-slip road, from the A12 mainline southbound diverge, in a westerly direction to the new junction 22 southern roundabout, a distance of 544 metres.

Rivenhall CP

Reference J/13

The existing A12 , from the new junction 22 northern roundabout, in an easterly direction for a distance of 311 metres.

Rivenhall CP

Reference J/14

The realigned Coleman’s Bridge Trade Park access road, from the Eastways Junction in a southerly direction for a distance of 22 metres.

Witham CP, Rivenhall CP818 metres of cycle track comprised in a highway from point 10/1 to 10/2 (except between point 10/1 and point 10/6 where it constitutes a highway).
Rivenhall CP141 metres of cycle track comprised in a highway from point 10/3 to 10/4.
Rivenhall CP28 metres of cycle track comprised in a highway from point 10/5 to 10/8.
Rivenhall CP15 metres of cycle track comprised in a highway from point 10/6 to 10/7.
Rivenhall CP727 metres of cycle track comprised in a highway from point 10/9 to 10/10 (except between point 10/15 and point 10/16 where it constitutes a highway).
Rivenhall CP199 metres of footway from point 10/11 to 10/12.
Rivenhall CP19 metres of footway from point 10/13 to 10/14.
Rivenhall CP262 metres of footway from point 10/15 to 10/16.
Rivenhall CP103 metres of cycle track comprised in a highway from point 10/17 to 10/24.
Rivenhall CP5 metres of footway from point 10/18 to 10/19.
Rivenhall CP130 metres of footway from point 10/20 to 10/21.
Rivenhall CP17 metres of cycle track comprised in a highway from point 10/22 to 10/23.
Rivenhall CP6 metres of cycle track comprised in a highway from point 10/25 to 10/26.
Rivenhall CP11 metres of cycle track constituting a highway from point 10/28 to 10/29.
Rivenhall CP8 metres of footway from point 10/30 to 10/31.
Streets, rights of way and access plans – Sheet No. 11 (and 12)
Rivenhall CP; Kelvedon CP

Reference K/1 (sheets 11 and 12)

The new B1024 Link Road, from the new Rivenhall End east roundabout, in an easterly direction to the B1024 junction with Essex Fire and Rescue access, a distance of 1,297 metres.

Rivenhall CP

Reference K/2

The new Rivenhall End east roundabout for a distance of 148 metres.

Rivenhall CP

Reference K/3

The existing A12 from the new Rivenhall End east roundabout, in a westerly direction for a distance of 73 metres.

Rivenhall CP

Reference K/4

The existing A12 from the Rivenhall End west roundabout, in a westerly direction for a distance of 117 metres.

Rivenhall CP

Reference K/5

The new Rivenhall End west roundabout for a distance of 119 metres.

Rivenhall CP

Reference K/6

The realigned Braxted Road, from the Rivenhall End west roundabout, in a southerly direction for a distance of 519 metres.

Rivenhall CP

Reference K/7

The southern realigned Rivenhall access, from the existing A12, 123 metres east of the new Rivenhall End west roundabout, in a southerly direction for a distance of 39 metres.

Rivenhall CP

Reference K/8

The realigned Oak Road, from the existing A12, 116 metres east of the new Rivenhall End west roundabout, in a northerly direction for a distance of 16 metres.

Rivenhall CP

Reference K/9

The northern realigned Henry Dixon Road, from the realigned Braxted Road, 109 metres south of the Rivenhall End west roundabout, in an easterly direction for a distance of 252 metres.

Rivenhall CP

Reference K/10

The southern realigned Henry Dixon Road, from the realigned Braxted Road, 447 metres south of the new Rivenhall End west roundabout, in a northerly direction, for a distance of 81 metres.

Rivenhall CP

Reference K/11

The realigned access road, from the existing Henry Dixon Road south of the A12 mainline, for a distance of 136 metres.

Rivenhall CP

Reference K/12

The existing A12, from the new Rivenhall End west roundabout, in an easterly direction for a distance of 206 metres.

Rivenhall CP141 metres of cycle track comprised in a highway from point 11/1 to 11/9.
Rivenhall137 metres of cycle track comprised in a highway from point 11/2 to 11/29
Rivenhall CP27 metres of cycle track comprised in a highway from point 11/3 to 11/4.
Rivenhall CP40 metres of cycle track comprised in a highway from point 11/5 to 11/6.
Rivenhall CP44 metres of cycle track comprised in a highway from point 11/7 to 11/8.
Rivenhall CP52 metres of footway from point 11/7 to 11/30.
Rivenhall CP155 metres of cycle track comprised in a highway from point 11/10 to 11/11.
Rivenhall CP162 metres of footway from point 11/10 to 11/31.
Rivenhall CP57 metres of cycle track comprised in a highway from point 11/12 to 11/25.
Rivenhall CP84 metres of footway from point 11/13 to 11/32.
Rivenhall CP138 metres of footway from point 11/14 to 11/26.
Rivenhall CP91 metres of footway from point 11/15 to 11/27.
Rivenhall CP8 metres of cycle track comprised in a highway from point 11/16 to 11/17.
Rivenhall CP58 metres of footway from point 11/18 to 11/19.
Rivenhall CP108 metres of cycle track comprised in a highway from point 11/20 to 11/33.
Rivenhall CP92 metres of footpath from point 11/21 to 11/22.
Rivenhall CP; Kelvedon CP563 metres of footpath from point 11/23 to 12/1 (sheet 12).
Rivenhall CP77 metres of cycle track comprised in a highway from point 11/24 to 11/28
Rivenhall CP533 metres of cycle track comprised in a highway from point 11/34, 158 metres west of point k/c to 12/25, to 12/25 (sheet 12).
Streets, rights of way and access plans – Sheet No. 12 (and 13)
Kelvedon CP

Reference L/1

The realigned Cranes Lane access from the B1024 link road in a northerly direction, for a distance of 21 metres.

Kelvedon CP

Reference L/2

The B1024 link road, from the B1024 Junction with Essex Fire and Rescue access, in an easterly direction for a distance of 141 metres.

Kelvedon CP

Reference L/3

Essex Fire and Rescue Service access, from the B1024 link road in a southerly direction for a distance of 48 metres.

Kelvedon CP

Reference L/4

Essex Fire and Rescue Access Road, adjacent to the A12 southbound carriageway, for a distance of 720 metres.

Kelvedon CP

Reference L/5

The realigned Sniveller’s Lane, from the new B1024 link road, 570 metres east of the Rivenhall End east roundabout, in a northerly direction, for a distance of 52 metres.

Kelvedon CP17 metres of footway from point 12/1 to 12/2.
Kelvedon CP49 metres of footway from point 12/3 to 12/4.
Kelvedon CP31 metres of footpath from point 12/5 to 12/6.
Kelvedon CP52 metres of cycle track comprised in a highway from point 12/5 to 12/7.
Kelvedon CP104 metres of footway from point 12/8 to 12/9.
Kelvedon CP38 metres of cycle track comprised in a highway from point 12/9 to 12/10.
Kelvedon CP453 metres of cycle track constituting a highway from point 12/10 to 12/11.
Kelvedon CP567 metres of footway from point 12/10 to 12/16.
Kelvedon CP153 metres of footway from point 12/11 to 12/15.
Kelvedon CP135 metres of cycle track comprised in a highway from point 12/12 to 12/19.
Kelvedon CP740 metres of cycle track comprised in a highway from point 12/13 to 12/23.
Kelvedon CP67 metres of cycle track comprised in a highway from point 12/14 to 12/24.
Kelvedon CP53 metres of footway from point 12/17 to 12/18.
Kelvedon CP58 metres of cycle track comprised in a highway from point 12/18 to 12/21.
Kelvedon CP96 metres of footway from point 12/20 to 12/22
Kelvedon CP437 metres of footpath from point 12/22 to 13/1 (sheet 13).
Streets, rights of way and access plans – Sheet No. 13 (and 14)
Great Braxted CP; Kelvedon CP

Reference M/1

The Highfields overbridge replacement and the realigned Maldon Road, for a distance of 318 metres.

Great Braxted CP; Kelvedon CP

Reference M/2

The realigned Highfields Lane, at the southern end of the Highfields overbridge replacement, for a distance of 597 metres.

Great Braxted CP150 metres of cycle track comprised in a highway from point 13/2 to 13/4.
Great Braxted CP; Kelvedon CP324 metres of cycle track comprised in a highway from point 13/3 to 13/5.
Great Braxted, Kelvedon CP324 metres of cycle track comprised in a highway from point 13/6 to 13/7
Kelvedon CP226 metres of footpath from point 13/8 to 13/9.
Kelvedon CP101 metres of cycle track comprised in a highway from point 13/12 to 13/13.
Kelvedon109 metres of footpath from point 13/11 to 14/13 (sheet 14).
Kelvedon689 metres of footpath from point 13/10 to 14/1 (sheet 14)
Streets, rights of way and access plans – Sheet No. 14
Messing-Cum-Inworth CP

Reference N/1

Not used.

Messing-Cum-Inworth CP

Reference N/2

The realigned Kelvedon Road, starting at the eastern side of the Inworth roundabout, in an easterly direction for a distance of 90 metres.

Kelvedon CP; Messing-Cum-Inworth CP

Reference N/3 (sheet 13 and 14)

The new junction 24 northbound off-slip road, from the northbound diverge from the A12 mainline, in an easterly direction to the junction 24 northern roundabout, for a distance of 553 metres.

Kelvedon CP; Messing-Cum-Inworth CP

Reference N/4

The new junction 24 southbound on-slip road, starting at the junction 24 southern roundabout, in a westerly direction to the point where it merges with the A12 mainline, a distance of 522 metres.

Messing-Cum-Inworth CP

Reference N/5

The new junction 24 northern roundabout for a distance of 254 metres.

Messing-Cum-Inworth CP

Reference N/6

The new junction 24 underbridge, connecting the junction 24 northern roundabout and the junction 24 southern roundabout, a distance of 165 metres.

Messing-Cum-Inworth CP

Reference N/7

The realigned north B1023 Kelvedon Road, from the Inworth roundabout, in a northerly direction for a distance of 80 metres.

Kelvedon CP; Messing-Cum-Inworth CP

Reference N/8

The new junction 24 southern roundabout for a distance of 254 metres.

Messing-Cum-Inworth CP

Reference N/9

The new junction 24 northbound on-slip road, from the junction 24 northern roundabout, in an easterly direction to the point where it merges with the A12 mainline, a distance of 414 metres.

Messing-Cum-Inworth CP

Reference N/10

The junction 24 southbound off-slip road, from the southbound diverge, in a westerly direction to the new junction 24 southern roundabout, a distance of 403 metres.

Messing-Cum-Inworth CP

Reference N/11

The realigned south B1023 Kelvedon Road, from the Inworth roundabout, in a southerly direction for a distance of 304 metres.

Messing-Cum-Inworth CP

Reference N/12

The Inworth roundabout for a distance of 126 metres.

Messing-Cum-Inworth CP

Reference N/13

The new Inworth link, starting at the junction 24 southern roundabout, in an easterly direction for a distance of 474 metres.

Kelvedon CP333 metres of footpath from point 14/2 to 14/3.
Kelvedon CP477 metres of footpath from point 14/4 to 14/5.
Messing-Cum-Inworth CP69 metres of cycle track constituting a highway from point 14/6 to 14/7.
Messing-Cum-Inworth CP71 metres of cycle track constituting a highway from point 14/8 to 14/9.
Messing-Cum-Inworth CP25 metres of cycle track constituting a highway from point 14/10 to 14/11.
Streets, rights of way and access plans – Sheet Nos. 14 to 21

Messing-Cum-Inworth CP

Feering CP

771 metres of footpath from point 14/12 to 21/1 (sheet 21)
Streets, rights of way and access plans – Sheet No. 15
Feering CP

Reference O/1

The existing A12 , from the Feering east roundabout, in an easterly direction for a distance of 126 metres.

Feering CP

Reference O/2

The Feering East roundabout for a distance of 173 metres.

Feering CP

Reference O/3

The realigned New Lane, from the Feering East roundabout, in a northerly direction, for a distance of 46 metres.

Feering CP

Reference O/4

The realigned Prested Hall access road, from the realigned London Road, in a south easterly direction for a distance of 772 metres.

Feering CP

Reference O/5

The realigned London Road, starting at the Feering East roundabout, in a south westerly direction, for a distance of 354 metres.

Feering CP

Reference O/6

A new road providing access to properties north of the A12, from the new Feering east roundabout, in an easterly direction for a distance of 69 metres.

Feering CP435 metres of footpath from point 15/1 to 15/2.
Feering CP14 metres of footway from point 15/3 to 15/4.
Feering CP825 metres of cycle track comprised in a highway from point 15/5 to 15/16 (except between point 15/15 and point 15/16 where it constitutes a highway).
Feering CP92 metres of footway from point 15/6 to 15/8.
Feering CP100 metres of cycle track comprised in a highway from point 15/7 to 15/21.
Feering CP7 metres of cycle track comprised in a highway from point 15/9 to 15/22.
Feering CP220 metres of footway from point 15/10 to 15/15.
Feering CP89 metres of footway from point 15/11 to 15/12.
Feering CP15 metres of footway from point 15/13 to 15/31.
Feering CP183 metres of cycle track comprised in a highway from point 15/14 to 15/31.
Feering CP37 metres of cycle track comprised in a highway from point 15/17 to 15/30.
Feering CP121 metres of footway from point 15/18 to 15/30.
Feering CP64 metres of cycle track comprised in a highway from point 15/19 to 15/20.
Feering CP387 metres of cycle track comprised in a highway from point 15/23 to 15/24.
Feering CP139 metres of footpath from point 15/25 to 15/28.
Feering CP69 metres of footpath from point 15/26 to 15/27.
Feering CP; Copford CP1,646 metres of footpath from point 15/29 to 16/2 (sheet 16).
Feering CP204 metres of footpath from point 15/32 to 15/33
Feering CP37 metres of cycle track comprised in a highway from point 15/34 to 15/35.
Streets, rights of way and access plans – Sheet No. 16
Feering CP

Reference P/1

Easthorpe Road roundabout, for a distance of 141 metres.

Feering CP

Reference P/2

The existing A12 from the realigned Easthorpe Road roundabout, in a westerly direction for a distance of 67 metres.

Feering CP; Copford CP

Reference P/3

The realigned Easthorpe Road, starting at the Easthorpe Road roundabout, in a southerly direction, for a distance of 537 metres.

Feering CP; Copford CP

Reference P/4

The existing A12 from the realigned Easthorpe Road roundabout, in an easterly direction for a distance of 168 metres.

Feering CP

Reference P/5

The realigned New Lane from the new Feering east roundabout, in a northerly direction for a distance of 17 metres.

Copford CP39 metres of footway from point 16/1 to 16/14.
Copford CP126 metres of footway from point 16/3 to 16/9.
Copford CP; Feering CP387 metres of footway from point 16/4 to 16/10.
Feering CP; Copford CP105 metres of cycle track comprised in a highway from point 16/5 to 16/6.
Feering CP; Copford CP203 metres of cycle track comprised in a highway from point 16/7 to 16/8.
Feering CP2 metres of footway from point 16/11 to 16/12.
Streets, rights of way and access plans – Sheet No. 17
Copford CP; Marks Tey CP

Reference Q/1

The new Wishingwell Farm roundabout, for a distance of 135 metres.

Copford CP; Marks Tey CP

Reference Q/2

The existing A12 from the Wishingwell Farm roundabout, in a westerly direction for a distance of 119 metres.

Copford CP; Marks Tey CP

Reference Q/3 (sheet 17 and 18)

The realigned Easthorpe Green access road, from the southern end of the Wishingwell Bridge road, for a distance of 800 metres.

Copford CP; Marks Tey CP

Reference Q/4

The new Wishingwell Bridge road, from the new Wishingwell Farm Roundabout in a southerly direction to the realigned Easthorpe Green access road, a distance of 256 metres, as shown on sheet 17 and 18 of the streets, rights of way and access plans.

Copford CP; Marks Tey CP

Reference Q/5

The existing A12 from the Wishingwell Farm Roundabout, in an easterly direction, for a distance of 161 metres.

Copford CP; Marks Tey CP617 metres of footway from point 17/1 to 18/1 (sheet 18).
Copford CP; Marks Tey CP97 metres of footway from point 17/2 to 17/3.
Marks Tey CP202 metres of cycle track comprised in a highway from point 17/4 to 17/5.
Marks Tey CP126 metres of cycle track comprised in a highway from point 17/6 to 17/7.
Marks Tey CP5 metres of footway from point 17/8 to 17/9.
Copford CP114 metres of footway from point 17/10 to 17/11.
Copford CP; Marks Tey CP204 metres of footway from point 17/12 to 17/13.
Streets, rights of way and access plans – Sheet No. 18 (and 19)
Marks Tey CP

Reference R/1

The realigned A120 Coggeshall Road, from the Old Rectory Junction in a westerly direction, for a distance of 119 metres.

Marks Tey CP

Reference R/2

The realigned London Road, from the Hall Chase roundabout in an easterly direction, for a distance of 102 metres.

Marks Tey CP

Reference R/3

The new junction 25 northbound off-slip road, from the northbound diverge, in an easterly direction to the London Road roundabout, a distance of 376 metres.

Marks Tey CP

Reference R/4

The existing A12 from the new London Road roundabout in a westerly direction, for a distance of 145 metres.

Marks Tey CP

Reference R/5

The new Hall Chase Roundabout, a distance of 66 metres.

Marks Tey CP

Reference R/6

The London Road Roundabout for a distance of 160 metres.

Marks Tey CP

Reference R/7

The realigned Old London Road access from the London Road roundabout, in a northerly direction for a distance of 25 metres.

Marks Tey CP

Reference R/8

New London Road, from the London Road roundabout, in an easterly direction to the Old Rectory Junction, a distance of 423 metres.

Marks Tey CP

Reference R/9

The realigned Old London Road, from 158 Old London Road, in an easterly direction for a distance of 295 metres.

Marks Tey CP

Reference R/10

The junction 25 southbound on-slip road, from the Hall Chase roundabout, in a southerly direction to the point where it merges with the A12, a distance of 438 metres.

Marks Tey CP

Reference R/11

Old Rectory Junction, linking the realigned Old London Road and the realigned A120 Coggeshall Road, for a distance of 154 metres, as shown on sheets 18 and 19 of the streets, rights of way and access plans.

Marks Tey CP16 metres of footpath from point 18/2 to 18/8.
Copford CP; Marks Tey CP1,270 metres of cycle track constituting a highway from point 18/3 to 18/13.
Marks Tey CP430 metres of cycle track comprised in a highway from point 18/4 to 19/8 (sheet 19).
Marks Tey CP75 metres of cycle track comprised in a highway from point 18/5 to 19/7 (sheet 19).
Marks Tey CP54 metres of cycle track comprised in a highway from point 18/6 to 18/15.
Marks Tey CP424 metres of footpath from point 18/7 to 18/9.
Marks Tey CP15 metres of cycle track comprised in a highway from point 18/10 to 18/11.
Marks Tey CP135 metres of footway from point 18/12 to 18/17.
Marks Tey CP6 metres of footway from point 18/14 to 18/19.
Marks Tey CP93 metres of cycle track constituting a highway from point 18/16 to 18/33
Marks Tey CP34 metres of cycle track comprised in a highway from point 18/18 to 18/21.
Marks Tey CP66 metres of footway from point 18/20 to 18/32.
Marks Tey CP5 metres of footway from point 18/22 to 18/23.
Marks Tey CP58 metres of footway from point 18/24 to 18/25.
Marks Tey CP22 metres of cycle track comprised in a highway from point 18/26 to 18/27.
Marks Tey CP51 metres of footway from point 18/28 to 18/29.
Marks Tey CP57 metres of footway from point 18/30 to 18/31.
Marks Tey CP179 metres of cycle track comprised in a highway from point 18/34 to 18/35.
Marks Tey CP33 metres of cycle track comprised in a highway from point 18/36 to 18/37.
Marks Tey CP56 metres of footway from point 18/38 to 18/39.
Streets, rights of way and access plans – Sheet No. 19
Marks Tey CP

Reference S/1

The junction 25 northbound on-slip road, from a point 82 metres east of Marks Tey Station, in an easterly direction to the point where it merges with the A12, a distance of 470 metres.

Marks Tey CP

Reference S/2

The junction 25 southbound off-slip road, from its diverge from the A12, in an easterly direction to the Prince of Wales roundabout, a distance of 647 metres.

Marks Tey CP

Reference S/3

The realigned Station Road, form Old Rectory junction, in a northerly direction, for a distance of 57 metres.

Marks Tey CP

Reference S/4

The realigned A120 road, starting at Old Rectory junction, in a north easterly direction for a distance of 116 metres, as shown on sheet 19 of the streets, rights of way and access plans.

Marks Tey CP22 metres of cycle track comprised in a highway from point 19/1 to 19/2.
Marks Tey CP126 metres of footway from point 19/3 to 19/9.
Marks Tey CP79 metres of cycle track comprised in a highway from point 19/4 to 19/9.
Marks Tey CP10 metres of cycle track comprised in a highway from point 19/5 to 19/6.
Streets, rights of way and access plans – Sheet No. 20
Messing-Cum-Inworth CP

Reference T/1

The widened B1023 Kelvedon Road, from a point 330 metres south of the Inworth Road roundabout, in a southerly direction for a distance of 218 metres.

Messing-Cum-Inworth CP

Reference T/3

The widened B1023 Kelvedon Road, from a point 736 metres south of the Inworth Road roundabout, in a southerly direction for a distance of 201 metres.

Messing-cum-Inworth CP97 metres of footway from point 20/1 to 20/2.
Messing-cum-Inworth CP41 metres of footway from point 20/3 to 20/4.

PART 4PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Private means of access to be stopped

(3)

Extent of stopping up

(4)

New private means of access to be substituted or provided

Streets, Rights of Way and Access Plans – Sheet 5
Hatfield Peverel CP

Reference 5/a

The private means of access to land between the A12 northbound and the junction 20A northbound off-slip road.

For a distance of 9 metres.

Reference 5/F

New private means of access to attenuation pond and fields north and south of the existing junction 20A northbound off-slip road, starting at Bury Lane, for a distance of 591 metres.

Streets, Rights of Way and Access Plans – Sheet 6
Hatfield Peverel CP

Reference 6/f

The private means of access to the telecommunications mast from the existing junction 20B northbound on-slip road.

For a distance of 9 metres.

Reference 6/D

New private means of access to the telecommunications mast from the south side of the new Hatfield Peverel link road, northeast of the Wellington Road overbridge replacement, for a distance of 55 metres.

Hatfield Peverel CP

Reference 6/a

The private means of access to land from the northbound carriageway of the A12.

For a distance of 9 metres

Reference 6/G (inset A)

New private means of access to attenuation pond and other land, from the north side of the new Hatfield Peverel link road, 308 metres west of the new junction 21 northern roundabout, for a distance of 98 metres.

Hatfield Peverel CP

Reference 6/b

The private means of access to land from the northbound carriageway of the A12.

For a distance of 7 metres.

Reference 6/G (inset A)

New private means of access to attenuation pond and other land, from the north side of the new Hatfield Peverel link road, 308 metres west of the new junction 21 northern roundabout, for a distance of 98 metres.

Hatfield Peverel CP

Reference 6/e

The private means of access to land to the west of Mayfield Cottages from the realigned Witham link road.

For a distance of 2 metres.

Reference 6/K

New private means of access to attenuation pond and land to the west of Mayfield Cottages from the realigned Witham link road, 420 metres east of the new junction 21 northern roundabout, for a distance of 57 metres.

Streets, Rights of Way and Access Plans – Sheet 7
Witham CP

Reference 7/a

The private means of access to Dengie Farm from Howbridge Hall Road.

For a distance of 302 metres.

Reference 7/B

New private means of access to Dengie Farm from Howbridge Hall Road, for a distance of 815 metres.

Streets, Rights of Way and Access Plans – Sheet 10
Rivenhall CP

Reference 10/a (partly shown on inset A)

The private means of access to land north of the existing A12 northbound carriageway.

For a distance of 3 metres each.

Reference 10/E

New private means of access to land north of the existing A12 from northern side of the existing A12, 140 metres east of the new junction 22 northern roundabout, for a distance of 8 metres.

Rivenhall CP

Reference 10/b

The private means of access to land north of the existing A12 from the existing A12 northbound carriageway.

For a distance of 3 metres each.

Reference 10/E

New private means of access to land north of the existing A12 from northern side of the existing A12 , 140 metres east of the new junction 22 northern roundabout, for a distance of 8 metres.

Streets, Rights of Way and Access Plans – Sheet 13
Great Braxted CP

Reference 13/a

The private means of access to land north of Highfields Lane.

For a distance of 8 metres.

Reference 13/B

New private means of access Lane, 211 metres west of the new Highfields overbridge replacement, for a distance of 23 metres.

Streets, Rights of Way and Access Plans – Sheet 14
Kelvedon CP, Feering CP

Reference 14/b (Inset A)

The private means of access across the existing Ewell Hall Chase Bridge.

For a distance of 258 metres.

Reference 14/M (inset B)

New private means of access to attenuation pond north of the A12 mainline and other land, from the existing Ewell Hall Chase, for a distance of 776 metres.

Streets, Rights of Way and Access Plans – Sheet 15
Feering CP

Reference 15/a (inset A)

The private means of access to Threshelfords Farm across the existing Threshelfords Bridge.

For a distance of 219 metre.

Reference 15/A

New private means of access to Threshelfords Farm from the realigned Threshelfords access road, for a distance of 449 metres.

Feering CP

Reference 15/b

The private means of access to Prested Hall from the south side of the B1024.

For a distance of 204 metres, as shown on sheet 15.

Reference 15/D

New private means of access to Prested Hall ecological mitigation area and other land south of the A12, from the east side of new Prested Hall Overbridge, for a distance of 328 metres.

Streets, Rights of Way and Access Plans – Sheet 16
Feering CP

Reference 16/a

The Gypsy Lane private means of access from the existing Easthorpe Road.

For a distance of 36 metres.

Reference 16/A (insets A and B)

New private means of access to attenuation pond south of the A12 and Gypsy Lane from the realigned Easthorpe Road, for a distance of 637 metres.

Copford CP

Reference 16/b

The private means of access to Colchester Model Car Club and other land from the existing Easthorpe Road.

For a distance of 20 metres.

Reference 16/C

New private means of access to Colchester Model Car Club and the attenuation pond between the existing A12 and the new A12, 81 metres east of the Easthorpe Road roundabout, for a distance of 113 metres.

Copford CP

Reference 16/b

The private means of access to Colchester Model Car Club and other land from the existing Easthorpe Road.

For a distance of 20 metres.

Reference 16/E

New private means of access to Colchester Model Car Club and other land from the realigned Easthorpe Road, for a distance of 27 metres.

Streets, Rights of Way and Access Plans – Sheet 18
Marks Tey CP

Reference 18/a

The Wishingwell Farm private means of access, running under the new A12 mainline.

For a distance of 84 metres.

Reference 17/G (sheets 17 and 18)

New private means of access to attenuation pond and land south of the new A12 from the eastern end of the new Wishingwell access road, 398 metres southeast of the new Wishingwell overbridge, for a distance of 164 metres.

Marks Tey CP

Reference 18/b

The Hall Chase private means of access.

For a distance of 76 metres.

Reference 18/D

New private means of access to Hall Chase from the Hall Chase Roundabout, for a distance of 146 metres.

PART 5NEW PRIVATE MEANS OF ACCESS WHICH ARE TO BE PROVIDED

(1)

Area

(2)

New private means of access to be provided

Streets, Rights of Way and Access Plans – Sheet 1 (and 2)
Springfield CP, Boreham CP

Reference 1/A

New private means of access to Cheese House, Chelmsford Car Boot Sale land, attenuation pond and other land, from the south side of Generals Farm roundabout (sheet 2) in a westerly direction for a distance of 1,505 metres.

Boreham CP

Reference 1/B

New private means of access to attenuation pond from reference 1/A, in an easterly direction for a distance of 308 metres.

Boreham CP

Reference 1/C

New private means of access linking land to reference 1/B, for a distance of 85 metres.

Streets, Rights of Way and Access Plans – Sheet 2
Boreham CP

Reference 2/A

New private means of access to Boreham House from the south side of Main Road, 120 metres north-east of Generals Farm roundabout, for a distance of 13 metres.

Boreham CP

Reference 2/B

New private means of access to Boreham House from the south side of Main Road, 170 metres north-east of Generals Farm roundabout, for a distance of 19 metres.

Boreham CP

Reference 2/C

New private means of access to Premier Inn Chelmsford (Boreham) from the north side of Main Road, 230 metres north-east of Generals Farm roundabout, for a distance of 28 metres.

Boreham CP

Reference 2/D

New private means of access to land from the south side of Main Road, 250 metres north-east of Generals Farm roundabout, for a distance of 33 metres.

Boreham CP

Reference 2/E (inset A)

New private means of access to properties along Paynes Lane and other land from the north side of Main Road, 234 metres north-east of Generals Farm roundabout, for a distance of 244 metres.

Boreham CP

Reference 2/F

New private means of access to land north of the B1137 Main Road for a distance of 4 metres.

Boreham CP

Reference 2/G

New private means of access to the attenuation pond from the north side of Main Road, 618 metres north-east of Generals Farm Roundabout, for a distance of 97 metres.

Boreham CP

Reference 2/H

New private means of access to land north of Main Road, 712 metres north-east of Generals Farm roundabout, for a distance of 2 metres.

Boreham CP

Reference 2/I

Not used.

Boreham CP

Reference 2/J

New private means of access to the attenuation pond from the north side of the junction 19 northbound on-slip road, for a distance of 20 metres.

Streets, Rights of Way and Access Plans – Sheet 5
Hatfield Peverel CP

Reference 5/A

New private means of access to land west of Millfield Cottages from the south side of realigned B1137Main Road, opposite the existing junction 20A southbound on-slip road, for a distance of 6 metres.

Hatfield Peverel CP

Reference 5/B

New private means of access to attenuation pond from the south side of the realigned B1137 Main Road, 25 metres east of the existing junction 20A southbound on-slip road, for a distance of 284 metres.

Hatfield Peverel CP

Reference 5/C

New private means of access to land northwest of Millfield Cottages from the south side of realigned B1137 Main Road, 138 metres east of the existing junction 20A southbound on-slip road, for a distance of 8 metres.

Hatfield Peverel CP

Reference 5/D

New private means of access to Millfield Cottages from the south side of realigned B1137 Main Road, 145 metres east of the existing junction 20A southbound on-slip road, for a distance of 8 metres.

Hatfield Peverel CP

Reference 5/E (inset B)

New private means of access to Primrose Cottage, from the east side of Station Road, south of the Station Road bridge, for a distance of 6 metres.

Hatfield Peverel CP

Reference 5/F

New private means of access to attenuation pond and fields north and south of the existing junction 20A northbound off-slip road, starting at Bury Lane, for a distance of 591 metres.

Hatfield Peverel CP

Reference 5/G

New private means of access to The Bungalow from the west side of Bury Lane, south of the Bury Lane overbridge replacement, for a distance of 9 metres.

Hatfield Peverel CP

Reference 5/H

New private means of access to Moorings from the east side of Bury Lane, south of the Bury Lane overbridge replacement, for a distance of 4 metres.

Hatfield Peverel CP

Reference 5/I (inset B)

New private means of access to Kinsby House, from the west side of Station Road, south of the Station Road overbridge replacement, for a distance of 2 metres.

Hatfield Peverel CP

Reference 5/J (inset B)

New private means of access to White Gables, from the west side of Station Road, north of the Station Road overbridge replacement, for a distance of 3 metres.

Hatfield Peverel CP

Reference 5/K (inset B)

New private means of access to Springfield Lodge, from the east side of Station Road, north of the Station Road overbridge replacement, for a distance of 2 metres.

Hatfield Peverel CP

Reference 5/L (inset B)

New private means of access to High Clere, from the west side of Station Road, north of the Station Road overbridge replacement, for a distance of 2 metres.

Hatfield Peverel CP

Reference 5/M (inset B)

New private means of access to Crofton, from the east side of Station Road, north of the Station Road overbridge replacement, for a distance of 6 metres.

Streets, Rights of Way and Access Plans – Sheet 6 (and 5)
Hatfield Peverel CP

Reference 6/A (sheets 5 and 6)

New private means of access to Ruslings from the B1137, southwest of the Wellington Road overbridge replacement, for a distance of 2 metres.

Hatfield Peverel CP

Reference 6/B

New private means of access to Tudor Lodge from the B1137, south of the Wellington Road overbridge replacement, for a distance of 2 metres.

Hatfield Peverel CP

Reference 6/C

New private means of access to Rock Cottage, the Vineyards and Vineyard Cottage from the north side of the new Hatfield Peverel link road, northeast of the Wellington Road overbridge replacement, for a distance of 8 metres.

Hatfield Peverel CP

Reference 6/D

New private means of access to the telecommunications mast from the south side of the new Hatfield Peverel link road, northeast of the Wellington Road overbridge replacement, for a distance of 55 metres.

Hatfield Peverel CP

Reference 6/F

New private means of access to attenuation pond and Witham Farm fields north of the new Hatfield Peverel link road, 511 metres west of the new junction 21 northern roundabout, for a distance of 86 metres.

Hatfield Peverel CP

Reference 6/G (partly shown on inset A)

New private means of access to attenuation pond, and adjacent land to the west, from the existing junction 20B southbound off-slip road, 139 metres east of the Wellington Road overbridge replacement, for a distance of 533 metres.

Hatfield Peverel CP

Reference 6/H

New private means of access to Witham Farm fields, and attenuation pond access, from the north side of the new Hatfield Peverel link road, 308 metres west of the new junction 21 northern roundabout, for a distance of 98 metres.

Hatfield Peverel CP

Reference 6/I

New private means of access to attenuation pond between the realigned Witham link road and the new junction 21 northbound on-slip road, 270 metres east of the new junction 21 northern roundabout, for a distance of 56 metres.

Hatfield Peverel CP

Reference 6/J

New private means of access to field south of Latneys Kennels from the realigned kennel access, 540 metres east of the new junction 21 southern roundabout, for a distance of 68 metres, as shown on sheet 6.

Hatfield Peverel CP

Reference 6/K

New private means of access to attenuation pond and land to the west of Mayfield Cottages from the realigned Witham link road, 420 metres east of the new junction 21 northern roundabout, for a distance of 57 metres.

Witham CP

Reference 6/L

New private means of access to the Bethel Witham and Mayfield Cottages, from the realigned Witham link road, 460 metres east of the new junction 21 northern roundabout, for a distance of 24 metres.

Hatfield Peverel CP

Reference 6/M (inset C)

New private means of access to the attenuation pond between the A12 southbound carriageway and the realigned Kennel access road, for a distance of 23 metres.

Hatfield Peverel CP; Witham CP

Reference 6/N (inset C)

New private means of access to Latneys Kennels from the south side of the realigned Kennel access road, for a distance of 130 metres.

Hatfield Peverel CP

Reference 6/O (inset C)

New private means of access to the attenuation pond from the south side of the realigned kennels access, 540 metres east of the new junction 21 southern roundabout, for a distance of 115 metres.

Hatfield Peverel CP

Reference 6/P

New private means of access to provide link between fields southwest of Latneys Kennels, for a distance of 177 metres.

Hatfield Peverel CP

Reference 6/Q

New private means of access to the Greyhounds from the B1137, south of the Wellington Road overbridge replacement, for a distance of 2 metres.

Witham CP

Reference 6/R (inset C)

New private means of access to ecological mitigation area from reference 6/N, for a distance of 102 metres.

Streets, Rights of Way and Access Plans – Sheet 7 (and 8)
Hatfield Peverel CP; Witham CP

Reference 7/A

New private means of access to the Co-op, Witham, from the B1389 Hatfield Road, for a distance of 77 metres.

Witham CP

Reference 7/B

New private means of access to Dengie Farm from Howbridge Hall Road, for a distance of 815 metres.

Witham CP

Reference 7/C (sheets 7 and 8)

New private means of access to attenuation pond from the north-east of Howbridge Hall Road, for a distance of 723 metres.

Streets, Rights of Way and Access Plans – Sheet 8
Witham CP

Reference 8/A (partly shown on inset B)

New private means of access to the attenuation pond from Blue Mills Hill, for a distance of 812 metres.

Witham CP

Reference 8/B (inset B)

New private means of access to land south of the A12 southbound carriageway from Blackwater Lane, for a distance of 164 metres.

Witham CP

Reference 8/C (sheets 8 and 9)

New private means of access to the Anglian Water land and Witham Town Council land adjacent to the new southbound A12 from Blackwater Lane, for a distance of 392 metres.

Witham CP

Reference 8/D

New private means of access to land east of footpath 121_95 from reference 7/C, for a distance of 83 metres.

Witham CP

Reference 8/E

New private means of access to land east of footpath 121_95 from reference 7/C, for a distance of 52 metres.

Witham CP

Reference 8/F

New private means of access to land east of footpath 121_95 from reference 7/C, for a distance of 29 metres.

Streets, Rights of Way and Access Plans – Sheet 9
Rivenhall CP

Reference 9/A (inset A)

New private means of access to Colemans Fishing Lake, following the existing access track, for a distance of 146 metres.

Witham CP

Reference 9/B

New private means of access to northern Witham Town Council land, parallel to the east of the A12 southbound, for a distance of 540 metres.

Rivenhall CP

Reference 9/C (inset A)

New private means of access to Colemans Fishing Lake, following the existing access track, for a distance of 27 metres.

Streets, Rights of Way and Access Plans – Sheet 10
Rivenhall CP

Reference 10/A (partly shown on inset A)

New private means of access to attenuation pond from the realigned Little Braxted Lane, for a distance of 286 metres.

Rivenhall CP

Reference 10/B

New private means of access to properties south-east of the realigned Little Braxted Lane, for a distance of 63 metres.

Rivenhall CP

Reference 10/C

New private means of access to attenuation pond between the realigned Colchester Road and the new junction 22 northbound off-slip road, 197 metres west of the new junction 22 northern roundabout, for a distance 58 metres.

Rivenhall CP

Reference 10/D

New private means of access to Burghey Brook Cottages from the southern side of the existing A12, 158 metres east of the new junction 22 northern roundabout, for a distance of 12 metres.

Rivenhall CP

Reference 10/E

New private means of access to land north of the existing A12from northern side of the existing A12, 140 metres east of the new junction 22 northern roundabout, for a distance of 8 metres.

Witham CP; Rivenhall CP

Reference 10/F

New private means of access to Burghey Brook Poultry Farm from the northern side of the existing A12, 173 metres east of the new junction 22 northern roundabout, for a distance of 35 metres.

Rivenhall CP

Reference 10/G

New private means of access to the attenuation pond south of the existing A12, 193 metres east of the new junction 22 northern roundabout, for a distance of 327 metres.

Rivenhall CP

Reference 10/H

New private means of access to the attenuation pond south of the existing A12, 481 metres east of the new junction 22 northern roundabout, for a distance of 161 metres.

Rivenhall CP

Reference 10/I

New private means of access to Burghey Brook Cottages from the southern side of the existing A12, 174 metres east of the new junction 22 northern roundabout, for a distance of 9 metres.

Streets, Rights of Way and Access Plans – Sheet 11
Rivenhall CP

Reference 11/A

New private means of access to attenuation pond south of the existing A12, 56 metres south-west of the new Rivenhall End west roundabout, for a distance of 156 metres.

Rivenhall CP

Reference 11/B

New private means of access to attenuation pond south of the realigned Braxted Road, 430 metres south-east of the new Rivenhall End west roundabout, for a distance of 214 metres.

Rivenhall CP

Reference 11/C

New private means of access to attenuation pond west of the realigned access road, for a distance of 75 metres.

Rivenhall CP

Reference 11/D

New private means of access to Fair Rest, from the east side of the realigned access road, for a distance of 4 metres.

Rivenhall CP

Reference 11/E

New private means of access to the fields north of the existing A12, from the north-west side of the Rivenhall End west roundabout, for a distance of 18 metres.

Rivenhall CP

Reference 11/F

New private means of access to property behind the Fox Inn, from the north-west side of the existing A12, 50 metres east of the new Rivenhall End west roundabout, for a distance of 17 metres.

Rivenhall CP

Reference 11/G

New private means of access to attenuation pond from the realigned access road adjacent to the A12 southbound carriageway, for a distance of 363 metres.

Rivenhall CP

Reference 11/H

New private means of access to the ecological mitigation area between the realigned Henry Dixon Road and the A12 northbound carriageway, for a distance of 10 metres.

Rivenhall CP

Reference 11/I

New private means of access to ecological mitigation area north of the A12 northbound carriageway from Henry Dixon Road, for a distance of 17 metres.

Rivenhall CP

Reference 11/J

New private means of access to the ecological mitigation area south-east of the existing A12, 27 metres east of the Rivenhall End west roundabout, for a distance of 24 metres.

Rivenhall CP; Kelvedon CP

Reference 11/K (sheet 11 (inset B) and sheet 12)

New private means of access to attenuation pond south-east of the A12 mainline, 462 metres west of the new Essex Fire and Rescue access road, for a distance of 417 metres.

Rivenhall CP

Reference 11/L (inset A)

New private means of access to attenuation pond north of the existing A12, from the Rivenhall End east roundabout, for a distance of 123 metres.

Rivenhall CP

Reference 11/M

New private means of access to field north-west of the existing A12 northbound carriageway, 100 metres south-west of the Rivenhall End east roundabout, for a distance of 27 metres.

Rivenhall CP

Reference 11/N (partly shown on Inset A)

New private means of access to ecological mitigation area north-of the existing A12, from private means of access reference 11/L, for a distance of 123 metres.

Streets, Rights of Way and Access Plans – Sheet 12
Kelvedon CP

Reference 12/A (inset A)

New private means of access to the Essex County Fire and Rescue Services Headquarters, south of the new Essex Fire and Rescue access road, for a distance of 74 metres.

Kelvedon CP

Reference 12/B (inset A)

New private means of access to land south of Hole Farm from the new Essex Fire and Rescue access road, for a distance of 20 metres.

Kelvedon CP

Reference 12/C

New private means of access to the attenuation pond north of the new B1024 link road, 518 metres east of the Rivenhall End east roundabout, for a distance of 96 metres.

Kelvedon CP

Reference 12/D (inset A)

New private means of access to Hole Farm, south of the new Essex Fire and Rescue access road, for a distance of 29 metres.

Kelvedon CP

Reference 12/E (partly shown on inset B)

New private means of access to attenuation pond and other land south of the existing junction 23 southbound on-slip road, for a distance of 261 metres.

Kelvedon CP

Reference 12/F

New private means of access to Hole Farm Road, from the new Essex Fire and Rescue access road, for a distance of 138 metres.

Kelvedon CP

Reference 12/G

New private means of access to field south-east of Hole Farm, from the new Essex Fire and Rescue access road, for a distance of 16 metres.

Kelvedon CP

Reference 12/H

New private means of access from Sniveller’s Lane, in an easterly direction for a distance of 17 metres.

Kelvedon CP

Reference 12/I

New private means of access to the attenuation pond from Cranes Lane, in a westerly direction for a distance of 118 metres.

Kelvedon CP

Reference 12/J(inset B)

New private means of access to land south of the A12 mainline from reference 12/E, for a distance of 132 metres.

Streets, Rights of Way and Access Plans – Sheet 13 (and 14)
Great Braxted CP

Reference 13/A

New private means of access to the attenuation pond north of the realigned Highfields Lane, 293 metres west of the new Highfields overbridge replacement, for a distance of 144 metres.

Great Braxted CP

Reference 13/B

New private means of access to field south of Highfields Lane, 211 metres west of the new Highfields overbridge replacement, for a distance of 23 metres.

Great Braxted CP; Kelvedon CP

Reference 13/C

New private means of access to attenuation pond and other land north of the A12 mainline, from the western side of the realigned Maldon Road, 170 metres north of the Highfields overbridge replacement, for a distance of 207 metres.

Kelvedon CP

Reference 13/D

New private means of access to attenuation pond north of the A12 mainline, from the eastern side of the realigned Maldon Road, 244 metres north of the s Highfields overbridge replacement, for a distance of 51 metres.

Kelvedon CP

Reference 13/E (inset A)

New private means of access to attenuation pond south of the realigned Highfields Lane, 112 metres east of the new Highfields overbridge replacement, for a distance of 129 metres.

Kelvedon CP

Reference 13/F

New private means of access to attenuation pond north of the new A12 mainline from Ewell Hall Chase, for a distance of 92 metres.

Kelvedon CP

Reference 13/G (inset A)

New private means of land from the south side of the existing Highfields Lane, crossing reference 13/E for a distance of 218 metres.

Kelvedon CP

Reference 13/H (sheet 13 inset A and sheet 14)

New private means of access to the Ewell Road overbridge replacement, from Highfields Lane in a north easterly direction, for a distance of 691 metres.

Streets, Rights of Way and Access Plans – Sheet 14
Messing-Cum-Inworth CP

Reference 14/A

New private means of access to the Laurels from the west side of the B1023 Kelvedon Road, for a distance of 2 metres.

Feering CP; Messing-Cum-Inworth CP

Reference 14/B (inset C)

New private means of access to attenuation ponds north of the new A12 mainline, and other land from the B1023 Kelvedon Road, 53 metres north of the widened Park Bridge, for a distance of 947 metres.

Messing-Cum-Inworth CP

Reference 14/C

New private means of access to the pond adjacent to Brick Kiln Farm, and properties behind Brick Kiln Farm, from the eastern side of the B1023 Kelvedon Road, 44 metres south of the widened Park Bridge, for a distance of 63 metres.

Messing-Cum-Inworth CP

Reference 14/D

New private means of access to the attenuation pond and land north-east of Brick Kiln Farm, from the eastern side of the B1023 Kelvedon Road, 171 metres south of the widened Park Bridge.

Messing-Cum-Inworth CP

Reference 14/E

New private means of access to Westacre from the widened B1023 Kelvedon Road, 89 metres south-east of the Inworth roundabout, for a distance of 8 metres.

Messing-Cum-Inworth CP

Reference 14/F

New private means of access to the attenuation pond south of the Inworth roundabout, from the southern side of the new Inworth link, 226 metres east of the junction 24 southern roundabout, for a distance of 209 metres.

Messing-Cum-Inworth CP

Reference 14/G

New private means of access to attenuation pond and land on the north-west side of the Inworth roundabout, for a distance of 94 metres.

Messing-Cum-Inworth CP

Reference 14/H

New private means of access to Stonefields Farm and Stonefields Farm Shop from the realigned north B1023 Kelvedon Road, 32 metres north-east of the new Inworth roundabout, for a distance of 10 metres.

Messing-Cum-Inworth CP

Reference 14/I

New private means of access to attenuation pond north of the Inworth roundabout, from the realigned north Inworth Road, for a distance of 47 metres.

Feering CP

Reference 14/J (sheets 14 and 15 (inset B))

New private means of access to attenuation ponds south of the new A12 mainline from the realigned Prested Hall access road, for a distance of 717 metres.

Messing-Cum-Inworth CP

Reference 14/K

New private means of access to Rowan Lodge from the realigned north B1023 Kelvedon Road, 75 metres north of the Inworth roundabout, for a distance of 3 metres.

Messing-Cum-Inworth CP

Reference 14/L

New private means of access to Hillside from the realigned north B1023 Kelvedon Road, 69 metres north of the Inworth roundabout, for a distance of 3 metres.

Kelvedon CP

Reference 14/M (inset B)

New private means of access to attenuation pond north of the A12 mainline and other land, from the existing Ewell Hall Chase, for a distance of 776 metres.

Kelvedon CP

Reference 14/N (partly shown on inset A)

New private means of access to attenuation pond south of the A12 mainline from reference 14/M, for a distance of 115 metres.

Streets, Rights of Way and Access Plans – Sheet 15
Feering CP

Reference 15/A

New private means of access to Threshelfords Farm from the realigned Threshelfords access road, for a distance of 449 metres.

Feering CP

Reference 15/B

New private means of access to attenuation pond between the realigned Threshelfords access road (reference 15/A) and the new A12 northbound carriageway, for a distance of 216 metres.

Feering CP

Reference 15/C

New private means of access to land west of Prested Hall from the realigned Prested Hall access road, for a distance of 32 metres.

Feering CP

Reference 15/D

New private means of access to Prested Hall ecological mitigation area and other land south of the A12, from the east side of new Prested Hall Overbridge, for a distance of 328 metres.

Feering CP

Reference 15/E

New private means of access to attenuation pond between the existing junction 24 and the A12 northbound carriageway, from the realigned Prested Hall access road, for a distance of 137 metres.

Feering CP

Reference 15/F

New private means of access to western land between the existing A12 and the realigned London Road, 222 metres west of Feering East roundabout, for a distance of 10 metres.

Feering CP

Reference 15/G

New private means of access to land between the A12 and the realigned London Road, for a distance of 9 metres.

Feering CP

Reference 15/H

New private means of access to field east of New Lane, from the existing A12 northbound slip road, for a distance of 8 metres.

Feering CP

Reference 15/J

New private means of access to attenuation pond between the existing A12 and the new A12 northbound carriageway, 508 metres east of the Feering East roundabout, for a distance of 116 metres.

Feering CP

Reference 15/K

New private means of access to Prested Hall Cottages and Heathfield from the eastern side of the Feering east roundabout, for a distance of 98 metres.

Feering CP

Reference 15/L

New private means of access to attenuation pond from reference 15/D, for a distance of 66 metres.

Feering CP

Reference 15/M

New private means of access to the attenuation pond between the Feering East roundabout and the A12 northbound carriageway, from reference 15/E, for a distance of 197 metres.

Streets, Rights of Way and Access Plans – Sheet 16
Feering CP

Reference 16/A (insets A and B)

New private means of access to attenuation pond south of the A12 and Gypsy Lane from the realigned Easthorpe Road, for a distance of 637 metres.

Feering CP

Reference 16/B

New private means of access to Little Domsey Cottages from the northern end of Easthorpe Road, for a distance of 3 metres.

Copford CP

Reference 16/C

New private means of access to Colchester Model Car Club and the attenuation pond between the existing A12 and the new A12, 81 metres east of the Easthorpe Road roundabout, for a distance of 113 metres.

Copford CP

Reference 16/D (sheet 16 and 17)

New private means of access to attenuation pond and land south of the new A12, from the realigned Easthorpe Road, for a distance of 774 metres.

Copford CP

Reference 16/E

New private means of access to Colchester Model Car Club from the realigned Easthorpe Road, for a distance of 27 metres.

Feering CP

Reference 16/F

New private means of access to ecological mitigation area east of Easthorpe Road, for a distance of 2 metres.

Feering CP

Reference 16/G

New private means of access to land west of Easthorpe Road, for a distance of 2 metres.

Feering CP

Reference 16/H

New private means of access to field north of the existing A12 from the western side of Domsey Chase, 27 metres north of the Easthorpe Road roundabout, for a distance of 34 metres.

Feering CP

Reference 16/I

New private means of access to field north of the existing A12 from the eastern side of Domsey Chase, 27 metres north of the Easthorpe Road roundabout, for a distance of 23 metres.

Feering CP

Reference 16/J (inset A)

New private means of access to Gypsy Lane from the existing Easthorpe Road, for a distance of 33 metres.

Streets, Rights of Way and Access Plans – Sheet 17
Copford CP

Reference 17/A

New private means of access to the attenuation pond south of the A12 mainline from the western end of the realigned Easthorpe Green access road, for a distance of 538 metres.

Copford CP

Reference 17/B

New private means of access to the attenuation pond between the existing A12and the new A12 mainline, west of the Wishingwell overbridge, from the north of the existing Easthorpe Green Farm access road, for a distance of 186 metres.

Copford CP

Reference 17/C

New private means of access to the attenuation pond on the southwest side of the realigned Easthorpe Green access road, 223 metres west of Wishing Well Overbridge.

Marks Tey CP

Reference 17/D

New private means of access to the attenuation pond between the existing A12 and the new A12 mainline, 179 metres east of the Wishingwell Farm roundabout, for a distance of 58 metres.

Copford CP

Reference 17/E

New private means of access to ecological mitigation area between the Existing A12 and the A12 mainline, 1,039 metres west of the Wishingwell Farm roundabout, for a distance of 9 metres.

Marks Tey CP

Reference 17/F

New private means of access to field north of the existing A12, 34 metres east of the new Wishingwell Farm roundabout, for a distance of 18 metres.

Marks Tey CP

Reference 17/G (sheets 17 and 18)

New private means of access to attenuation pond and land south of the new A12 from the eastern end of the new Wishingwell access road, 398 metres east of the new Wishingwell overbridge, for a distance of 164 metres.

Streets, Rights of Way and Access Plans – Sheet 18
Marks Tey CP

Reference 18/A

New private means of access to Flyover Nurseries from the realigned A120 Coggeshall Road, 50 metres west of the Old Rectory junction, for a distance of 4 metres.

Marks Tey CP; Copford CP

Reference 18/B (inset A)

New private means of access to ecological mitigation areas and other land south of the new A12 and east of Wishingwell Farm, for a distance of 1,043 metres.

Marks Tey CP

Reference 18/C

New private means of access to the attenuation ponds between the Existing A12 and the new A12 mainline from the new London Road roundabout, for a distance of 43 metres.

Marks Tey CP

Reference 18/D

New private means of access to Hall Chase from the Hall Chase Roundabout, for a distance of 146 metres.

Marks Tey CP

Reference 18/E

New private means of access to Marks Tey playground from the realigned Old London Road, 229 metres north of the London Road roundabout, for a distance of 13 metres.

Marks Tey CP

Reference 18/F

New private means of access to the attenuation pond east of the realigned Hall Chase Road from the new Hall Chase roundabout, for a distance of 60 metres.

Marks Tey CP

Reference 18/G

New private means of access to land between the Existing A12 and the junction 25 northbound off-slip road, 68 metres west of the London Road roundabout, for a distance of 58 metres.

Marks Tey CP

Reference 18/H

New private means of access to field between Old London Road and the A120 Coggeshall Road from Old London Road, for a distance of 8 metres.

Marks Tey CP

Reference 18/I

New private means of access to 141 and 139 London Road, 59 metres north of Hall Chase roundabout, for a distance of 2 metres.

Marks Tey CP

Reference 18/J

New private means of access to 137 London Road, 66 metres north of Hall Chase roundabout, for a distance of 2 metres.

Marks Tey CP

Reference 18/K

New private means of access to 135 London Road, 75 metres north of Hall Chase roundabout, for a distance of 3 metres.

Marks Tey CP

Reference 18/L

New private means of access to Flyover Nurseries from the realigned A120 Coggeshall Road, 87 metres west of the Old Rectory junction, for a distance of 3 metres.

Marks Tey CP

Reference 18/M

New private means of access to 166 and 164 London Road, 145 metres east of the realigned Old London Road access, for a distance of 2 metres.

Marks Tey CP

Reference 18/N

New private means of access to 162 and 160 London Road, for a distance of 3 metres.

Marks Tey CP

Reference 18/O

New private means of access to 158 London Road, 180 metres east of the realigned Old London Road access, for a distance of 3 metres.

Marks Tey CP

Reference 18/P

New private means of access to land south of the existing A12, for a distance of 12 metres.

Streets, Rights of Way and Access Plans – Sheet 19
Copford CP

Reference 19/A

New private means of access to the attenuation pond and ecological mitigation area from the B1408 London Road, 645 metres east of the Prince of Wales roundabout, for a distance of 356 metres.

Marks Tey CP

Reference 19/B

New private means of access to Old Rectory Court, from the realigned Station Road for a distance of 2 metres.

Marks Tey CP

Reference 19/C

New private means of access to Old Rectory Court, from the realigned Station Road for a distance of 4 metres.

Streets, Rights of Way and Access Plans – Sheet 20
Messing-Cum-Inworth CP

Reference 20/A

New private means of access to land east of the widened B1023 Kelvedon Road, for a distance of 19 metres.

Messing-Cum-Inworth CP

Reference 20/B

New private means of access to All Saints Church from the west side of the widened B1023 Kelvedon Road, for a distance of 7 metres.

Messing-Cum-Inworth CP

Reference 20/C

New private means of access to the attenuation pond and land east of the widened B1023 Kelvedon Road, for a distance of 62 metres.

Messing-Cum-Inworth CP

Reference 20/D

New private means of access to land west of the B1023 Kelvedon Road, for a distance of 3 metres.

Messing-Cum-Inworth CP

Reference 20/E

New private means of access to land west of the B1023 Kelvedon Road, for a distance of 3 metres.

Messing-Cum-Inworth CP

Reference 20/F

New private means of access to land east of the widened B1023 Kelvedon Road, from the widened B1023 Kelvedon Road for a distance of 49 metres.

Messing-Cum-Inworth CP

Reference 20/G

New private means of access to land east of the widened B1023 Kelvedon Road, from reference 20/F, for a distance of 54 metres.

Messing-Cum-Inworth CP

Reference 20/H

New private means of access to flood compensation area and land east of the widened B1023 Kelvedon Road, from reference 20/F, for a distance of 59 metres.

Messing-Cum-Inworth CP

Reference 20/I

New private means of access to land from the B1023 Kelvedon Road, for a distance of 3 metres.

Messing-Cum-Inworth CP

Reference 20/J

Not used.

Messing-Cum-Inworth CP

Reference 20/K

New private means of access to land east of the widened B12023 Kelvedon Road, for a distance of 3 metres.

Messing-cum-Inworth CP

Reference 20/L

New private means of access to the attenuation pond for a distance of 53 metres.

Messing-cum-Inworth CP

Reference 20/M

New private means of access to the attenuation pond for a distance of 34 metres.

Streets, Rights of Way and Access Plans – Sheet 21
Feering CP; Messing-Cum-Inworth CP

Reference 21/A (sheets 21 and 14)

New private means of access to woodland area north of the new junction 24 from reference 14/B, for a distance of 299 metres.

PART 6PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Private means of access to be stopped up

(3)

Extent of stopping up

Streets, Rights of Way and Access Plans – Sheet 6
Hatfield Peverel CP

Reference 6/c

The private means of access to land north of the existing A12 northbound carriageway.

The whole access.
Hatfield Peverel CP

Reference 6/d

The private means of access to land north of the existing A12 northbound carriageway.

The whole access.
Streets, Rights of Way and Access Plans – Sheet 9
Witham CP

Reference 9/a

The Barrows Creep Underpass.

The whole length of the underpass.
Streets, Rights of Way and Access Plans – Sheet 10
Rivenhall CP

Reference 10/c

The private means of access to Colemans Quarry.

For a distance of 85 metres.
Streets, Rights of Way and Access Plans – Sheet 11
Rivenhall CP

Reference 11/a

The private means of access to the field north of the existing A12 northbound carriageway.

The whole access.
Streets, Rights of Way and Access Plans – Sheet 12
Kelvedon CP

Reference 12/a

The private means of access to Hare Lodge and Erimyka, north of the existing A12 northbound carriageway.

The whole access.
Kelvedon CP

Reference 12/c

The private means of access from Crane’s Lane to fields of the existing A12.

The whole access.
Streets, Rights of Way and Access Plans – Sheet 14
Messing-Cum-Inworth CP

Reference 14/a

The Inworth Subway private means of access.

Whole length of subway.
Messing-Cum-Inworth CP

Reference 14/c

The private means of access to property on west side of the B1023 Kelvedon Road.

The whole access.
Messing-Cum-Inworth CP

Reference 14/d

The private means of access to the properties behind Brick Kiln Farm.

The whole access.
Messing-Cum-Inworth CP

Reference 14/e

The private means of access to the properties behind the Brick Kiln Farm.

The whole access.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill