Chwilio Deddfwriaeth

The Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021

Status:

Point in time view as at 01/04/2021.

Changes to legislation:

There are currently no known outstanding effects for the The Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulations 3, 4, 29, 34 and 36

SCHEDULE 1E+WAmount of manure, nitrogen and phosphate produced by grazing livestock and non-grazing livestock

Commencement Information

I1Sch. 1 in force at 1.4.2021, see reg. 1(3)

Table 1

Grazing livestock

CategoryDaily manure produced by each animal (litres)Daily nitrogen produced by each animal (grams)Daily phosphate produced by each animal (grams)
(a)

Castrated male.

(b)

In the case of a ewe, this figure includes one or more suckled lambs until the lambs are aged six months.

Cattle
Calves (all categories except veal) up to 3 months:72312.7
Dairy cows—
from 3 months and less than 13 months:209534
from 13 months up to first calf:4016734
After first calf and—
annual milk yield more than 9000 litres:64315142
annual milk yield between 6000 and 9000 litres:53276121
annual milk yield less than 6000 litres:4221193
Beef cows or steers(a)
from 3 months and less than 13 months:209133
from 13 months and less than 25 months:2613743
From 25 months—
females or steers for slaughter:3113760
females for breeding—
weighing 500 kg or less:3216765
weighing more than 500 kg:4522786
Bulls
Non-breeding, 3 months and over:2614824
Breeding—
from 3 months and less than 25 months:2613743
from 25 months:2613260
Sheep
From 6 months up to 9 months old:1.85.50.76
From 9 months old to first lambing, first tupping or slaughter:1.83.92.1
After lambing or tupping(b)
weight less than 60 kg:3.3218.8
weight from 60 kg:5310.0
Goats, deer and horses
Goats:3.54118.8
Deer—
breeding:54217.6
other:3.53311.7
Horses:245856

Table 2

Non-grazing livestock

CategoryDaily manure produced by each animal (litres)Daily nitrogen produced by each animal (grams)Daily phosphate produced by each animal (grams)
(a)

Note: all figures for poultry include litter.

Cattle
Veal calves:72312.7
Poultry(a)
Chickens used for production of eggs for human consumption—
less than 17 weeks:0.040.640.47
from 17 weeks (caged):0.121.131.0
from 17 weeks (not caged)0.121.51.1
Chickens raised for meat:0.061.060.72
Chickens raised for breeding—
less than 25 weeks:0.040.860.78
from 25 weeks:0.122.021.5
Turkeys—
male:0.163.743.1
female:0.122.832.3
Ducks:0.102.482.4
Ostriches:1.63.8318.5
Pigs
Weight from 7 kg and less than 13 kg:1.34.11.3
Weight from 13 kg and less than 31 kg:214.26.0
Weight from 31 kg and less than 66 kg—
dry fed:3.72412.1
liquid fed:7.12412.1
Weight from 66 kg and—
Intended for slaughter—
dry fed:5.13317.9
liquid fed:103317.9
sows intended for breeding that have not yet had their first litter:5.63820
sows (including their litters up to a weight of 7 kg per piglet) fed on a diet supplemented with synthetic amino acids:10.94437
sows (including their litters up to a weight of 7 kg per piglet) fed on a diet without synthetic amino acids:10.94937
breeding boars from 66 kg up to 150 kg:5.13317.9
breeding boars, from 150 kg8.74828

Regulation 5

SCHEDULE 2E+WFruit species

Commencement Information

I2Sch. 2 in force at 1.4.2021, see reg. 1(3)

Botanical NameCommon Name
Cydonia oblongaQuince
Malus domesticaApple
Mespilus germanicaMedlar
Morus spp.Mulberry
Prunus armenaicaApricot
Prunus aviumSweet cherry
Prunus cerasusSour (cooking) cherry
Prunus ceraciferaCherry plum
Prunus domesticaPlum
Prunus domestica subsp. insititiaDamson, Bullace
Prunus persicaPeach
Prunus persica var. nectarinaNectarine
Prunus x gondouiniiDuke cherry
Prunus spinosaSloe
Pyrus communisPear
Pyrus pyrifoliaAsian pear

Regulations 9, 36 and 37

SCHEDULE 3E+WCalculating nitrogen in organic manure

PART 1E+WStandard Table

Commencement Information

I3Sch. 3 Pt. 1 in force at 1.4.2021, see reg. 1(3)

Total amount of nitrogen in livestock manure

Manure other than slurryTotal nitrogen in each tonne (kg)
Manure other than slurry from—
cattle:6
pigs:7
sheep:7
ducks:6.5
horses:7
goats:6
Manure from laying hens:19
Manure from turkeys or broiler chickens:10
SlurryTotal nitrogen in each cubic metre (kg)
cattle:2.6
pigs:3.6
Separated cattle slurry (liquid fraction)—
strainer box:1.5
weeping wall:2
mechanical separator:3
Separated cattle slurry (solid fraction):4
Separated pig slurry (liquid fraction):3.6
Separated pig slurry (solid fraction):5
Dirty water:0.5

PART 2E+WSampling and analysis of organic manure

Slurry and other liquid and semi-liquid organic manureE+W

1.—(1) In relation to slurry and other liquid and semi-liquid organic manure, at least five samples, each of 2 litres, must be taken.

(2) Subject to sub-paragraph (3), the five samples must be taken from a vessel, and—

(a)if reasonably practicable, the slurry must be thoroughly mixed before the samples are taken, and

(b)each sample must be taken from a different location.

(3) If a tanker used for spreading is fitted with a suitable valve, the samples may be taken while spreading, and each sample must be taken at intervals during the spreading.

(4) Whether taken as described in sub-paragraph (2) or (3), the five samples must be poured into a larger container, stirred thoroughly and a 2 litre sample must be taken from that container and poured into a smaller clean container.

(5) The 2 litre sample produced in accordance with sub-paragraph (4) must then be sent for analysis.

Commencement Information

I4Sch. 3 para. 1 in force at 1.4.2021, see reg. 1(3)

Solid manuresE+W

2.—(1) In relation to solid manures, the samples must be taken from a manure heap.

(2) At least ten samples of 1 kg each must be taken, each from a different location in a heap.

(3) Each sub-sample must be taken at least 0.5 metres from the surface of the heap.

(4) If samples are being collected to calculate compliance with the whole farm limit for pigs and poultry, four samples for analysis must be taken in a calendar year (one taken in each quarter) from manure heaps not more than 12 months old.

(5) The sub-samples must be placed on a clean, dry tray or sheet.

(6) Any lumps must be broken up and the sub-samples must be thoroughly mixed together.

(7) A representative sample of at least 2 kg must then be sent for analysis.

Commencement Information

I5Sch. 3 para. 2 in force at 1.4.2021, see reg. 1(3)

Regulations 20 and 22

SCHEDULE 4E+WPermitted crops for the closed period

Commencement Information

I6Sch. 4 in force at 1.4.2021, see reg. 1(3)

CropMaximum nitrogen rate (kg/hectare)
(a)

Nitrogen must not be spread on crops after 31 October.

(b)

An additional 50 kg of nitrogen per hectare may be spread every four weeks during the closed period up to the end of harvest.

(c)

A maximum of 40 kg of nitrogen per hectare may be spread at any one time.

Oilseed rape, winter(a)30
Asparagus50
Brassica(b)100
Grass(a) (c)80
Over-wintered salad onions40
Parsley40
Bulb onion40

Regulation 24

SCHEDULE 5E+WRequirements for silos

1.  The requirement to be satisfied in relation to a silo is that it complies with the following provisions of this Schedule.E+W

Commencement Information

I7Sch. 5 para. 1 in force at 1.4.2021, see reg. 1(3)

2.  The base of the silo must—E+W

(a)extend beyond any walls of the silo,

(b)be provided at its perimeter with channels designed and constructed so as to collect any silage effluent that escapes from the silo, and

(c)have adequate provision for the drainage of that effluent from those channels to an effluent tank through a channel or pipe.

Commencement Information

I8Sch. 5 para. 2 in force at 1.4.2021, see reg. 1(3)

3.  The capacity of the effluent tank must not be less than—E+W

(a)in the case of a silo with a capacity of less than 1,500 cubic metres, 20 litres for each cubic metre of silo capacity, and

(b)in the case of a silo with a capacity of 1,500 cubic metres or more, 30 cubic metres plus 6.7 litres for each cubic metre of silo capacity in excess of 1,500 cubic metres.

Commencement Information

I9Sch. 5 para. 3 in force at 1.4.2021, see reg. 1(3)

4.—(1) The base of the silo must be—E+W

(a)designed in accordance with the code of practice for design of concrete structures for retaining aqueous liquids published by the British Standards Institution and numbered BS 8007: 1987(1), or

(b)constructed using appropriate hot-rolled asphalt in accordance with the code of practice for selection and use of construction materials published by the British Standards Institution and numbered BS 5502: Part 21: 1990(2).

(2) The base of the silo, the base and walls of its effluent tank and channels and walls of any pipes must be impermeable.

Commencement Information

I10Sch. 5 para. 4 in force at 1.4.2021, see reg. 1(3)

5.  The base and walls of the silo, its effluent tank and channels and the walls of any pipes must, so far as reasonably practicable, be resistant to attack by silage effluent.E+W

Commencement Information

I11Sch. 5 para. 5 in force at 1.4.2021, see reg. 1(3)

6.  No part of the silo, its effluent tank or channels or any pipes may be situated within 10 metres of any inland freshwaters or coastal waters into which silage effluent could enter if it were to escape.E+W

Commencement Information

I12Sch. 5 para. 6 in force at 1.4.2021, see reg. 1(3)

7.  If the silo has retaining walls—E+W

(a)the retaining walls must be capable of withstanding minimum wall loadings calculated on the assumptions and in the manner indicated by paragraph 15.6 of the code of practice on buildings and structures for agriculture published by the British Standards Institution and numbered BS 5502: Part 22: 2003(3),

(b)the silo must at no time be loaded to a depth exceeding the maximum depth consistent with the design assumption made in respect of the loadings of the retaining walls, and

(c)notices must be displayed on the retaining walls in accordance with paragraph 18 of that code of practice.

Commencement Information

I13Sch. 5 para. 7 in force at 1.4.2021, see reg. 1(3)

8.  Subject to paragraph 9, the silo, its effluent tank and channels and any pipes must be designed and constructed so that with proper maintenance they are likely to continue to satisfy the requirements of paragraphs 2 to 5 and, if applicable, paragraph 7(a) for at least 20 years.E+W

Commencement Information

I14Sch. 5 para. 8 in force at 1.4.2021, see reg. 1(3)

9.  If any part of an effluent tank is below ground level, the tank must be designed and constructed so that it is likely to continue to satisfy the requirements of paragraphs 4 and 5 for at least 20 years without maintenance.E+W

Commencement Information

I15Sch. 5 para. 9 in force at 1.4.2021, see reg. 1(3)

Regulation 25

SCHEDULE 6E+WRequirements for slurry storage systems

1.  The requirements to be satisfied in relation to a slurry storage system are as follows.E+W

Commencement Information

I16Sch. 6 para. 1 in force at 1.4.2021, see reg. 1(3)

2.  The base of the slurry storage tank, the base and walls of any effluent tank, channels and reception pit, and the walls of any pipes, must be impermeable.E+W

Commencement Information

I17Sch. 6 para. 2 in force at 1.4.2021, see reg. 1(3)

3.  The base and walls of the slurry storage tank, any effluent tank, channels and reception pit, and the walls of any pipes, must be protected against corrosion in accordance with paragraph 7 of the code of practice on buildings and structures for agriculture published by the British Standards Institution and numbered BS 5502: Part 50: 1993(4).E+W

Commencement Information

I18Sch. 6 para. 3 in force at 1.4.2021, see reg. 1(3)

4.  The base and walls of the slurry storage tank and of any reception pit must be capable of withstanding characteristic loads calculated on the assumptions and in the manner indicated by paragraph 5 of the code of practice on buildings and structures for agriculture published by the British Standards Institution and numbered BS 5502: Part 50: 1993.E+W

Commencement Information

I19Sch. 6 para. 4 in force at 1.4.2021, see reg. 1(3)

5.—(1) Any facilities used for the temporary storage of slurry before it is transferred to a slurry storage tank must have adequate capacity to store—E+W

(a)the maximum quantity of slurry that (disregarding any slurry which will be transferred directly into a slurry storage tank) is likely to be produced on the premises in any two day period, or

(b)a lesser capacity that NRBW agrees in writing is adequate to avoid any significant risk of pollution of controlled waters.

(2) Where slurry flows into a channel before discharging into a reception pit and the flow of slurry out of the channel is controlled by means of a sluice, the capacity of the reception pit must be adequate to hold the maximum quantity of slurry that can be released by opening the sluice.

Commencement Information

I20Sch. 6 para. 5 in force at 1.4.2021, see reg. 1(3)

6.  In the case of a slurry storage tanks with walls made of earth, the tank must have at least 750 mm of freeboard and 300 mm of freeboard in all other cases.E+W

Commencement Information

I21Sch. 6 para. 6 in force at 1.4.2021, see reg. 1(3)

7.  No part of the slurry storage tank or any effluent tank, channels or reception pit may be situated within 10 metres of any inland freshwaters or coastal waters into which slurry could enter if it were to escape unless precautions are taken that NRBW agrees in writing are adequate to avoid any significant risk of pollution of controlled waters.E+W

Commencement Information

I22Sch. 6 para. 7 in force at 1.4.2021, see reg. 1(3)

8.  The slurry storage tank and any effluent tank, channels, pipes and reception pit must be designed and constructed so that with proper maintenance they are likely to continue to satisfy the requirements of paragraphs 2 to 4 for at least 20 years.E+W

Commencement Information

I23Sch. 6 para. 8 in force at 1.4.2021, see reg. 1(3)

9.  If the walls of the slurry storage tank are not impermeable, the base of the tank must—E+W

(a)extend beyond the walls;

(b)be provided with channels designed and constructed so as to collect any slurry that escapes from the tank;

(c)have adequate provision for the drainage of the slurry from those channels to an effluent tank through a channel or pipe.

Commencement Information

I24Sch. 6 para. 9 in force at 1.4.2021, see reg. 1(3)

10.—(1) Subject to sub-paragraph (3), if the slurry storage tank or any effluent tank or reception pit is fitted with a drainage pipe there must be two valves in series on the pipe with each valve separated from the other by a minimum distance of 1 metre.E+W

(2) Each valve must be capable of shutting off the flow of slurry through the pipe and must be kept shut and locked in that position when not in use.

(3) Sub-paragraph (1) does not apply in relation to a slurry storage tank that drains through the pipe into another slurry storage tank if the other tank is of equal or greater capacity or if the tops of the tanks are at the same level.

Commencement Information

I25Sch. 6 para. 10 in force at 1.4.2021, see reg. 1(3)

(1)

Publication date: 30 October 1987. ISBN 0-580-16134-X.

(2)

Publication date: 31 December 1990. ISBN 0-580-18348-3.

(3)

Publication date: 10 June 2003. ISBN 0-580-38654-6.

(4)

Publication date: 15th April 1993. ISBN 0-580-22053-2.

Yn ôl i’r brig

Options/Cymorth

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’. Dim ond yn Saesneg y mae’r fersiwn ddiwygiedig ar gael ar hyn o bryd.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed) - Saesneg: Mae'r wreiddiol Saesneg fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed)-Cymraeg:Y fersiwn Gymraeg wreiddiol o’r ddeddfwriaeth fel yr oedd yn sefyll pan gafodd ei deddfu neu ei gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search. A point in time version is only available in English.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill