- Latest available (Revised)
- Point in Time (01/04/2018)
- Original (As enacted)
Version Superseded: 01/04/2019
Point in time view as at 01/04/2018. This version of this provision has been superseded.
You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.
Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.
Water Industry Act 1991, Section 51CA is up to date with all changes known to be in force on or before 16 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
(1)The Authority must issue a code in respect of section 51A agreements.
(2)The code may make provision about—
(a)procedures in connection with making an agreement under section 51A;
(b)procedures in connection with varying or terminating a section 51A agreement;
(c)procedures to be followed by the Authority in determining whether to make an order under section 51B(4) or 51C(1);
(d)the circumstances in which it is, or is not, appropriate for work to be done by a person other than a water undertaker;
(e)the terms and conditions of a section 51A agreement;
(f)principles for determining the terms and conditions that should or should not be incorporated into a section 51A agreement;
(g)the steps to be taken by the Authority in determining whether a person is complying with the code.
(3)Provision under subsection (2)(c) may in particular require the Authority to consult—
(a)the Chief Inspector of Drinking Water;
(b)the Chief Inspector of Drinking Water for Wales if there is one.
(4)Provision under subsection (2)(d) may include in particular provision about circumstances relating to—
(a)the nature of the work;
(b)the kind of premises supplied or to be supplied.
(5)Provision under subsection (2)(e) may include in particular provision about terms and conditions as regards—
(a)constructing associated infrastructure;
(b)vesting associated infrastructure in a water undertaker;
(c)constructing water mains so as to meet additional supply requirements;
(d)connecting new water mains or service pipes to the existing supply system of a water undertaker;
(e)complying with requirements of the kind referred to in section 47(2);
(f)the duration of a section 51A agreement.
(6)If the Authority considers that a water undertaker is not acting as required by the code, the Authority may give the undertaker a direction to do, or not to do, a particular thing specified in the direction.
(7)The Authority may not give a direction under subsection (6) requiring a person to enter into, vary or terminate an agreement.
(8)It is the duty of a water undertaker to comply with a direction under subsection (6), and this duty is enforceable by the Authority under section 18.
(9)The code may make different provision for different persons or descriptions of person.
(10)The Authority must from time to time review the code and, if appropriate, issue a revised code.
(11)A revised code may include provision for applying any of its revisions to section 51A agreements made before the revised code comes into force.]]
Textual Amendments
F1Ss. 51A-51E and preceding cross-heading inserted (28.5.2004) by Water Act 2003 (c. 37), ss. 92(1), 105(3); S.I. 2004/641, art. 4(a) (with art. 6, Sch. 3)
F2Ss. 51B-51CG substituted for ss. 51B, 51C (18.12.2015 for the substitution of ss. 51CD-51CG, 1.4.2017 for E. for the substitution of s. 51B(6) for specified purposes and s. 51CB, 1.10.2017 for E. in so far as not already in force) by Water Act 2014 (c. 21), ss. 10(3), 94(3); S.I. 2015/1938, art. 2(b)(ii); S.I. 2017/462, arts. 3(d)(ii), 4(a) (with art. 15)
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: