Article 2
Column 1 | Column 2 |
---|---|
Description of Area | Period applying in 1990 and subsequent years |
Bradwell Power Station | |
The area between the Baffle Wall and the Bradwell foreshore enclosed by lines drawn perpendicular (145° true) from the NE and SW corners of the Baffle Wall to the shore | Between 30 April and 1 November |
Grain Power Station | |
The area enclosed by a line drawn 120° true through Grain Martello Tower and Grain Hard Buoy to Garrison Point, and a line drawn 114° true from the foreshore at Grain Power Station to the western extremity of the Ro Ro Terminal, and the Isle of Grain and Sheerness foreshores | All year |
Kingsnorth Power Station | |
The area enclosed by Bee Ness Jetty and a line drawn 204° true to the tip of Oakham Ness Jetty, thence 260° true to the SE tip of Kingsnorth Jetty, and along the seaward arm of Kingsnorth Jetty and then 298° true to the Kingsnorth power station foreshore | All year |
Chichester Harbour | |
All tidal waters enclosed by a line drawn 192° true from Eastoke Point to Chichester Bar Beacon, then 078° true to Cakeham Tower | Between 30 April and 1 November |
Langstone Harbour | |
All tidal waters enclosed by a line drawn 153° true from the Gunnery Range Light at Eastney Point to Langstone Fairway Buoy (50° 46.25'N 01° 01.27'W), then 033° true to the foreshore east of Gunner Point | Between 30 April and 1 November |
Portsmouth Harbour | |
All tidal waters enclosed by a line drawn from Gilkicker Point to Southsea Castle | Between 30 April and 1 November |
Southampton Water | |
All tidal waters enclosed by a line drawn 090° true from the Cadland foreshore to the Warsash foreshore passing through the north-west extremity of the Esso tanker jetty but exlcluding those waters above the Redbridge Causeway on the River Test | Between 30 April and 1 November |
Fawley Power Station | |
The area enclosed by a circle drawn with a radius of 3 cables around the outfall from Fawley Power Station | Between 30 April and 1 November |
Poole Harbour | |
All tidal waters enclosed by a line drawn 011° true from Jerry’s Point, through Branksea Castle to Salterns Pier | Between 30 April and 1 NovemberThe Fleet |
All tidal waters of the Fleet inside Ferry Bridge | All year |
River Exe, Devon | |
All tidal waters enclosed by a line drawn 068° true from Langstone Point to Orcombe Point | Between 30 April and 1 November |
River Teign | |
All tidal waters enclosed by a line drawn 000° true from the Ness to the southernmost leading light | Between 30 April and 1 November |
River Dart, Devon | |
All tidal waters enclosed by a line drawn 064° true from Combe Point to Inner Froward Point | Between 30 April and 1 January |
Salcombe Harbour | |
All tidal waters enclosed by a line drawn 090° true from Splat Point to Limebury Point | Between 30 April and 1 January |
River Avon, Devon | |
All tidal waters enclosed by a line drawn 206° true from Warren Point at Bigbury-on-Sea to Burgh Island, and a line drawn 090° true from the southern tip of Burgh Island to the coast | Between 30 April and 1 January |
River Yealm | |
All tidal waters enclosed by a line drawn 205° true from Season Point to Mouthstone Point | Between 30 April and 1 January |
Plymouth Rivers | |
All tidal waters enclosed by a line drawn from the western end of Mountbatten Pier 268° true to the landing beacon at Wilderness Point in the River Tamar | All year |
River Fowey | |
All tidal waters enclosed by a line drawn 270° true from Penleath Point to the opposite shore | Between 30 April and 1 January |
Fal Estuary | |
All tidal waters enclosed by a line drawn 045° true from Weir Point to Turnaware Point | Between 30 April and 1 January |
Percuil River | |
All tidal waters enclosed by a line drawn 151° true from St Mawes Castle to Carricknath Point | Between 30 April and 1 January |
Helford River | |
All tidal waters enclosed by a line drawn 199° true from Rosemullion Head to Dennis Head | Between 30 April and 1 January |
River Camel | |
All tidal waters enclosed by a line drawn 116° true from Stepper Point to Trebetherick Point | Between 30 April and 1 December |
River Torridge | |
All tidal waters enclosed by a line drawn 290° true from Zeta Berth to the opposite shore | Between 30 April and 1 November |
River Taw | |
All tidal waters enclosed by a line drawn 190° true from the western end of Braunton Pill to the site of the former power station at Yelland | Between 30 April and 1 November |
Aberthaw Power Station | |
All tidal waters enclosed by a line drawn at a radius of 1 nautical mile from Breaksea Point | All year |
Burry Inlet | |
All tidal waters enclosed by a line drawn 071° true from Whiteford Lighthouse to Llanelli Docks and a line drawn 180° true from Whiteford Lighthouse to the shore | Between 30 April and 1 November |
Taf, Tywi and Gwendraeth Estuary | |
All tidal waters enclosed by a line drawn 119° true from Ginst Point to Pen Towyn Point | Between 30 April and 1 November |
Milford Haven | |
All tidal waters enclosed by a line drawn from the shore along the eastern side of the Texaco Terminal approach jetty to the southernmost part of the T jetty thence eastwards along the southern edge of the jetty to the extremity as No. 3 berth (51° 41.87'N, 04° 57.58'W) and then 098° true through the Pennar Beacon to the Llanreath foreshore (51° 41.55'N, 04° 57.58'W) and by a line drawn 162° true along the seaward side of the Pembroke to Neyland road bridge | Between 30 April and 1 November |
River Dyfi | |
All tidal waters enclosed by a line drawn 168° true from Trefeddian Hotel (52° 32.8'N, 04° 03.6'W) to the flag pole at Ynys Las (52° 31.4'N, 04° 03.8'W) | Between 30 April and 1 November |
River Mawddach | |
All tidal waters enclosed by a line drawn 226° true from the flagpole at Barmouth (52° 43.1'N, 04° 03.1'W) to the perch at 52° 42.7'N, 04° 03.7'W thence 155° true to the corner of the sea wall at Fairbourne (52° 42.5'N, 04° 03.6'W) | Between 30 April and 1 November |
Dwyryd/Glaslyn Estuary | |
All tidal waters enclosed by a line drawn 152° true from the White House (52° 54.4'N, 04° 09.1'W) to Harlech Point (52° 53.7'N, 04° 08.5'W) | Between 30 April and 1 November |
Conwy Estuary | |
All tidal waters enclosed by a line drawn 254° true from the two flag staffs at Deganwy Yacht Club (53° 17.9'N, 03° 50.3'W) to Conwy Morfa (53° 17.3'N, 03° 50.9'W) | Between 30 April and 1 November |
Dee Estuary | |
All tidal waters enclosed by a line drawn 213° true from Hilbre Point to Mostyn Quay | Between 31 May and 1 October |
Heysham Power Station | |
All tidal waters enclosed by a line drawn 085° true from No. 7 buoy (54° 01.22'N, 002° 56.28'W) to the shore, a line drawn 020° true from No. 7 buoy towards the Dolphin (54° 02.40'N, 02° 55.52'W), and a line drawn 102° true through the leading lights to Heysham Harbour | Between 31 May and 1 October |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: