Search Legislation

The Meters (Certification) Regulations 1998

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

Changes over time for: Paragraph 5

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Meters (Certification) Regulations 1998, Paragraph 5. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Reference conditions for all testingE+W+S

5.—(1) All tests shall be carried out under the reference conditions specified in table 1.

Meter position

(2) The meter position requirement given in table 1 applies to induction meters only. Tolerance applies to a horizontal reference line or edge on the meter, such as the lower edge of the terminal block.

Voltage and current supplies for polyphase meters

(3) When testing polyphase meters—

(a)the order of the phases shall correspond to the sequence shown on the connection diagram;

(b)the voltages shall be balanced so that the voltage between any line and neutral or between any two lines shall not differ by more than 1.5 per cent. from the mean of the corresponding voltages;

(c)the currents shall be balanced so that the current in any conductor shall not differ by more than 2.5 per cent. from the mean of these currents; and

(d)the phase displacement between the current and corresponding phase to neutral voltage shall not differ from other current and voltage phase displacements by more than 3 degrees at any power factor under any load conditions specified in table 2.

External magnetic induction

(4) The test given in table 1 in respect of external magnetic induction shall be carried out during commissioning or after major modification or refurbishing of a meter testing system. The test is carried out at 0.1 Ib unity power factor with the meters normally connected to determine the errors—

(a)for single phase meters, after reversing both current and voltage connections, for which half the difference between the two errors is the value of the variation;

(b)for polyphase meters, by making two additional measurements after each of the connections to the current circuits and to the voltage circuits are changed over 120 degrees but with the phase sequence unaltered, for which the greatest difference between each error determined and the mean of the three errors is the value of the variation.

Dial tests

(5) Where all the errors of repaired meters are determined by the method B or method C test, an additional test in accordance with method A shall be carried out. The method A test shall be carried out at one of the loads used for the method B or method C test. The error obtained by the method A test shall not differ by more than 0.6 per cent. from the error obtained at the same load value by the method B or method C test.

Duration of test

(6) The tests described in paragraph 4 shall continue until the error of meters can be calculated within a tolerance not greater than plus or minus 0.2 per cent.

Conditions for mixing methods of test

(7) The method A test may be used for intermediate and high loads, at unity power factor and at 0.5 power factor, and the method B or method C test for the low load, provided that an additional method B or method C test is carried out at one of the test load values used for the method A test.

Commencement Information

I1Sch. 1 para. 5 in force at 1.8.1998, see reg. 1

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.