- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made).
3. A power-operated, temporarily installed builders' hoist intended for use by persons who are permitted to enter engineering and construction sites, serving:
(i)defined landing levels, having a platform
designed for the transportation of goods only
which permits the access of persons during loading and unloading
which permits the access and travel by authorised persons during erection, dismantling and maintenance
guided
travelling vertical or along a path within 15 degrees maximum of the vertical
supported or sustained by: wire, rope, chain, screwed spindle and nut, rack and pinion, hydraulic jack (direct or indirect), or an expanding linkage mechanism
where masts may or may not require support from separate structures, or
(ii)either one upper landing or a work area extending to the end of the guide (e.g. a roof), having a load-carrying device:
designed for the transportation of goods only
designed that there is no need to step on it for loading or unloading purposes or for maintenance, erection and dismantling
from which persons are prohibited at any time
guided
which is designed to travel at an angle of at least 30 degrees to the vertical but may be used at any angle
sustained by steel wire rope and a positive drive system
controlled by constant pressure type controls
which does not benefit from the use of any counterweight
having a maximum rated load of 300 kg
having a maximum speed of 1 m/s
and where the guides require support from separate structures.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: