For all working conditions the following shall apply:
— Engine speed at 3/4 of maximum speed specified for crane operation mode with a tolerance of±2%.
— Acceleration and deceleration at the maximum value without dangerous movements of the load or the hook block.
— Motions at maximum possible speed as given in the instruction manual under the conditions given.
(a)Hoisting