- Latest available (Revised)
- Original (As adopted by EU)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
This version of this Decision was derived from EUR-Lex on IP completion day (31 December 2020 11:00 p.m.). It has not been amended by the UK since then. Find out more about legislation originating from the EU as published on legislation.gov.uk.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
THE COMMISSION OF THE EUROPEAN COMMUNITIES,
Having regard to the Treaty establishing the European Community,
Having regard to Decision No 574/2007/EC of the European Parliament and of the Council of 23 May 2007 establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’(1), in particular Articles 25, 33(5), 35(6) and 37(4) thereof,
Whereas:
(1) It is necessary to lay down the conditions under which Member States should implement the action under the Fund, in particular to identify under which circumstances the responsible authority may implement projects directly. Further provisions should also be laid down for delegated authorities.
(2) It is necessary to identify a list of procedures and/or practical arrangements that the different designated authorities should lay down and follow for implementation of the Fund.
(3) It is necessary to lay down the obligations which the responsible authorities should have with regard to final beneficiaries in the phase leading to selection and approval of the projects to be funded and with regard to the aspects which should be covered by the verifications of the expenditure declared by the final beneficiary and/or by the partners in the project, including administrative verifications of the applications for reimbursement and on-the-spot verifications of individual projects.
(4) In order to ensure that expenditure under annual programmes can be properly audited, it is necessary to set out the criteria with which audit trails should comply in order to be considered adequate.
(5) The audits of projects and of systems are carried out under the responsibility of the audit authority. To ensure that the audits offer adequate scope and effectiveness and are carried out in accordance with the same standards in all Member States, it is necessary to set out the conditions which the audits should fulfil, including the basis for sampling.
(6) The Member States must submit to the Commission, together with their multiannual programme, a description of their management and control systems. Since this document is one of the principal bases on which the Commission relies, in the context of shared management of the Community budget, to determine whether the financial assistance concerned is used by the Member States in accordance with the applicable rules and principles for protecting the Community's financial interests, it is necessary to set out in detail the information that this document should contain.
(7) In order to harmonise standards for programming, following up the implementation of the Fund, auditing and certifying expenditure, it is necessary to clearly define the contents of the multiannual programme, the annual programme, the progress report, the final report, the applications for payments as well as the audit strategy, the annual audit report, the declaration of validity and the certification of expenditure.
(8) Since Member States are required to report and monitor irregularities and to recover sums wrongly paid in connection with the financing from the Fund, it is necessary to define requirements for the data sent to the Commission.
(9) Experience has shown that citizens of the European Union are insufficiently aware of the role played by the Community in funding programmes. It is therefore appropriate to define in detail the information and publicity measures necessary to bridge this communication and information gap.
(10) In order to guarantee that information on possible funding opportunities is disseminated widely to all interested parties and for the sake of transparency, the minimum measures needed to inform potential final beneficiaries about the financing opportunities offered jointly by the Community and the Member States through the Fund should be set out. In order to enhance transparency about use of the Fund, the list of final beneficiaries, the names of the projects and the amount of public funding allocated to projects should be published.
(11) In the light of Directive 95/46/EC of the European Parliament and of the Council of 24 October 1995 on the protection of individuals with regard to the processing of personal data and on the free movement of such data(2) and Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data(3), it is necessary to provide, in relation to the information and publicity measures and audit work under this Decision, that the Commission and the Member States should prevent any unauthorised disclosure of or access to personal data and to specify the purpose for which the Commission and the Member States may process such data.
(12) Use of electronic means to exchange information and financial data between the Member States and the Commission leads to simplification, increased efficiency, transparency and time savings. In order to capitalise fully on these advantages while preserving the security of exchanges, a common computer system may be established by the Commission.
(13) To ensure efficient implementation of the Fund in the Member States, in accordance with the principles of sound financial management, a series of common rules should be adopted on the eligibility of expenditure from the Fund. In order to reduce the administrative burden on final beneficiaries and designated authorities, flat rates for indirect costs should be eligible under certain conditions.
(14) It is necessary to lay down detailed rules for the implementation of the support to the Special Transit Scheme established by Council Regulation (EC) No 693/2003(4) and Council Regulation (EC) No 694/2003(5).
(15) In accordance with Articles 1 and 2 of the Protocol on the position of Denmark, annexed to the Treaty on European Union and the Treaty establishing the European Community, Denmark is not bound by the present Decision or subject to its application. Given that Decision No 574/2007/EC builds upon the Schengen acquis under the provisions of Title IV of Part Three of the Treaty establishing the European Community, Denmark shall, in accordance with Article 5 of the said Protocol, decide within a period of six months after the date of adoption of that Decision whether it will implement it in its national law.
(16) This Decision constitutes a development of the provisions of the Schengen acquis in which the United Kingdom does not take part, in accordance with Council Decision 2000/365/EC of 29 May 2000 concerning the request of the United Kingdom of Great Britain and Northern Ireland to take part in some of the provisions of the Schengen acquis (6) and the subsequent Council Decision 2004/926/EC of 22 December 2004 on the putting into effect of parts of the Schengen acquis by the United Kingdom of Great Britain and Northern Ireland(7). The United Kingdom is therefore not bound by it or subject to its application.
(17) This Decision constitutes a development of the provisions of the Schengen acquis in which Ireland does not take part, in accordance with Council Decision 2002/192/EC of 28 February 2002 concerning Ireland's request to take part in some of the provisions of the Schengen acquis (8). Ireland is therefore not bound by it or subject to its application.
(18) As regards Iceland and Norway, Decision No 574/2007/EC constitutes a development of provisions of the Schengen acquis within the meaning of the Agreement concluded by the Council of the European Union and the Republic of Iceland and the Kingdom of Norway concerning the association of those two States with the implementation, application and development of the Schengen acquis (9), which fall within the areas referred to in Article 1, points A and B of Council Decision 1999/437/EC of 17 May 1999 on certain arrangements for the application of the Agreement concluded by the Council of the European Union and the Republic of Iceland and the Kingdom of Norway concerning the association of those two States with the implementation, application and development of the Schengen acquis (10).
(19) As regards Switzerland, Decision No 574/2007/EC constitutes a development of the provisions of the Schengen aquis within the meaning of the Agreement signed by the European Union, the European Community and the Swiss Confederation on the latter's association with the implementation, application and development of the Schengen acquis which fall within the areas referred to in Article 4(1) of the Council decision(11) on the signing, on behalf of the European Community, and on the provisional application of certain provisions of this Agreement.
(20) The measures provided for in this Decision are in accordance with the opinion of the Management Committee of the Fund,
HAS ADOPTED THIS DECISION:
1.This Decision lays down rules for implementation of the Fund as regards:
(a)designated authorities;
(b)management and control systems;
(c)information to be provided by the Member States to the Commission regarding use of the Fund;
(d)reporting of irregularities;
(e)information and publicity;
(f)personal data;
(g)electronic exchange of documents.
2.The provisions set out below shall apply without prejudice to Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities' financial interests against fraud and other irregularities(12).
For the purposes of this Decision the following definitions shall apply:
‘basic act’: Decision No 574/2007/EC,
‘Fund’: the External Borders Fund, as established by the basic act,
‘four Funds’: the European Refugee Fund, the External Borders Fund, the European Return Fund and the European Fund for the Integration of third-country nationals, as established by Decision No 573/2007/EC(13), Decision No 574/2007/EC and Decision No 575/2007/EC(14) of the European Parliament and of the Council and Council Decision 2007/435/EC(15) as part of the General programme ‘Solidarity and Management of Migration Flows’,
‘responsible authority’: the body designated by a Member State under Article 27(1)(a) of the basic act,
‘certifying authority’: the body designated by a Member State under Article 27(1)(b) of the basic act,
‘audit authority’: the body designated by a Member State under Article 27(1)(c) of the basic act,
‘delegated authority’: the body designated by a Member State under Article 27(1)(d) of the basic act,
‘designated authorities’: all the authorities designated by a Member State under Article 27 of the basic act,
‘action’: action under the Fund, as those being listed under the specific objectives defined in Article 4 and as defined in Article 6 of the basic act,
‘project’: specific, practical means deployed to implement all or part of an action by the final beneficiaries of grants,
‘final beneficiary’: the legal entity responsible for implementing projects such as NGOs, federal, national, regional or local authorities, other non-profit organisations, private or public-law companies or international organisations,
‘partner in the project’: any legal entity which implements a project in cooperation with a final beneficiary by providing the project with resources and by receiving part of the Community contribution through the final beneficiary,
‘strategic guidelines’: the framework for intervention by the Fund, as adopted by Commission Decision 2007/599/EC(16),
‘priority’: set of actions defined as a priority in the strategic guidelines,
‘specific priority’: set of actions defined as a specific priority in the strategic guidelines, allowing co-financing at a higher rate, in accordance with Article 16(4) of the basic act,
‘primary administrative or judicial finding’: first written assessment by a competent authority, either administrative or judicial, concluding on the basis of specific facts that an irregularity has been committed, without prejudice to the possibility that this conclusion may subsequently have to be revised or withdrawn as a result of developments in the course of the administrative or judicial procedure,
‘irregularity’: any infringement of a provision of Community law resulting from an act or omission by an economic operator which has, or would have, the effect of prejudicing the general budget of the European Union by charging an unjustified item of expenditure to the general budget,
‘suspected fraud’: an irregularity giving rise to the initiation of administrative or judicial proceedings at national level in order to establish the presence of intentional behaviour, in particular fraud, as referred to in point (a) of Article 1(1) of the Convention drawn up on the basis of Article K.3 of the Treaty on European Union, on the protection of the European Communities' financial interests(17),
‘bankruptcy’: insolvency proceedings, as defined in Article 2(a) of Council Regulation (EC) No 1346/2000(18),
‘grant agreement’: an agreement or an equivalent form of legal instrument on the basis of which Member States provide grants to the final beneficiary for the purpose of implementing the project under the Fund.
Member States may designate the same responsible authority, audit authority or certifying authority for two or more of the four Funds.
1.Any delegation of tasks shall comply with the principle of sound financial management, which requires effective and efficient internal control, and shall ensure compliance with the principle of non-discrimination and the visibility of Community funding. No implementing tasks delegated may give rise to conflicts of interest.
2.The scope of the tasks delegated by the responsible authority to the delegated authority and the detailed procedures for implementation of the delegated tasks shall be formally recorded in writing.
The act of delegation shall mention at least:
(a)the references of the relevant Community legislation;
(b)the task entrusted to the delegated authority;
(c)the rights and duties of the delegated authority and the responsibilities it assumes;
(d)the obligation for the delegated authority to put in place and to maintain an organisational structure and a management and control system adapted to performance of its duties;
(e)the assurance to be provided concerning sound financial management and the legality and regularity of the delegated tasks.
3.The handling of communication with the Commission referred to in Article 27(1)(a) of the basic act shall not be delegated. The delegated authority shall communicate with the Commission via the responsible authority.
4.If the delegated authority is not a public administration or a body governed by the private law of the Member State which has a public-service mission, the responsible authority may not delegate to that authority any executive powers which involve a large measure of discretion implying political choices.
5.Delegation of tasks to the delegated authorities shall not affect the liability of the responsible authority, which shall remain answerable for the tasks it has delegated.
6.Where the responsible authority has delegated tasks to the delegated authority, all provisions of this Decision relating to the responsible authority shall apply mutatis mutandis to the delegated authority.
Designated authorities may outsource some of their tasks but they shall remain answerable for the outsourced tasks in accordance with the responsibilities defined in Articles 29, 31 and 32 of the basic act.
In accordance with Article 33(2) of the basic act and having regard to the principle of proportionality, Member States shall establish a manual setting out procedures and practical arrangements regarding:
functioning of the designated authorities;
arrangements ensuring appropriate separation of functions;
where appropriate, monitoring of delegated authorities and other outsourced tasks;
establishment of multiannual and annual programmes;
establishment of audit strategy and annual audit plans;
selection of projects, award of grants and monitoring and financial management of the projects;
management of irregularities, financial corrections and recoveries;
preparation and implementation of audit missions;
preparation of audit reports and declarations;
certification of expenditure;
evaluation of the programme;
reporting to the Commission;
audit trail.
1.For implementation of the Fund, the responsible authority may act as awarding body and/or as executing body.
2.The responsible authority acts as awarding body in cases where it implements the projects, as a general rule, on the basis of annual open calls for proposals.
Neither the responsible authority nor any delegated authority may apply in response to these calls for proposals.
In duly justified cases, including continuation of multiannual projects in accordance with Article 16(6) of the basic act which were selected after a previous call for proposals or in emergency situations, grants may be awarded without a call for proposals.
3.The responsible authority acts as executing body in cases where it decides to implement the projects directly because the characteristics of the projects leave no other choice for implementation, such as de jure monopoly situations or security reasons. In these cases, the rules concerning the final beneficiary shall apply mutatis mutandis to the responsible authority.
1.The reasons which led the responsible authority to act as executing body for implementation of projects shall be identified and communicated to the Commission within the framework of the annual programme concerned.
2.When implementing the projects, the responsible authority shall ensure the principle of value for money and prevent conflicts of interest.
3.The responsible authority may implement the projects identified in accordance with Article 7(3) directly and/or in association with any national authority competent on account of its technical expertise, its high degree of specialisation or its administrative powers. The main national authorities involved in implementation shall also be identified in the annual programme concerned.
4.The administrative decision to co-finance a project under the Fund shall contain the information necessary to monitor the co-financed products and services and to check the expenditure incurred. All relevant provisions laid down for a grant agreement in Article 10(2) shall be specified in an equivalent form of legal instrument.
5.The final report on implementation of the annual programme shall include information on the procedures and practices applied to ensure adequate separation of functions, effective control and satisfactory protection of the European Communities' financial interests and shall provide explanations on how conflicts of interest have been avoided.
6.When the responsible authority is expected to be executing body on a regular basis for projects co-financed by the Fund:
(a)the audit authority shall not be part of the same body as the responsible authority, except when its audit independence is guaranteed and it also reports to another body outside the body of which it and the responsible authority form part;
(b)the tasks of the responsible authority, as defined in Article 29 of the basic act, shall not be affected when the responsible authority also implements projects directly.
7.When a delegated authority is expected to be executing body for projects co-financed by the Fund, this delegated authority may not be the sole final beneficiary of the appropriations which it was delegated to manage.
1.The calls for proposals defined in Article 7(2) shall be published in a way that ensures maximum publicity among potential beneficiaries. [F1Any substantial change to the content of the calls for proposals shall also be published under the same conditions.]
The calls for proposals shall specify:
(a)the objectives;
(b)the selection criteria, which shall comply with Article 16(5) of the basic act, and the relevant supporting documents;
(c)the arrangements for Community and, if applicable, national financing;
(d)the arrangements and final date for submission of proposals.
2.For the purposes of selection of projects and award of grants, the responsible authority shall ensure that potential beneficiaries are informed of the following specific conditions concerning the projects to be implemented:
(a)the eligibility rules for the expenditure;
(b)the time-limit for implementation; and
(c)the financial and other information to be kept and communicated.
Before the award decision is taken the responsible authority shall satisfy itself that the final beneficiary and/or the partners in the project have the capacity to fulfil these conditions.
3.The responsible authority shall ensure that projects awarded grants have been subject to a formal, technical and budgetary analysis and qualitative assessment applying the criteria laid down in the call for proposals. The reasons for rejection of the other projects shall be recorded.
4.Member States shall determine who shall have the power to award projects and shall ensure that conflicts of interest are avoided in all cases and, in particular, when the applicants are national bodies.
5.The award decision shall indicate at least the name of the final beneficiary and/or of the partners in the project, the essential details of the project and its operational objectives, the maximum amount of co-financing from the Fund and the maximum rate of co-financing of the total eligible costs.
6.Written information shall be sent to each applicant on the results of the selection process containing an explanation of the selection decisions. If provided for in national legislation, the relevant review procedure shall be mentioned.
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
1.The responsible authority shall lay down detailed project management procedures covering, inter alia:
(a)signature of grant agreements with selected final beneficiaries;
(b)follow-up of agreements and any amendment thereto by establishing a system for administrative monitoring of projects (exchange of correspondence, issuing and monitoring amendments and reminder letters, receipt and processing of reports, etc.).
2.The grant agreements shall lay down, inter alia:
(a)the maximum amount of the grant;
(b)the maximum percentage of the Community contribution in accordance with Article 16(4) of the basic act;
(c)a detailed description and timetable of the project supported;
(d)if applicable, the part of the tasks and related costs that the final beneficiary intends to subcontract to third parties;
(e)the agreed forward budget and financing plan for the project, including the fixed percentage of indirect costs as defined in Annex XI regarding the rules on eligibility of expenditure;
(f)the timetable and provisions for implementation of the agreement (reporting obligations, amendments and termination);
(g)the operational objectives of the project and the indicators to be used;
(h)the definition of eligible costs;
(i)the conditions relating to payment of the grant and bookkeeping requirements;
(j)the conditions relating to audit trail;
(k)the relevant provisions relating to data protection;
(l)the relevant provisions relating to publicity.
3.If appropriate, the final beneficiaries shall ensure that all partners in the project are subject to the same obligations as them. The partners shall engage their responsibility through the final beneficiary which remains answerable, in last resort, for the respect of the contractual conditions by itself and all partners in the project.
The final beneficiaries shall keep certified copies of the accounting documents justifying income and expenditure incurred by the partners in relation to the project concerned.
4The grant agreements shall provide expressly for the Commission and the Court of Auditors to exercise their powers of control, based on documents and on the premises, over all final beneficiaries, partners in the project and subcontractors.
When awarding contracts for the implementation of the projects, the State, regional or local authorities, bodies governed by public law, associations formed by one or several of such authorities or several of such bodies governed by public law shall act in accordance with the applicable Union and national public procurement law and principles.
Entities other than those referred to in the first paragraph shall award contracts for the implementation of the projects following appropriate publicity in order to ensure compliance with the principles of transparency, non-discrimination and equal treatment. Contracts with a value of less than EUR 100 000 may be awarded provided the concerned entity requests at least three offers. Without prejudice to national rules, contracts with a value of less than EUR 5 000 shall not be subject to any procedural obligations.]
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
For calculation of the final payment to the final beneficiary, the total Community contribution to each project shall be the lowest of the following three amounts:
the maximum amount stated in the grant agreement;
the maximum co-financing resulting from multiplication of the total eligible costs of the project concerned by the percentage laid down in Article 16(4) of the basic act (i.e. 50 % or 75 %); and
the amount resulting from application of the principle of non-profit, as defined in point I.3.3 of Annex XI.
1.Technical assistance at the initiative of the Commission, as defined in Article 17 of the basic act, may be financed up to 100 % by the Fund.
2.Technical assistance at the initiative of the Member States, as defined in Article 18 of the basic act, may be financed up to 100 % by the Fund.
3.Technical assistance at the initiative of the Commission or the Member States may take the form of procurement contracts, expert fees and/or any administrative expenditure subject to the eligibility rules defined in Part III, Chapter 1.
1.When one or more designated authorities are common to two or more of the four Funds, the appropriations for the technical assistance expenditure on each of the annual programmes concerned may be merged, partly or entirely.
2.The expenditure on technical assistance shall be allocated between the Funds concerned, preferably on the basis of simple and representative apportionment formulae. Application of the formulae shall not lead to any increase in the maximum amount of technical assistance expenditure on each annual programme concerned.
1.The verifications to be carried out by, or under the responsibility of, the responsible authority under Article 29(1)(g) of the basic act shall cover administrative, financial, technical and physical aspects of projects, as appropriate.
The verifications shall ensure that the expenditure declared is real and justified for the purpose of the project, that the projects granted have been delivered in accordance with the grant agreements, that the Community contribution complies with the rules, in particular regarding the financing structure defined in Article 16 of the basic act, that the applications for reimbursement by the final beneficiary are correct and that the projects and expenditure comply with Community and national rules and avoid double-financing of expenditure with other Community or national schemes and with other programming periods.
Moreover, the verifications shall include:
(a)administrative and financial verifications of each application for reimbursement sent by the final beneficiaries;
(b)verifications, at least on a representative sample of the supporting documents covering all headings of the budget annexed to the grant agreement, of the relevance, accuracy and eligibility of the expenses, income and costs covered by assigned income declared by the final beneficiaries;
(c)on-the-spot verifications of individual projects, at least on a sample representing an appropriate mix of types and sizes of projects and taking account of any risk factors already identified, in order to achieve reasonable assurance as to the legality and regularity of the underlying transactions, having regard to the level of risk identified by the responsible authority.
The verifications indicated in points (a) and (b) do not have to be carried out if an obligation is imposed on the final beneficiary to provide an audit certificate from an independent auditor which covers all the aspects mentioned in points (a) and (b).
2.Records shall be kept of each verification, stating the work performed, the date, the results and the measures taken in response to errors detected. The responsible authority shall ensure that all the supporting documents regarding the verifications performed are kept available for the Commission and the Court of Auditors for a period of five years following closure of the project. This period shall be interrupted in the event of legal proceedings or at the duly substantiated request of the Commission.
3.Where the responsible authority acts as executing body under the annual programme, as defined in Article 7(3), the verifications referred to in paragraph 1 shall be implemented in accordance with the principle of adequate separation of functions.
1.For the purposes of Article 29(1)(k) of the basic act, an audit trail shall be considered adequate if it complies with the following criteria:
(a)it permits reconciliation of the amounts certified to the Commission with the detailed accounting records and supporting documents held by the certifying authority, responsible authority, delegated authorities and final beneficiaries on projects co-financed under the Fund;
(b)it permits verification of payment of the public contribution to the final beneficiary, of allocation and transfer of the Community funding granted under the Fund and of the sources of co-financing of the project;
(c)it permits verification of application of the selection criteria established for the annual programme;
(d)it contains in respect of each project, as appropriate, the technical specifications and financing plan, documents concerning grant approval, documents relating to public procurement procedures and reports on the verifications and audits carried out.
2.The responsible authority shall ensure that a record is kept of the location of all documents relating to specific payments made under the Fund.
1.The audits referred to in Article 32(1)(a) and (b) of the basic act shall be carried out on the management and control systems established by the Member States and on a sample of projects selected by a method approved by the audit authority.
The sampling method shall:
(a)include an appropriate mix of types and sizes of projects;
(b)take account of any risk factors which have been identified by national or Community controls and the cost-benefit aspects of the verifications.
The sample shall also include projects implemented by the responsible authority acting as executing body at least on a proportional basis.
The method used to select the sample shall be documented.
2.The audit on the management and control systems shall cover each of the following processes at least once before 2013: programming, delegation of tasks, selection and award, monitoring of the projects, payment, certification of expenditure, reporting to the Commission, detection and treatment of potential irregularities and evaluation of the programmes.
3.The audits of projects shall be carried out on the spot on the basis of documentation and records held by the final beneficiary and/or the partners in the project. The audits shall verify that:
(a)the project meets the selection criteria for the annual programme, has been implemented in accordance with the grant agreement and fulfils any applicable conditions concerning its functionality and use or the objectives to be attained;
(b)the expenditure declared corresponds to the accounting records and supporting documents held by the final beneficiary and/or by the partners in the project, and those records correspond to the supporting documents kept by the responsible authority or any delegated body;
(c)the items of expenditure correspond to the eligibility requirements set out in Annex XI, to the requirements specified during the national selection procedure, to the terms of the grant agreement and to the works actually carried out and, where appropriate, to other Community and national rules;
(d)the use or intended use of the project is consistent with the objectives, action or measures set out in Articles 3, 4, 5, 6 and 18 of the basic act;
(e)the public or private contribution has been paid to the final beneficiary in accordance with Article 16(2) of the basic act;
(f)there is an adequate audit trail;
(g)there are no conflicts of interest and good value for money has been achieved, in particular in cases where the responsible authority acts as executing body of the project.
4.Only expenditure within the scope of an audit carried out under paragraph 3 shall be counted towards the amount of expenditure audited for the purpose of Article 32(1)(b) of the basic act. If the audit is performed before the project has been closed, only the expenditure actually audited is taken into account to calculate the coverage rate.
5.Where problems detected appear to be systemic in nature and may therefore entail a risk to other projects, the audit authority shall ensure that further examination is carried out, including additional audits where necessary, to establish the scale of such problems. The necessary preventive and corrective measures shall be taken by the relevant authorities.
6.The audit authority shall draw conclusions on the basis of the results of the audits relating to expenditure declared to the Commission and shall communicate the conclusions to the Commission in the annual audit report. In annual programmes for which the error rate is above the materiality level of 2 % of the Community contribution, the audit authority shall analyse the significance of this error and take the necessary measures, including making appropriate recommendations, which shall be communicated at least in the annual audit report.
1.In cases where the audit authority gives a qualified opinion or an adverse opinion on the functioning of the management and control system, the certifying authority shall verify that this information has been sent to the Commission. It shall also ensure that an adequate action plan has been implemented by the responsible authority to restore effectively functioning management and control systems and to assess the impact of the malfunctioning on the declaration of expenditure.
2.If the request for payment or statement of reimbursement is not validated by the audit authority for the final report on implementation of the annual programme, the certifying authority shall ensure that a correct request for payment or statement of reimbursement is established without delay.
1.Pursuant to Article 10(2) of the basic act, the extent to which the information available to a Member State on use of the Fund is transmitted to the Commission in the documents referred to in this chapter may be proportionate to the amount of the Community contribution allocated to the Member State concerned and, where appropriate, this information may be provided in summarised form.
2.However, upon a request from the Commission, the Member State shall nevertheless provide more detailed information. The Commission may request this information if it appears necessary in order for the Commission to fulfil effectively its obligations under the basic act and the Financial Regulation.
1.The description of the management and control systems referred to in Articles 33(4) and 34(2) of the basic act shall be submitted in accordance with the model in Annex I.
2.The responsible authority shall validate the description of the systems implemented by any delegated authority. Each of the designated authorities shall confirm the accuracy of the description of the management and control systems which concerns it. In addition, the audit authority shall also confirm the completeness of the description.
3.When examining the description, the Commission may request clarifications and propose measures to comply with the provisions defined in the basic act. If necessary, on-site visits may be carried out by Commission officials or authorised Commission representatives.
4.If the responsible authority is the same for two or more of the four Funds or where common systems apply to two or more of the Funds, a description of the common management and control systems may be submitted highlighting, where appropriate, any specific features.
[F11. The responsible authority shall notify the Commission by formal letter of any substantial change in the management and control system and shall send a revised description of the management and control system to the Commission as soon as possible and at the latest at the time any such change takes effect.]
2.Substantial changes are changes which are likely to have an impact on the separation of functions, on the effectiveness of selection, award, control and payment mechanisms and on communication with the Commission. They shall include, in particular, changes in one of the designated authorities, in the accounting system and in the payment and certification processes.
3.Revision of the management and control systems shall follow the same procedure as laid down in Article 20.
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
1.Member States shall submit to the Commission a multiannual programme, as referred to in Article 21 of the basic act, in accordance with the model in Annex II.
2.Member States shall submit to the Commission the annual programmes, as referred to in Article 23 of the basic act, in accordance with the model in Annex III.
3.The financial plans linked to the multiannual programme shall present a breakdown of the budgeted amounts by priority, as defined in the strategic guidelines.
The financial plans linked to the annual programmes shall present a breakdown of the budgeted amounts by category of action, as defined in Article 3(1) of the basic act, with a reference to the priorities.
[F21. In order to revise the annual programme approved by the Commission pursuant to Article 23(4) of the basic act, the Member State concerned shall submit a revised draft annual programme to the Commission at the latest three months before the end of the eligibility period. The Commission shall examine and, as soon as possible, approve the revised programme in accordance with the procedure laid down in Article 23(4) of the basic act.]
2.Changes to the financial breakdown without revision of the annual programme pursuant to paragraph 1 shall not exceed 10 % of the total contribution from the Fund and shall be allowed only in circumstances justified by causes beyond the control of the responsible authority. An adequate explanation of any such changes shall be provided in the progress report and/or in the final report on the implementation of the annual programme.
Textual Amendments
F2 Substituted by Commission Decision of 10 July 2009 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States' management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document number C(2009) 5373) (Only the Bulgarian, Czech, Danish, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2009/538/EC).
1.Member States shall submit to the Commission the progress reports on implementation of the annual programme and payment requests, as referred to in Article 41(4) of the basic act, in accordance with the model in Annex IV.
2.Member States shall submit to the Commission the final reports on implementation of the annual programme and payment requests, as referred to in Article 42(1)(b) of the basic act, in accordance with the model in Annex V.
[F13. The financial tables linked to the progress reports and final reports shall present a breakdown of the amounts both by priority and by specific priority, as defined in the strategic guidelines.]
[F44. With reference to Article 41(3) and (4) of the basic act, the cumulative total of pre-financing payments made to a Member State shall not exceed 90 % of the total amount allocated to such Member State in the financing decision approving the annual programme.
Where a Member State has nationally committed less than the total amount allocated by the financing decision approving the annual programme, the cumulative total of the pre-financing payments shall not exceed 90 % of the nationally committed amount.]
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
F3 Substituted by Commission Decision of 8 February 2010 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2010) 694) (Only the Bulgarian, Czech, Danish, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2010/69/EU).
F4 Inserted by Commission Decision of 8 February 2010 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2010) 694) (Only the Bulgarian, Czech, Danish, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2010/69/EU).
1.The audit strategy referred to in Article 32(1)(c) of the basic act shall be established in accordance with the model in Annex VI.[F5Any changes to the audit strategy submitted in respect of Article 32(1)(c) of the basic act and accepted by the Commission shall be sent to the Commission as soon as possible. The revised audit strategy shall be established in accordance with the model in Annex VI, marking the revisions introduced.]
[F12. Except when each of the last two annual programmes adopted by the Commission corresponds to an annual Community contribution of less than EUR 1 million, the audit authority shall submit an annual audit plan before 15 February each year, as from 2010. The audit plan shall be established in accordance with the model in Annex VI. Member States are not required to resubmit the audit strategy when submitting the annual audit plans. In the case of a combined audit strategy, as provided for in Article 32(2) of the basic act, a combined annual audit plan may be submitted.]
3.The audit report and the opinion referred to in Articles 32(3)(a) and 32(3)(b) of the basic act shall be based on the systems audits and audits of projects carried out in accordance with the audit strategy and shall be drawn up in accordance with the models in Annexes VII.A and VII.B.
4.The validity declaration referred to in Article 32(3)(c) of the basic act shall be based on all the audit work carried out by the audit authority and on additional checks, if necessary. The validity declaration shall be drawn up in accordance with the model in Annex VII.C.
5.If there is any limitation on the scope of the examination or if the level of irregular expenditure detected does not allow provision of an unqualified opinion for the annual opinion referred to in Article 32(3)(b) of the basic act or in the declaration referred to in point (c) of the same Article, the audit authority shall give the reasons and estimate the scale of the problem and its financial impact.
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
F5 Inserted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
1. The certification relating to the request for a second pre-financing payment referred to in Article 41(4) of the basic act shall be drawn up by the certifying authority and transmitted by the responsible authority to the Commission in the format in Annex VIII.
2. The certification relating to the request for a final payment referred to in Article 42(1)(a) of the basic act shall be drawn up by the certifying authority and transmitted by the responsible authority to the Commission in the format in Annex IX.]
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
1.In accordance with the models in Annexes IV and V, Member States shall report to the Commission any irregularity which has been the subject of a primary administrative or judicial finding in the progress or final reports on implementation of the annual programmes.
The report shall indicate:
(a)the Fund, the annual programme and the project concerned;
(b)the provision which has been infringed;
(c)the date and the source of the first information leading to suspicion that an irregularity has been committed;
(d)the practices employed in committing the irregularity;
(e)where appropriate, whether the practice gives rise to a suspicion of fraud;
(f)the manner in which the irregularity was discovered;
(g)the amount of the Community contribution concerned.
However, the following cases need not be reported, except in cases of suspected fraud:
(a)cases where the irregularities relate to amounts of less than 10 000 euros chargeable to the general budget of the European Communities;
(b)cases where the irregularity consists solely of failure to implement, in whole or in part, a project included in the annual programme owing to the bankruptcy of the final beneficiary;
(c)cases brought to the attention of the responsible authority by the final beneficiary voluntarily and before detection by the responsible authority, whether before or after payment of the public contribution;
(d)cases detected and corrected by the responsible authority before any payment of the public contribution to the final beneficiary and before inclusion of the expenditure concerned in a declaration of expenditure submitted to the Commission.
2.At the request of the Commission, Member States shall in all cases give further details concerning:
(a)where appropriate, the other Member States and third countries involved;
(b)the period during which, or the moment at which, the irregularity was committed;
(c)the national authorities or bodies which drew up the official report on the irregularity and the authorities responsible for the administrative or judicial follow-up;
(d)the date on which the primary administrative or judicial finding on the irregularity was established;
(e)the identity of the natural and legal persons involved or of any other participating entities, except where this information is irrelevant for the purposes of combating irregularities, given the nature of the irregularity concerned;
(f)the total budget and the public contribution approved for the project and the distribution of its co-financing between the Community and national contributions;
(g)the amount of the public contribution affected by the irregularity and the corresponding Community contribution at risk;
(h)where no payment of the public contribution referred to under point (g) has been made to the persons or other entities identified, the amounts which would have been unduly paid had the irregularity not been identified;
(i)the suspension of payments, where applicable, and the possibilities of recovery;
(j)the nature of the irregular expenditure.
3.Where some of the information referred to in paragraph 2, in particular on the practices employed in committing the irregularity and on the manner in which the irregularity was discovered, is not available, Member States shall as far as possible supply the missing information when forwarding subsequent reports of irregularities to the Commission.
1.Member States shall inform the Commission, with reference to any previous report made under Article 27, of the procedures instituted with respect to all irregularities previously notified and of significant changes resulting from them. This information shall be given in the progress reports or final reports on implementation of the annual programmes in accordance with the models in Annexes IV and V.
The report shall indicate the amounts which have been, or are expected to be, recovered.
2.At the request of the Commission, Member States shall in all cases give further details concerning:
(a)any interim measures taken by Member States to safeguard recovery of sums unduly paid;
(b)any judicial and administrative procedures instituted with a view to recovering sums unduly paid and to imposing sanctions;
(c)the reasons for any abandonment of recovery procedures;
(d)the reasons for any abandonment of criminal prosecutions.
Member States shall report to the Commission all administrative or judicial decisions terminating such procedures, or the main points thereof, and shall state, in particular, whether or not the findings are such that fraud is suspected.
1.The Commission shall maintain appropriate contacts with the Member States concerned for the purpose of supplementing the information supplied on the irregularities referred to in Article 27 and on the procedures referred to in Article 28 on the possibility of recovery.
2.Independently of the contacts referred to in paragraph 1, the Commission shall inform Member States in cases where the nature of the irregularity is such as to suggest that identical or similar practices could occur in other Member States.
1.The Commission may use any information of a general or operational nature communicated by Member States under this Decision to perform risk analyses and may, on the basis of the information obtained, produce reports and develop early-warning systems serving to identify risks more effectively.
2.The Commission shall regularly inform the Member States concerned of the use made of information under paragraph 1.
1.The responsible authority shall ensure that the key indications regarding the multiannual and annual programmes are disseminated widely, with details of the financial contributions concerned, and that they are made available to all interested parties.
However, the responsible authority may decide to keep confidential the internal management arrangements laid down in the multiannual programme or in the annual programmes and any other information relating to implementation of the Fund on grounds of public security.
2.The responsible authority shall provide potential final beneficiaries with at least the following information:
(a)the conditions of eligibility to be met in order to qualify for financing under an annual programme;
(b)a description of the procedures for examining applications for funding and of the time periods involved;
(c)the criteria for selecting the projects to be financed;
(d)the contacts who can provide information on the annual programmes.
In addition, the responsible authority shall inform potential final beneficiaries of the publication provided for in Article 33(2)(b).
The responsible authority shall inform final beneficiaries that acceptance of funding also implies acceptance of their inclusion on the list of final beneficiaries published in accordance with Article 33(2)(b).
1.The responsible authority shall ensure that information and publicity measures are implemented with the aim of the widest possible media coverage using various forms and methods of communication at the appropriate territorial level.
2.The responsible authority shall organise at least the following information and publicity measures:
(a)at least one information activity a year, presenting, as of 2008, the launch of the multiannual programme or the achievements of the annual programme(s);
(b)annual publication, at least on a website, of the list of final beneficiaries, the names of the projects and the amount of public and Community funding allocated to them. The address of the website shall be communicated to the Commission.
1.The final beneficiary shall be responsible for informing the public, by means of the measures laid down in paragraphs 2, 3 and 4, about the assistance obtained from the Fund.
2.The final beneficiary shall put up a permanent prominent plaque of significant size no later than three months after completion of any project that fulfils the following conditions:
(a)the total Community contribution to the project exceeds EUR 100 000; and
(b)the operation consists of purchasing a physical object or of financing infrastructure or construction projects.
The plaque shall state the type and name of the project. In addition, the information referred to in Article 35 shall take up at least 25 % of the plaque.
3.Where a project receives funding under an annual programme co-financed by the Fund, the final beneficiary shall ensure that those taking part in the project have been informed of that funding.
4.Any document, including any attendance or other certificate, concerning such projects shall include a statement indicating that the project is co-financed by the Fund.
All information and publicity measures aimed at final beneficiaries, potential final beneficiaries and the general public shall include:
the emblem of the European Union, in accordance with the graphic standards indicated in Annex X, and a reference to the European Union;
a reference to the Fund;
a statement chosen by the responsible authority, highlighting the added value of the contribution from the Community.
For small promotional items or for promotional items linked to two or more of the four Funds, points 1 and 3 shall not apply.
1.Member States and the Commission shall take all necessary measures to prevent any unauthorised disclosure of, or illegitimate access to, the information referred to in Article 29(1)(h) of the basic act, information collected by the Commission in the course of its on-the-spot checks and the information referred to in Chapter 4.
2.The information referred to in Chapter 4 may not be sent to persons other than those in the Member States or within the Community institutions whose duties require that they have access to it, unless the Member State supplying such information has expressly agreed so.
In addition to the duly signed paper versions of the documents referred to in Chapter 3, the information shall also be sent by electronic means.]
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
1.If the Commission develops a computer system for secure data exchange between the Commission and each Member State for implementation of the Fund, the Member States shall be informed of and, at their request, involved in development of any such computer system.
2.The Commission and the designated authorities, along with the bodies to which the tasks have been delegated, shall record the documents referred to in Chapter 3 in the computer system mentioned in paragraph 1.
3.In addition, Member States may be invited voluntarily to provide information referred to in Articles 27 and 28 using the existing specific system managed by the Commission for collecting the irregularities detected under the Structural Funds.
4.Any costs of an interface between the common computer system and national, regional and local computer systems and any costs of adapting national, regional and local systems to the technical requirements of the common system shall be eligible under Article 18 of the basic act.
1.The rules set out in Annex XI shall be used to determine the eligibility of expenditure of actions financed under the annual programmes referred to in Article 37(4) of the basic act.
2.These rules are applicable to the final beneficiaries and shall apply mutatis mutandis to the project partners.
3.Member States may apply national eligibility rules that are more rigorous than those laid down in this decision.
It shall be for the Commission to evaluate whether the applicable national eligibility rules comply with this condition.
1.The support for the implementation of the Special Transit Scheme referred to in Article 6 of the basic act shall be established in the framework of the multiannual programme of the Republic of Lithuania and be implemented on the basis of the annual programmes of the Republic of Lithuania.
Consequently, the rules in the basic act and this Decision regarding the implementation of annual programmes shall apply mutatis mutandis to the support for the implementation of the Special Transit Scheme. The fund shall bear any additional cost incurred in implementing the specific provision of the acquis covering such transit.
2.For each annual programme the amount to be allocated to this support shall be set in accordance with Article 6 of the basic act and within the limits of the appropriations set out in Article 14(12) of the basic act.
3.With regard to the foregone fees, the action shall run from 1 January of the year referred to in the financing decision approving the annual programme until 31 December of that year.
With regard to the additional costs, the action shall run from 1 January of the year referred to in the financing decision approving the annual programme:
(a)for salaries of the staff specifically implementing the Special Transit Scheme until 31 December of that year;
[F1(b) for all other additional costs, until 30 June of the year N (19) +2.]
4.The amount to be allocated to this support under each annual programme shall not be used for other action.
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
This Decision is addressed to the Kingdom of Belgium, the Republic of Bulgaria, the Czech Republic, the Federal Republic of Germany, the Republic of Estonia, the Hellenic Republic, the Kingdom of Spain, the French Republic, the Italian Republic, the Republic of Cyprus, the Republic of Latvia, the Republic of Lithuania, the Grand Duchy of Luxembourg, the Republic of Hungary, the Republic of Malta, the Kingdom of the Netherlands, the Republic of Austria, the Republic of Poland, the Portuguese Republic, Romania, the Republic of Slovenia, the Slovak Republic, the Republic of Finland and the Kingdom of Sweden.
initial version
revised version (number, date dd/mm/year) following dialogue with the Commission
version revised for other reasons
MEMBER STATE:
FUND(S):
MAIN CONTACT POINT:
THE INFORMATION PROVIDED DESCRIBES THE SITUATION ON:
If not, indication of the date when they will be operational
Guidance for sections 2-4
First part of each table
The description of the processes should include the tasks to be carried out by each of the designated authorities (or bodies under their responsibility) and the interaction between them. The description should be concise but nevertheless allow a clear understanding of how the processes would work in practice.
Second part of each table
The checklist should be completed by indicating whether each target has been achieved or not and providing any relevant information. If the target has not been achieved, please provide an explanation and, if relevant, indicate the expected date for completion.
If procedures are formalised, a reference to the document should be included.
2.1. Designation and supervision of the designated authorities | |||
---|---|---|---|
Short description of the process of setting up each of the designated authorities[The description should include all authorities] | |||
Key targets | Achieved? | Comments | |
1 | Rules governing the relations of the Member State with the designated authorities identify the respective responsibilities | Y/N | |
2 | Member State have provided guidance to the designated authorities to ensure sound financial management (through training and/or manuals) | Y/N | |
3 | Each authority will inform their staff of the mission statement of the organisation as well as their job description and expected results | Y/N | |
4 | Steps have been taken to ensure that the different authorities are adequately staffed in terms of numbers, seniority and experience in order to carry out their functions | Y/N |
2.2. Separation of functions | |||
---|---|---|---|
Short description of the arrangements defined to ensure a proper separation of functions[The description should include all authorities] | |||
Key targets | Achieved? | Comments | |
1 | Rules are defined to ensure a proper separation of functions between actors within the responsible authority for the signature of contracts/grant agreements | Y/N | |
2 | Rules are defined to ensure a proper separation of functions between actors within the responsible authority for the initiation, verification and approval of financial transactions | Y/N | |
3 | The audit authority will be functionally independent of the responsible authority and the certifying authority. | Y/N | |
4 | The certifying authority will not be involved in the selection, implementation and financial transactions related to Community resources | Y/N |
2.3. Monitoring of delegated authority(ies) — if applicable | |||
---|---|---|---|
Short description of the process[This description should include the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | The tasks to be delegated are clearly defined | Y/N | |
2 | Procedures are established concerning the delegated tasks and their compliance with the rules defined in the basic act/implementing rules has been checked | Y/N | |
3 | Supervisory controls will take place to ensure that the tasks are carried out according to established procedures | Y/N |
2.4. Monitoring of other tasks not carried out by the authorities themselves — if applicable | |||
---|---|---|---|
Short description of the process[This description should include all authorities] | |||
Key targets | Achieved? | Comments | |
1 | In case of bodies acting under the responsibility of the responsible authority (and not considered as delegated authorities), supervisory mechanisms are in place to ensure sound financial management | Y/N | |
2 | In case of outsourcing of audit activities and in case of bodies acting under the responsibility of the audit authority, supervisory mechanisms are in place to ensure a common audit methodology and consistency of the audit work | Y/N | |
3 | In case of outsourcing of certifying activities and in case of bodies acting under the responsibility of the certifying authority, supervisory mechanisms are in place to ensure a common approach to certification | Y/N | |
4 | In case of outsourcing to private bodies without a public-service mission, mechanisms are defined to ensure that the tasks which may be entrusted do not include the exercise of public authority or require the use of discretionary powers of judgment | Y/N |
3.1. Establishing multiannual programmes | |||
---|---|---|---|
Short description of the process[This description should include the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | Arrangements are foreseen to ensure the implementation of the principle of partnership in accordance with current national rules and practices | Y/N | |
2 | Procedures are defined to check that the multiannual programme is consistent with the strategic guidelines and complies with Community law, in particular with Community law aiming at ensuring the free movement of persons in conjunction with the directly related flanking measures with respect to external border controls, asylum and immigration | Y/N | |
3 | The multiannual programme will be approved by a duly authorised person | Y/N |
3.2. Establishing annual programmes | |||
---|---|---|---|
Short description of the process[This description should include the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | Procedures are established to ensure:
| Y/N | |
2 | Procedures are established to enable the revision of an annual programme in case of duly substantiated emergency situations as described in the basic act, if applicable | Y/N | |
3 | Procedures are established to enable the submission of a revision of an annual programme when required under Article 23(1) of this decision | Y/N | |
4 | Any modification to the financial breakdown of an annual programme and the reasons for it is documented | Y/N | |
5. | Any modification in the implementation of the annual programme not relating to the financial breakdown (e.g. on nature and timing of the calls for proposals or the scope of technical assistance) and the reason for it is documented | Y/N |
3.3. Establishing the audit strategy and the annual audit plans | |||
---|---|---|---|
Short description of the process[This description concerns the audit authority] | |||
Key targets | Achieved? | Comments | |
1 | Rules are defined to ensure a transparent and appropriate communication from the responsible authority to the audit authority on management procedures implemented and on projects prior to and throughout the programming period | Y/N | |
2 | Procedures are established to define annual audit plans (to be annexed each year to the audit strategy) and to send them to the Commission in time (if applicable) | Y/N | |
3 | The audit strategy and the annual audit plans are approved by a duly authorised person | Y/N |
3.4. Responsible authority acting as an executing body — if applicable | |||
---|---|---|---|
Short description of the reasons leading the responsible authority to implement projects directly and the specific arrangements foreseen to strengthen the management and control systems[This description should include all authorities] | |||
Key targets | Achieved? | Comments | |
1 | The justification of the need for the responsible authority to implement projects will be documented and endorsed at the appropriate level | Y/N | |
2 | Specific arrangements are put in place to ensure that the nature and the objectives of the projects comply with the provisions defined for the Fund | ||
3 | Specific arrangements are put in place in order to prevent conflict of interest for the projects implemented by the responsible authority | Y/N | |
4 | Specific arrangements are put in place to ensure the principle of value for money is respected in the implementation of projects by the responsible authority | Y/N | |
5 | Procedures are defined to ensure that the contractual terms governing these projects are clear and complete in particular with regard to the financing conditions, the payment terms, the eligibility rules and the obligations regarding operational and financial reporting | Y/N | |
6 | Specific arrangements are put in place in order to ensure that the main functions of the responsible authority as provided for in the basic act are not affected in relation to the projects implemented by the responsible authority | Y/N | |
7 | When the responsible authority acts as an executing body, the audit authority is located in another body than the responsible authority (if not, please describe the additional guarantees put in place to ensure the proper independence of the audit authority) | Y/N | |
8 | The audit strategy will cover the specific risks which may be related to the implementation of projects by the responsible authority | Y/N |
3.5. Selection and implementation of the projects (Responsible authority acting as an awarding body) | |||
---|---|---|---|
Short description of the process[This description should include the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | In the case of call for proposals (or tenders), rules are defined to ensure open competition and adequate publicity | Y/N | |
2 | Selection criteria will comply with the minimum criteria defined in the basic act | Y/N | |
3 | Procedures are defined for the receipt of proposals (or tenders) | Y/N | |
4 | Procedures are defined to ensure that the proposals (or tenders) are assessed against the predefined rules and criteria in a transparent and non-discriminatory manner | Y/N | |
5 | The award decisions and the contracts/grant agreements will be approved by a duly authorised person | Y/N | |
6 | Procedures are defined to ensure adequate ex-post information on the results of the selection process to the applicants | Y/N | |
7 | Procedures are defined to ensure the monitoring of the implementation of grant agreements/contracts according to the contractual terms | Y/N |
3.6. Monitoring of the projects implemented by the final beneficiaries | |||
---|---|---|---|
Short description of the process[This description should include the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | Key operational and financial indicators will be established, monitored and communicated to the responsible authority for each project | Y/N | |
2 | On-the-spot verifications by the responsible authority are foreseen to allow monitoring (of both the operational and financial aspects) of the projects | Y/N | |
3 | The responsible authority will ensure that final beneficiaries make use of an appropriate accounting system in computerised form | Y/N | |
4 | The responsible authority will ensure that final beneficiaries implement the provisions on the visibility of the EU funding | Y/N |
3.7. Financial management of the project | |||
---|---|---|---|
Short description of the process[involves the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | Financial transactions will be approved by duly authorised persons | Y/N | |
2 | Prior to making any payments/recoveries, verifications will be carried out in particular in order to monitor:
| Y/N | |
3 | Verifications will be carried out in order to have a reasonable assurance of the legality and regularity of the underlying transactions | Y/N | |
4 | Supervisory controls will be carried out throughout the programming period to ensure that the established financial procedures are respected | Y/N | |
5 | Verifications will be performed on the complementarity with other Community financial programmes in order to avoid double funding | Y/N |
3.8. Irregularities, corrections and recoveries | |||
---|---|---|---|
Short description of the process[This description should include the responsible authority, the delegated authority(ies) and the certifying authority] | |||
Key targets | Achieved? | Comments | |
1 | Definitions of irregularities are established and comply with the Community requirements | Y/N | |
2 | Mechanisms are in place to ensure that irregularities can be detected in due time and immediate corrective measure are taken | Y/N | |
3 | Procedures are in place to ensure that the Commission is kept informed of irregularities detected, and if appropriate, of any corrective measures taken in accordance with the obligations set out in this decision | Y/N | |
4 | Procedures are in place to ensure a proper follow-up of recovery orders issued and, if applicable, of default interest | Y/N | |
5 | In case recovery orders cannot be cashed in, causes will be identified to evaluate whether Member States should reimburse the funds to the Community Budget or not | Y/N |
3.9. Preparation and implementation of audit missions | |||
---|---|---|---|
Short description of the process[This description should include the audit authority and, as potential auditees, the responsible authority and the delegated authority(ies) and, as recipient of the conclusions, the certifying authority] | |||
Key targets | Achieved? | Comments | |
1 | The audit practice is in line with internationally accepted standards | Y/N | |
2 | An audit manual is established for use by the auditors on the basis of the requirements defined in the basic act | Y/N | |
3 | Audits will be carried out to verify the effective functioning of the management and control systems | Y/N | |
4 | The checks to be carried on the eligible expenditure will be based on an appropriate sample, and will consist of at least 10 % of eligible expenses | Y/N | |
5 | The verifications on eligible expenses will verify at least the compliance, effectiveness and efficiency of the following elements: selection procedure, objectives of the project, reality of the achievements, eligibility of the expenses, valid supporting documents for the expenses, national co-financing, audit trail | Y/N | |
6 | A follow-up of earlier recommendations will take place on a regular basis | Y/N | |
7 | The projects implemented by the responsible authority will be subject to robust scrutiny | Y/N |
3.10. Audit report on annual programmes and related declarations | |||
---|---|---|---|
Short description of the process[This description should involved the audit authority] | |||
Key targets | Achieved? | Comments | |
1 | Procedures are established to consolidate the conclusions of the systems audit and the audit of projects for each annual programme | Y/N | |
2 | Checks will be performed to assess the validity of the requests for payment | Y/N | |
3 | Further examination will be launched in case of systemic errors or errors over the materiality threshold are detected | Y/N | |
4 | The report and the related declarations will be approved by a duly authorised person | Y/N |
3.11. Certification of expenditure | |||
---|---|---|---|
Short description of the process[involves primarily the certifying authority but also the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | Procedures are established to ensure that the necessary information is received from the responsible authority for the purpose of certification | Y/N | |
2 | Procedures are established to ensure that the audit report on each annual programme and the related declarations are received from the audit authority | Y/N | |
3 | Procedures are established to ensure that recoveries are taken into account for the final declaration of expenditure and to follow on-going legal proceedings or administrative appeals with suspensive effect regarding recoveries | Y/N | |
4 | Verifications will be performed to ensure the accuracy and completeness of the declaration of expenditure (in particular, on any interest generated by the pre-financing received from the Commission as well as its effective use as national contribution) | Y/N | |
5 | In case of local currency, the methods used for the calculation in Euro comply with the rules defined by the Commission | Y/N |
3.12. Evaluation of the programme | |||
---|---|---|---|
Short description of the process[involves the responsible authority and the delegated authority(ies)] | |||
Key targets | Achieved? | Comments | |
1 | The guidance documents from the Commission on evaluations are disseminated widely and made available to all potential final beneficiaries and other interested parties | Y/N | |
2 | The key operational and financial indicators provided by the final beneficiaries to measure the achievements of the project will be recorded | Y/N | |
3 | The responsible authority (and/or delegated authorities) will ensure that the indicators provided are appropriate to measure the outcome and results of each project | Y/N | |
4 | Procedures are in place to ensure that the necessary evaluation will be carried out as required by the basic act | Y/N |
4.1. Documentation on the procedures | |||
---|---|---|---|
Short description of the process[involves all authorities] | |||
Key targets | Achieved? | Comments | |
1 | The authorities will ensure that the established procedures referred to in Article 7 of this decision comply with national and Community law (e.g. public procurement, accounting rules, etc.) | Y/N | |
2 | The procedures are approved by a duly authorised person | Y/N | |
3 | The established procedures set out clear instructions concerning each of the main operations and explain the decision-making circuits concerning the performance of functions | Y/N | |
4 | Arrangements are in place to ensure that all relevant staff is informed of the established procedures | Y/N | |
5 | Where appropriate, these procedures include the use of check-lists summarising the key controls to be performed | Y/N | |
6 | Arrangements are in place to ensure the protection of personal data | Y/N |
4.2. Accounting and book keeping | |||
---|---|---|---|
Short description of the process[involves the responsible authority, the delegated authority(ies) and the certifying authority] | |||
Key targets | Achieved? | Comments | |
1 | Arrangements are in place to ensure that accounting data is complete, reliable and correct. In particular, the accounting system will allow:
| Y/N | |
2 | The accounting and financial reporting system complies with the national data protection legislation | Y/N | |
3 | The accounting and financial reporting system to be used will be in computerised form | Y/N | |
4 | A back-up system exists to guarantee the continuity of operations should the need arise | Y/N | |
5 | In case of local currency, the methods used for the calculation in Euro comply with the rules defined by the Commission | Y/N |
4.3. Reporting to the Commission | |||
---|---|---|---|
Short description of the process[involves all authorities] | |||
Key targets | Achieved? | Comments | |
1 | Reporting obligations have been identified as well as the implications for resources | Y/N | |
2 | The established procedures allow proper, timely and complete input by the designated authorities | Y/N | |
3 | Reports are approved by a duly authorised person | Y/N |
4.4. Audit trail | ||
---|---|---|
Short description of the process[involves all authorities] | ||
Where are the following documents kept? | Body/Unit in charge | How long for? |
Description of the management and control systems including manual(s) of procedures | ||
Audit strategy | ||
National multiannual programme and possible revisions | ||
National annual programmes and possible revisions | ||
European Commission Decisions on multiannual and annual programmes | ||
Calls for proposals/Calls for tender | ||
Applicant files/Contract files | ||
Administrative, technical and financial analysis of proposals/tenders received (evaluation grids) and evaluation committee reports | ||
Funding decisions or rejections | ||
Project funding agreements | ||
Financial commitment decisions for each of the projects | ||
Progress reports and final reports submitted by funding recipients | ||
Financial reports and payment applications submitted by funded Project | ||
Supporting documents for expenditure and revenue for funded Project | ||
Payments/recovery authorisations for funding (proof of verifications performed) | ||
Payments/recovery orders for funding | ||
Proof of payments/recovery of funding | ||
Documentation related to the sampling methodology for the audit activity | ||
Reports on audits carried out on projects | ||
Reports on audits carried out at national level on management and control systems | ||
Audit reports on annual programmes | ||
Audit opinions on the management and control systems | ||
Audit declarations on the validity of the requests for payment | ||
Requests for payment sent to the European Commission | ||
Certification of expenditure sent to the European Commission | ||
Progress implementation reports sent to the European Commission | ||
Final implementation reports sent to the European Commission | ||
Proof of payment received from the European Commission | ||
Evaluation reports sent to the European Commission |
Authorit | Declaration | Date and signature |
---|---|---|
Responsible authority | I certify the accuracy and completeness of the information about the identification and internal control systems of the responsible authority | Name: Function: Date: |
signature | ||
Certifying authority | I certify the accuracy and completeness of the information about the identification and internal control systems of the certifying authority | Name: Function: Date: |
signature | ||
Audit authority | I certify the accuracy and completeness of the information about the identification and internal control systems of the audit authority and I can confirm that what has been described provides a reliable picture of all the management and control systems | Name: Function: Date: |
signature |
Initial version
Revised version (number, date dd/mm/year) following dialogue with the Commission
Version revised in the light of evaluations and/or following implementation difficulties
Version revised following the revision of the strategic guidelines
MEMBER STATE:
FUND:
RESPONSIBLE AUTHORITY:
PERIOD COVERED:
A description of the baseline situation in the Member State in the policy field covered by the Fund's objectives
A description of how the Fund contributes to meeting the requirements, which priorities have been chosen and why
Breakdown when presenting the information on the priorities chosen
The objective(s) of the strategy and examples of key actions
Description of target(s) concerned and the indicator(s) used
If appropriate, an indication of which key actions are considered as implementing specific priorities under the chosen priority
An indication of how this strategy is compatible with other regional, national and Community instruments
Multiannual programme — draft financial plan | ||||||||
---|---|---|---|---|---|---|---|---|
Table 1 Community contribution | ||||||||
Member State: […] | ||||||||
Fund: […] | ||||||||
(in EUR 1 000 — current prices) | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | TOTAL |
Priority 1: […] | 0 | |||||||
Priority 2: […] | 0 | |||||||
Priority 3: […] | 0 | |||||||
Priority …: […] | 0 | |||||||
a | 0 | |||||||
Total | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Multiannual programme — Draft financial plan | ||||||||
---|---|---|---|---|---|---|---|---|
Table 2 Overall financing plan | ||||||||
Member State: […] | ||||||||
Fund: […] | ||||||||
(in EUR 1 000 — current prices) | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | TOTAL |
Community contribution | ||||||||
Public cofinancing | ||||||||
Private cofinancing | ||||||||
Total | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
% Community contribution | % | % | % | % | % | % | % | % |
[signature of the responsible person]
Initial version
Revised version (number, date dd/mm/year) following dialogue with the Commission
Version revised for other reasons
MEMBER STATE:
FUND:
RESPONSIBLE AUTHORITY:
YEAR COVERED:
When presenting the actions under points 3.1. to etc, where relevant, provide a breakdown according to the description of categories of actions in the basic act
Aspects of the action presented when describing each action under points 3.1 to etc
a If applicable. | ||||||||
b If applicable. | ||||||||
Annual programme — draft financial plan | ||||||||
---|---|---|---|---|---|---|---|---|
Table 1 Overview table | ||||||||
Member State: […] | ||||||||
Annual programme concerned: […] | ||||||||
Fund: […] | ||||||||
Ref. priority | Ref. specific prioritya | Community Contribution | Public Allocation | Private Allocation | Total | % EC | Share of total | |
(all figures in EUR) | (a) | (b) | (c) | (d = a + b + c) | (e = a/d) | (d/total d) | ||
Action 1: […] | 0 | |||||||
Action 2: […] | 0 | |||||||
Action 3: […] | 0 | |||||||
Action 4: […] | 0 | |||||||
Action 5: […] | 0 | |||||||
Action …: […] | 0 | |||||||
Action N: […] | 0 | |||||||
Technical assistance | 0 | |||||||
Other operationsb | 0 | |||||||
Total | 0 | 0 | 0 | 0 | % | 100 % |
[signature of the responsible person]
MEMBER STATE:
FUND:
RESPONSIBLE AUTHORITY:
YEAR COVERED:
Etc.
a If applicable. | ||||||||||
b If applicable. | ||||||||||
Progress report on the implementation of the annual programme | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Table 1 Financial report | ||||||||||
Member State: […] | ||||||||||
Annual programme concerned: […] | ||||||||||
Situation at: [day/month/year] | ||||||||||
Pre-financing payment(s) received from EC: [amount] | ||||||||||
(all figures in EUR) | Ref. priority | Ref. specific prioritya | Programmed MS | Committed at the level of the MS | EC contribution paid by MS to final beneficiaries | Total [F6eligible] costs incurred to date by final beneficiaries | ||||
Total programmed costs | EC contribution | % EC contribution | Total eligible costs | EC contribution | % EC contribution | |||||
(a) | (b) | (c = b/a) | (d) | (e) | (f = e/d) | |||||
Action 1: […] | ||||||||||
Action 2: […] | ||||||||||
Action 3: […] | ||||||||||
Action 4: […] | ||||||||||
Action 5: […] | ||||||||||
Action N: […] | ||||||||||
Technical assistance | ||||||||||
Other operationsa | ||||||||||
TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
↓ | ↓ | |||||||||
> 60 % of pre-financing payment(s) received? | ||||||||||
Yes/No | Yes/No |
a Since the last progress/final report sent to the Commission. | ||||||||
Notification of new irregularitiesa? | No | Yes (if Yes, fill in table 2) | ||||||
---|---|---|---|---|---|---|---|---|
Progress report on the implementation of the annual programme | ||||||||
Table 2 Initial reporting on irregularity | ||||||||
Member State: […] | ||||||||
Situation at: [day/month/year] | ||||||||
Fund: […] | ||||||||
Reference | Annual programme | Project | Provision infringed | Type of irregularity | Date/source of first information | Method of detection | Possibility of fraud (Y/N) | Amount concerned in EUR(Community contribution) |
Follow-up of previous irregularities? | No | Yes (if Yes, fill in table 3) | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Progress report on the implementation of the annual programme | ||||||||||
Table 3 Reporting of follow-up of irregularities | ||||||||||
Member State: […] | ||||||||||
Situation at: [day/month/year] | ||||||||||
Fund: […] | ||||||||||
Reference | Annual Programme | Project | Provision infringed | Amount concerned (EC contribution.) in EUR | Follow-up actions | Recovery order (amounts in EUR) | Cancellation of EC contribution | |||
Issued | Paid | Default interest | Waived | |||||||
I, the undersigned [name in capitals of the person in charge],
representing the responsible authority for managing and implementing the [name of the Fund] request payment of the following amount as the second pre-financing payment.
a Total amount requested to complement the first pre-financing. | |
Euroa |
[exact figure to two decimal places]
This request for payment is admissible because:
a progress report on implementation of the annual programme has been submitted to the Commission or is attached;
a certified declaration of expenditure drawn up accounting for at least 60 % of the amount of the first pre-financing has been submitted or is attached;
the annual programme has been implemented according to the principle of sound financial management and there is a reasonable assurance that the underlying transactions are legal and regular;
there is no reasoned opinion by the Commission in respect of an infringement under Article 226 of the Treaty, as regards the actions for which the expenditure is declared in the request.
Payment should be made by the Commission to:
Authority responsible for receiving payments | |
Bank | |
Bank account No | |
Account holder (if not the same as the authority responsible for receiving payments) |
Date | Name in capital letters, stamp, position and signature of competent authority |
MEMBER STATE:
FUND:
RESPONSIBLE AUTHORITY:
YEAR COVERED:
Aspects of the action presented when describing each action under point 1.3 to etc.
Table 1
Detailed financial report
| |||||||||||||||
a If applicable.] | |||||||||||||||
(all figures in euro) | Programmed by MS (as in the Commission approved annual programme) | Committed at the level of the MS | Actual figures accepted by the responsible authority (costs incurred by the beneficiaries and final EC contribution) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Actions | Projects | Ref. priority | Ref. specific priority a | Total programmed costs (a) | EC contribution (b) | % EC contribution (c = b/a) | Total eligible costs (d) | EC contribution (e) | % EC contribution (f = e/d) | Total eligible costs (g) | EC contribution (h) | % EC contribution (i = h/g) | Contributions from third parties (j) | Receipts generated by the project (k) | Payment/Recovery to be made by the RA (l) |
Action 1: […] | project 1: […] | ||||||||||||||
project N: […] | |||||||||||||||
Total Action 1 | |||||||||||||||
Action …: […] | project 1: […] | ||||||||||||||
project N: […] | |||||||||||||||
Total Action …: […] | |||||||||||||||
Action N: […] | project 1: […] | ||||||||||||||
project N: […] | |||||||||||||||
Total Action N | |||||||||||||||
Technical assistance | |||||||||||||||
Other operations a | |||||||||||||||
TOTAL | 0 | 0 | 0 % | 0 | 0 | 0 % | 0 | 0 | 0 % | 0 |
Final report on the implementation of the annual programme | ||||||
---|---|---|---|---|---|---|
Table 2 List of pending recovery orders | ||||||
Member State: […] | ||||||
Fund: […] | ||||||
Situation at: [day/month/year] | ||||||
Reference | Annual Programme | Project | Total amount to be recovered | EC contribution to be recovered | Deduced from the related financial report (Y/N) | Reasons for recovery |
Final report on the implementation of the annual programme | ||||||
---|---|---|---|---|---|---|
Table 3 List of recovery orders not already deducted from previous declarations of expenditure | ||||||
Member State: […] | ||||||
Fund: […] | ||||||
Situation at: [day/month/year] | ||||||
Reference | Annual programme | Project | Total amount recovered | EC contribution recovered | Date of recovery | Reasons for recovery |
a Since the last progress/final report sent to the Commission. | ||||||||
Notification of new irregularitiesa? | No | Yes (if Yes, fill in table 4) | ||||||
---|---|---|---|---|---|---|---|---|
Final report on the implementation of the annual programme | ||||||||
Table 4 Initial reporting on irregularity | ||||||||
Member State: […] | ||||||||
Situation at: [day/month/year] | ||||||||
Fund: […] | ||||||||
Reference | Annual programme | Project | Provision infringed | Type of irregularity | Date/Source of first information | Method of detection | Possibility of fraud(Y/N) | Amount concerned in EUR (Community contribution) |
Follow-up of previous irregularities? | No | Yes (if Yes, fill in table 5) | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Final report on the implementation of the annual programme | ||||||||||
Table 5 Reporting of follow-up of irregularities | ||||||||||
Member State: […] | ||||||||||
Situation at: [day/month/year] | ||||||||||
Fund: […] | ||||||||||
Reference | Annual programme | Project | Provision infringed | Amount concerned | Follow-up actions | Recovery order (amounts in EUR) | Cancellation of EC contribution | |||
(EC contribution) in EUR | Issued | Paid | Default interest | Waived | ||||||
Project eligible expenditure and income compliance with the non-profit rule and project summary description.
Table 6 A
Project eligible cost and sources of income Compliance with the principle of non-profit as set out in item I.3.3 of Annex XI
Situation at: day/month/year | |||||||
Eligible cost | Sources of income | ||||||
---|---|---|---|---|---|---|---|
Direct costs | Indirect costs | Total eligible cost | Contribution from the EU | Contribution from third parties | Receipts generated by the project | Total income (as set out in item I.3.3 of Annex XI) | |
(a) | (b) | (c) = (a) + (b) | (e) | (f) | (g) | (h)= (e) + (f) + (g) | |
Project reference | |||||||
Project reference | |||||||
Project reference | |||||||
etc. | |||||||
TOTAL ACTION 1 | |||||||
Project reference | |||||||
Project reference | |||||||
Project reference | |||||||
etc. | |||||||
TOTAL ACTION 2 | |||||||
Project reference | |||||||
Project reference | |||||||
Project reference | |||||||
etc. | |||||||
TOTAL ACTION N | |||||||
TECHNICAL ASSISTANCE | |||||||
TOTAL ANNUAL PROGRAMME | ] |
I, the undersigned [name in capitals of the person in charge],
representing the responsible authority for the [name of the Fund]
request payment of the following amount:
a Total amount requested to complement the pre-financing payment(s). | |
EURa | + |
[exact figure to two decimal places]
OR
declare for reimbursement the following amount:
a Total amount to be reimbursed after the clearing of the pre-financing payment(s). | |
EURa | — |
[exact figure to two decimal places]
This amount results from the balance between the total amount of pre-financing payment(s) received for this annual programme and the actual expenditure declared.
This request for payment is admissible because:
a final report on implementation of the annual programme has been submitted to the Commission or is attached;
a certified declaration of expenditure has been submitted or is attached;
an annual audit report, an opinion on the functioning of the management and control system and a declaration on the validity of the payment request prepared by the audit authority have been submitted or are attached;
any interest generated by the pre-financing payments has been posted to the annual programme, being regarded as national contribution and has been taken into account in the declaration of expenditure;
the annual programme has been implemented according to the principle of sound financial management and there is a reasonable assurance that the underlying transactions are legal and regular;
there is no reasoned opinion by the Commission in respect of an infringement under Article 226 of the Treaty, as regards the actions for which the expenditure is declared in the request.
Payment should be made by the Commission to:
Authority responsible for receiving payments | |
Bank | |
Bank account No | |
Account holder (if not the same as the authority responsible for receiving payments) |
Date | Name in capital letters, stamp, position and signature of competent authority |
MEMBER STATE:
FUND(S):
RESPONSIBLE AUTHORITY:
Year 2007 | |||||||||
---|---|---|---|---|---|---|---|---|---|
System audits | |||||||||
Funds | Authorities concerned | Processes concerned | Scope of the audit | Man-days | Planning | ||||
Audits of projects | |||||||||
Funds | Programme Year | Priority | Project | Final beneficiary | Total eligible costs of the project | Costs to be audited | Man-days | Planning | |
Insert data using the model table defined for year 2007
MEMBER STATE:
FUND:
RESPONSIBLE AUTHORITY:
CALENDAR YEAR COVERED:
Insert data using the model table defined for year 2007
MEMBER STATE:
FUND:
RESPONSIBLE AUTHORITY:
ANNUAL PROGRAMME COVERED BY THE REPORT:
Audit report | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Member State: […] | ||||||||||
Annual programme concerned: […] | ||||||||||
Situation at: [day/month/year] | ||||||||||
SYSTEM AUDITS CLOSED SINCE LAST REPORT | ||||||||||
Fund(s) | Authorities concerned | Processes concerned | Scope of the audit | Man-days spent | Date of final report | |||||
AUDITS OF PROJECTS LINKED TO ANNUAL PROGRAMME 20xx | ||||||||||
Fund(s) | Project | Final beneficiary | Total eligible costs | Eligible costs audited | Financial correction | Error rate | ||||
(a) | (b) | (c) | (d = c/b) | |||||||
Total | 0 | 0 | 0 | % | ||||||
Total annual programme | (e) | (f) | Coverage rate: (= f/e) |
[signature of the responsible person]
To the European Commission
I, the undersigned, representing the [name of audit authority designated by Member State], have examined the functioning of the management and control systems in the [name of the Fund] regarding the actions implemented under the annual programme for the year [20XX], in order to issue an opinion on whether the systems functioned effectively so as to provide reasonable assurance that declarations of expenditure presented to the Commission are correct and, as a consequence, reasonable assurance that the underlying transactions are legal and regular.
The examination was carried out in accordance with the audit strategy in respect of this Fund during the period [dd/mm/year] to [dd/mm/year] and reported in the annual audit report under section A.
Either
There were no limitations on the scope of the examination.
or
The scope of the examination was limited by the following factors:
[…]
[…]
etc.
(Indicate any limitation on the scope of the examination, for example any systemic problems, weaknesses in the management and control system, lack of supporting documentation, cases under legal proceedings, etc., and estimate the amounts of expenditure and the Community contribution affected. If the audit authority does not consider that the limitations have an impact on the expenditure declared, this should be stated.)
Based on the examination referred to above, it is my opinion that, for the abovementioned annual programme, the management and control systems established for the [name of the Fund] complied with the applicable requirements of the basic act No 574/2007/EC [and Commission Decision (EC) No [2008/456/EC] and functioned effectively so as to provide reasonable assurance that declarations of expenditure presented to the Commission are correct and, as a consequence, reasonable assurance that the underlying transactions are legal and regular.
Based on the examination referred to above, it is my opinion that, for the abovementioned annual programme, the management and control systems established for the [name of the Fund] complied with the applicable requirements of the basic act No 574/2007/EC [and Commission Decision (EC) No 2008/456/EC] and functioned effectively so as to provide reasonable assurance that declarations of expenditure presented to the Commission are correct and, as a consequence, reasonable assurance that the underlying transactions are legal and regular, except in the following respects:
[…]
[…]
etc.
My reasons for considering that this (these) aspect(s) of the systems did not comply with the requirements and/or did not operate in such a way as to give a reasonable assurance on the correctness of the declarations of expenditure presented to the Commission are as follows:
[…]
[…]
etc.
I estimate the impact of the qualification(s) to be […] % of the total expenditure declared. The Community contribution affected is thus […]
Based on the examination referred to above, it is my opinion that, for the abovementioned annual programme, the management and control system established for the [name of the Fund] did not comply with the requirements of Articles […] of the basic act No 574/2007/EC [and Commission Decision (EC) No 2008/456/EC] and did not function effectively so as to provide reasonable assurance that declarations of expenditure presented to the Commission are correct and, as a consequence, does not provide reasonable assurance that the underlying transactions are legal and regular.
This adverse opinion is based on:
[…]
[…]
etc.
Date
Signature
[signature of the responsible person]
To the European Commission
I, the undersigned, representing the (name of the audit authority designated by Member State), have, for the annual programme [20xx] of the [name of the Fund], examined the results of the audit work carried out on this annual programme [and have carried out the additional work I judged necessary as set out in the report].
I have planned and performed this work with a view to assessing whether the request for payment of the balance of the Community contribution to the annual programme [20xx] is valid and the underlying transactions covered by the declarations of expenditure regarding this annual programme are legal and regular.
Either
There were no limitations on the scope of the examination.
or
The scope of the examination was limited by the following factors:
[…]
[…]
etc.
Based on the examination referred to above, it is my opinion that the declarations of expenditure present fairly, in all material respects, the expenditure paid under the annual programme and that the request for payment of the balance of the Community contribution to this annual programme is valid.
Based on the examination referred to above, it is my opinion that the declarations of expenditure present fairly, in all material respects, the expenditure paid under the annual programme and that the request for payment of the balance of the Community contribution to this annual programme is valid, except with regard to the following points:
[…]
[…]
etc.
I estimate the impact of these qualifications to be … of the total expenditure declared. The Community contribution affected is thus….
Based on the examination referred to above, it is my opinion that the declarations of expenditure do not present fairly, in all material respects, the expenditure paid under the annual programme and that, as a consequence, the request for payment of the balance of the Community contribution to this annual programme is not valid.
Date
Signature
[signature of the responsible person]
MEMBER STATE:
FUND:
CERTIFYING AUTHORITY:
ANNUAL PROGRAMME COVERED BY THE CERTIFICATION:
I, the undersigned, [name of the person in charge]
representing the certifying authority designated for the [name of the Fund]
hereby certify that all expenditure included in the progress report on the implementation of the annual programme amounts to:
[exact figure to two decimal places]
I also certify that actions are progressing in pursuance with the objectives laid down in the Commission Decision adopting the annual programme and in accordance with the basic act and its implementing rules, and in particular, that:
the declaration of expenditure is accurate, results from reliable accounting systems and is based on verifiable supporting documents;
[F1the expenditure declared has been incurred in respect of actions selected for funding in accordance with the criteria applicable to the annual programme;]
for the purpose of certification, I have received adequate information from the Responsible Authority on the procedures and verifications carried out in relation to expenditure included in statements of expenditure;
the declaration of expenditure and the request for the second pre-financing payment take account, where applicable, of any amounts recovered and of any interest received under the annual programme.
This declaration of expenditure is based on accounts provisionally closed on [dd/mm/20yy].
In accordance with Article 45 of the basic act, the supporting documents are and will continue to be available for at least five years following the closure of the annual programme by the Commission.
Date | Name in capital letters, stamp, position and signature of certifying authority |
MEMBER STATE:
FUND:
CERTIFYING AUTHORITY:
ANNUAL PROGRAMME COVERED BY THE CERTIFICATION:
I, the undersigned, [name of the person in charge]
representing the certifying authority designated for the [name of the Fund]
hereby certify that all expenditure included in the final report on the implementation of the annual programme amounts to:
a Total amount of eligible expenditure paid by final beneficiaries or used for the technical assistance. | |
EURa |
[exact figure to two decimal places]
I also certify that actions are progressing in pursuance with the objectives laid down in the Commission Decision adopting the annual programme and in accordance with the basic act, and in particular that:
the declaration of expenditure is accurate, results from reliable accounting systems and is based on verifiable supporting documents;
the expenditure declared complies with the applicable Community and national rules and has been incurred in respect of actions selected for funding in accordance with the criteria applicable to the annual programme and the applicable Community and national rules, in particular with public procurement rules;
I have a reasonable assurance that the underlying transactions are legal and regular;
for the purpose of certification, I have received adequate information from the Responsible Authority on the procedures and verifications carried out in relation to expenditure included in statements of expenditure;
the results of all audits carried out by or under the responsibility of the audit authority have been duly taken into account;
the declaration of expenditure and the request for the balance payment take account, where applicable, of any amounts recovered and of any interest received under the annual programme.
This declaration of expenditure is based on accounts closed on [dd/mm/20yy].
In accordance with Article 45 of the basic act, the supporting documents are and will continue to be available for at least five years following the closure of the annual programme by the Commission.
Date | Name in capital letters, stamp, position and signature of certifying authority |
Against a background of blue sky, 12 golden stars form a circle representing the union of the peoples of Europe. The number of stars is fixed, twelve being the symbol of perfection and unity.
On an azure field a circle of 12 golden mullets, their points not touching.
The emblem has the form of a blue rectangular flag of which the fly is one and a half times the length of the hoist. 12 gold stars situated at equal intervals form an invisible circle whose centre is the point of intersection of the diagonals of the rectangle. The radius of the circle is equal to one third of the height of the hoist. Each of the stars has five points which are situated on the circumference of an invisible circle whose radius is equal to one eighteenth of the height of the hoist. All the stars are upright, i.e. with one point vertical and two points in a straight line at right angles to the mast. The circle is arranged so that the stars appear in the position of the hours on the face of a clock. Their number is invariable.
The emblem is in the following colours: PANTONE REFLEX BLUE for the surface of the rectangle; PANTONE YELLOW for the stars.
If the four-colour process is used, recreate the two standard colours by using the four colours of the four-colour process.
PANTONE YELLOW is obtained by using 100 % ‘Process Yellow’.
PANTONE REFLEX BLUE is obtained by mixing 100 % ‘Process Cyan’ and 80 % ‘Process Magenta’.
In the web-palette PANTONE REFLEX BLUE corresponds to colour RGB:0/0/153 (hexadecimal: 000099) and PANTONE YELLOW to colour RGB:255/204/0 (hexadecimal: FFCC00).
Using black, outline the rectangle in black and print the stars in black on white.
Using blue (Reflex Blue), use 100 % with the stars reproduced in negative white.
If there is no alternative to a coloured background, put a white border around the rectangle, the width of the border being 1/25th of the height of the rectangle.
within the scope of the Fund and within its objectives, as described in Articles 1 and 3 of the basic act;
within the eligible actions listed in Articles 4 and 6 of the basic act;
needed to carry out the activities covered by the project, forming part of the multiannual and annual programmes, as approved by the Commission;
reasonable and comply with the principles of sound financial management, in particular, value for money and cost-effectiveness;
incurred by the final beneficiary and/or the partners in the project, who shall be established and registered in a Member State, except in the case of international public sector organisations set up by intergovernmental agreements, and specialised agencies set up by such organisations, the International Committee of the Red Cross (ICRC) and the International Federation of National Red Cross and Red Crescent Societies. With regard to Article 39 of this Decision, the rules applicable to the final beneficiary shall apply mutatis mutandis to the partners in the project;
incurred in accordance with the specific provisions in the grant agreement.
The budget of a project shall be presented as follows:
The budget shall be balanced: Total Eligible Cost shall be equal to Total Income.
it must be recorded in the accounting records of the final beneficiary;
it must be determined in accordance with the applicable accounting standards of the country where the final beneficiary is established and with the usual cost accounting practices of the final beneficiary; and
it must be declared in accordance with the requirements of applicable tax and social legislation.
expenditure implementing actions relating to the general objective defined in Article 3(1)(d) of the basic act; expenditures for those actions may be incurred in the territory of the Member States and in third countries,
actions relating to the surveillance of external borders; those actions may take place both within and beyond the territory of Member States.
The direct eligible costs of the project are costs that, with due regard to the general conditions of eligibility set out in part I, are identifiable as specific costs directly linked to the implementation of the project. Direct costs shall be included in the estimated overall budget of the project.
The following direct costs are eligible:
Costs pertaining to the acquisition of equipment (based on any of the following: rental, leasing, purchase based on the full or partial cost, or depreciation of purchased assets) are only eligible if they are essential to the implementation of the project. Equipment shall have the technical properties needed for the project and comply with applicable norms and standards.
Expenditure in relation to renting and leasing operations is eligible for co-financing subject to the rules established in the Member State, national legislation and practice and the duration of the rental or lease for the purpose of the project.
they are directly linked to the realisation of the project;
incurred in accordance with national procurement rules established in the Member State;
the equipment has the technical characteristics necessary for the project and complies with applicable norms and standards;
the equipment will continue to be used for the same objectives pursued by the project, after the day of purchase and for a minimum duration of:
three years or more for Information and Communication Technology (ICT) equipment,
five years or more for other types of equipment such as operating equipment and means of transport, except for the ones indicated below,
ten years for helicopters, vessels and aircrafts.
Where equipment is purchased before or during the lifetime of the project, the portion of equipment depreciation is eligible on the basis of the duration of use for the project and the rate of actual use for the project.
Equipment that was purchased before the lifetime of the project, but which is used for the purpose of the project, is eligible on the basis of depreciation. However these costs are ineligible if the equipment was originally purchased through a Community grant.
Purchase costs of equipment shall correspond to normal market costs and the value of the items concerned is written off in accordance with the tax and accounting rules applicable to the final beneficiary.
In the case of either purchase of real estate, construction or renovation of real estate, or rental of real estate, it shall have the technical properties needed for the project and comply with the applicable norms and standards.
a certificate is obtained from an independent qualified valuer or duly authorised official body establishing that the price does not exceed the market value, either attesting that the real estate is in conformity with national regulations or specifying the points which are not in conformity that the final beneficiary plans to rectify as part of the project;
the real estate has not been purchased through a Community grant at any time prior to the implementation of the project;
the real estate is to be used solely for the purpose stated in the project for a period of at least 10 years after the end date of the project unless the Commission specifically authorises otherwise in the case of co-financing of the full or partial costs; in the case of co-financing on the basis of depreciation this period is reduced to 5 years;
the purchase of the real estate respects the principles of value for money and cost-effectiveness and is being considered as proportionate to the aim to be achieved through the implementation of the project;
in the case of co-financing on the basis of depreciation, only the portion of the depreciation of these assets corresponding to the duration of use for the project and the rate of actual use for the project is eligible; depreciation shall be calculated according to national accounting rules.
Rental of real estate is eligible for co-financing where there is a clear link between the rental and the objectives of the project concerned, under the conditions set out below and without prejudice to the application of stricter national rules:
the real estate has not been purchased through a Community grant;
the real estate is to be used solely for implementation of the project. If not, only the portion of the costs corresponding to the use for the project is eligible.
The costs of consumables, supplies and general services are eligible provided that they are identifiable and directly necessary for the implementation of the project.
subcontracting of tasks relating to the overall management of the project;
subcontracting that adds to the cost of the project without adding proportionate value to it;
subcontracting with intermediaries or consultants where payment is defined as a percentage of the total cost of the project, unless such payment is justified by the final beneficiary by reference to the actual value of the work or services provided.
Costs needed to meet the requirements linked to Union co-financing, such as publicity, transparency, evaluation of the project, external audit, bank guarantees, translation costs, etc., are eligible as direct costs.
Legal consultancy fees, notarial fees and costs of technical and financial experts are eligible.
The following costs are not eligible:
VAT, except where the final beneficiary can show that he is unable to recover it;
return on capital, debt and debt service charges, debit interest, foreign exchange commissions and exchange losses, provisions for losses or potential future liabilities, interest owed, doubtful debts, fines, financial penalties, litigation costs, and excessive or reckless expenditure;
entertainment costs exclusively for project staff; reasonable hospitality costs at social events justified by the project, such as an event at the end of the project or meetings of the project steering group, are permitted;
costs declared by the final beneficiary and covered by another project or work programme receiving a Community grant;
purchase of land;
contributions in kind.
expenditure relating to the preparation, selection, appraisal, management and monitoring of actions;
expenditure relating to audits and on-the-spot checks of actions or projects;
expenditure relating to evaluations of actions or projects;
expenditure relating to information, dissemination and transparency in relation to actions;
expenditure on the acquisition, installation and maintenance of computerised systems for the management, monitoring and evaluation of the Funds;
expenditure on meetings of monitoring committees and sub-committees relating to the implementation of actions; this expenditure may also include the costs of experts and other participants in these committees, including third-country participants, where their presence is essential to the effective implementation of actions;
expenditure for the reinforcement of the administrative capacity for the implementation of the Fund.
the portion of costs for common measures is charged to the corresponding Fund in a reasonable and verifiable manner; and
there is no double financing of costs.
In accordance with Article 40(1), the rules in the basic act and this Decision regarding the implementation of annual programmes shall apply mutatis mutandis to the support for the implementation of the Special Transit Scheme. However, with regard to the eligibility rules contained in this Annex, the following specific rules shall apply in the case of the Special Transit Scheme:
the eligibility period for expenditure shall be in accordance with Article 40(3) of this Decision;
by virtue of Article 6(2)(c) of the basic act, staff costs of public bodies are eligible expenditure provided that they are based on real additional costs related to the implementation of the Special Transit Scheme (STS) and are allocated to the operation according to a duly justified and equitable method; the expenditure must be certified on the basis of documents which permit the identification of real costs paid by the public body concerned in relation to the STS, arising beyond its statutory responsibilities or day-to-day tasks.]
OJ L 281, 23.11.1995, p. 31. Directive as amended by Regulation (EC) No 1882/2003 (OJ L 284, 31.10.2003, p. 1).
OJ L 160, 30.6.2000, p. 1. Regulation as last amended by Regulation (EC) No 681/2007 (OJ L 159, 20.6.2007, p. 1).
[F1Where ‘ N ’ is the year referred to in the financing decision approving the annual programmes of the Member States.]
Applicable only for the final report on implementation of the first annual programme.
If applicable.
To be submitted after the audit strategy, in accordance with Article 25(2).
[F1Where ‘ N ’ is the year referred to in the financing decision approving the annual programmes of the Member States.]
Textual Amendments
F1 Substituted by Commission Decision of 2 March 2011 amending Decision 2008/456/EC laying down rules for the implementation of Decision No 574/2007/EC of the European Parliament and of the Council establishing the External Borders Fund for the period 2007 to 2013 as part of the General programme ‘Solidarity and Management of Migration Flows’ as regards Member States’ management and control systems, the rules for administrative and financial management and the eligibility of expenditure on projects co-financed by the Fund (notified under document C(2011) 1160) (Only the Bulgarian, Czech, Dutch, English, Estonian, Finnish, French, German, Greek, Hungarian, Italian, Latvian, Lithuanian, Maltese, Polish, Portuguese, Romanian, Slovak, Slovenian, Spanish and Swedish texts are authentic) (2011/148/EU).
The Whole Decision you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: