ANNEX INETWORK SCHEMES ILLUSTRATED BY MAPS16

Section 2:Road network

  1. 2.0.

    Europe

  2. 2.1.

    Belgium

  3. 2.2.

    Bulgaria

  4. 2.3.

    Czech Republic

  5. 2.4.

    Denmark

  6. 2.5.

    Germany

  7. 2.6.

    Estonia

  8. 2.7.

    Ireland

  9. 2.8.

    Greece

  10. 2.9.

    Spain

  11. 2.10.

    France

  12. 2.11.

    Italy

  13. 2.12.

    Cyprus

  14. 2.13.

    Latvia

  15. 2.14.

    Lithuania

  16. 2.15.

    Luxembourg

  17. 2.16.

    Hungary

  18. 2.17.

    Malta

  19. 2.18.

    Netherlands

  20. 2.19.

    Austria

  21. 2.20.

    Poland

  22. 2.21.

    Portugal

  23. 2.22.

    Romania

  24. 2.23.

    Slovenia

  25. 2.24.

    Slovakia

  26. 2.25.

    Finland

  27. 2.26.

    Sweden

  28. 2.27.

    United Kingdom

Section 3:Rail network

  1. 3.0.

    Europe

  2. 3.1.

    Belgium

  3. 3.2.

    Bulgaria

  4. 3.3.

    Czech Republic

  5. 3.4.

    Denmark

  6. 3.5.

    Germany

  7. 3.6.

    Estonia

  8. 3.7.

    Ireland

  9. 3.8.

    Greece

  10. 3.9.

    Spain

  11. 3.10.

    France

  12. 3.11.

    Italy

  13. 3.12.

    Latvia

  14. 3.13.

    Lithuania

  15. 3.14.

    Luxembourg

  16. 3.15.

    Hungary

  17. 3.16.

    Netherlands

  18. 3.17.

    Austria

  19. 3.18.

    Poland

  20. 3.19.

    Portugal

  21. 3.20.

    Romania

  22. 3.21.

    Slovenia

  23. 3.22.

    Slovakia

  24. 3.23.

    Finland

  25. 3.24.

    Sweden

  26. 3.25.

    United Kingdom

Section 4:Inland waterways network and inland ports

  1. 4.0.

    Europe

  2. 4.1.

    Belgium

  3. 4.2.

    Netherlands

  4. 4.3.

    Germany

  5. 4.4.

    Germany / Austria

  6. 4.5.

    France / Italy

  7. 4.6.

    France

  8. 4.7.

    Bulgaria

  9. 4.8.

    Czech Republic

  10. 4.9.

    Lithuania

  11. 4.10.

    Hungary

  12. 4.11.

    Poland

  13. 4.12.

    Romania

  14. 4.13.

    Slovakia

Section 5:Seaports - category A

  1. 5.0.

    Europe

  2. 5.1.

    Baltic Sea

  3. 5.2.

    North Sea

  4. 5.3.

    Atlantic Ocean

  5. 5.4.

    Mediterranean Sea - western part

  6. 5.5.

    Mediterranean Sea - eastern part

  7. 5.6.

    Bulgaria / Romania

  8. 5.7.

    Cyprus

  9. 5.8.

    Malta

Section 6:Airports

  1. 6.0.

    Europe

  2. 6.1.

    Belgium Denmark / Germany / Luxembourg/ Netherlands / Austria

  3. 6.2.

    Bulgaria

  4. 6.3.

    Czech Republic

  5. 6.4.

    Estonia

  6. 6.5.

    Ireland / United Kingdom

  7. 6.6.

    Greece

  8. 6.7.

    Spain / Portugal

  9. 6.8.

    France

  10. 6.9.

    Italy

  11. 6.10.

    Cyprus

  12. 6.11.

    Latvia

  13. 6.12.

    Lithuania

  14. 6.13.

    Hungary

  15. 6.14.

    Malta

  16. 6.15.

    Poland

  17. 6.16.

    Romania

  18. 6.17.

    Slovenia

  19. 6.18.

    Slovakia

  20. 6.19.

    Finland / Sweden

Section 7:Combined transport network

7.1

  1. A.

    Rail

  2. B.

    Rail, large-scale

NB: The term ‘planned’ in keys to the maps covers all stages of an infrastructure project of common interest from preliminary studies until construction.

SECTION 2ROAD NETWORK

Image_r00001

Image_r00002

Image_r00003

Image_r00004

Image_r00005

Image_r00006

Image_r00007

Image_r00008

Image_r00009

Image_r00010

Image_r00011

Image_r00012

Image_r00013

Image_r00014

Image_r00015

Image_r00016

Image_r00017

Image_r00018

Image_r00019

Image_r00020

Image_r00021

Image_r00022

Image_r00023

Image_r00024

Image_r00025

Image_r00026

Image_r00027

Image_r00028

SECTION 3RAIL NETWORK

Image_r00029

Image_r00030

Image_r00031

Image_r00032

Image_r00033

Image_r00034

Image_r00035

Image_r00036

Image_r00037

Image_r00038

Image_r00039

Image_r00040

Image_r00041

Image_r00042

Image_r00043

Image_r00044

Image_r00045

Image_r00046

Image_r00047

Image_r00048

Image_r00049

Image_r00050

Image_r00051

Image_r00052

Image_r00053

Image_r00054

SECTION 4INLAND WATERWAYS NETWORK AND INLAND PORTS

Image_r00055

Image_r00056

Image_r00057

Image_r00058

Image_r00059

Image_r00060

Image_r00061

Image_r00062

Image_r00063

Image_r00064

Image_r00065

Image_r00066

Image_r00067

Image_r00068

SECTION 5SEAPORTS - CATEGORY A

Image_r00069

Image_r00070

Image_r00071

Image_r00072

Image_r00073

Image_r00074

Image_r00075

Image_r00076

Image_r00077

SECTION 6AIRPORTS

Image_r00078

Image_r00079

Image_r00080

Image_r00081

Image_r00082

Image_r00083

Image_r00084

Image_r00085

Image_r00086

Image_r00087

Image_r00088

Image_r00089

Image_r00090

Image_r00091

Image_r00092

Image_r00093

Image_r00094

Image_r00095

Image_r00096

Image_r00097

SECTION 7COMBINED TRANSPORT NETWORK

Image_r00098

Image_r00099

ANNEX IICRITERIA AND SPECIFICATIONS FOR PROJECTS OF COMMON INTEREST18

Section 2

Road network

Section 3

Rail network

Section 4

Inland waterways network and inland ports

Section 5

Seaports

Section 6

Airports

Section 7

Combined transport network

Section 8

Shipping information and management network

Section 9

Air traffic management network

Section 10

Positioning and navigation network

SECTION 2ROAD NETWORK

In addition to projects relating to the links in Annex I, projects of common interest will be deemed to include any infrastructure project relating to such links which deals with:

  1. A.

    Development of the network, and in particular:

    • widening of motorways or upgrading of roads,

    • construction or improvement of bypasses or ring roads,

    • increasing the interoperability of national networks.

  2. B.

    Development of traffic management and user information systems, and in particular:

    • establishment of telematic infrastructures for collecting traffic data,

    • developing traffic information centres and traffic control centres, as well as exchanges of data between traffic information centres in different countries,

    • establishing road information services, in particular the RDS-TMC system19,

    • technical interoperability of telematic infrastructures.

SECTION 3RAIL NETWORK

In addition to projects relating to the links in Annex I, projects of common interest will be deemed to include any infrastructure project relating to such links which deals with:

  • interoperability between trans-European railway systems,

  • interconnection with networks of other modes of transport.

SECTION 4INLAND WATERWAYS NETWORK AND INLAND PORTS

A.Inland ports

Projects of common interest must relate solely to infrastructure open to any user on a non-discriminatory basis.

In addition to projects relating to the connections and inland ports mentioned in Annex I, projects of common interest will be deemed to include any infrastructure project corresponding to one or more of the following categories:

  1. 1.

    access to the port from waterways;

  2. 2.

    port infrastructure inside the port area;

  3. 3.

    other transport infrastructures inside the port area;

  4. 4.

    other transport infrastructures linking the port to other elements of the trans-European transport network.

Any project which concerns the following work will be deemed to be of common interest: construction and maintenance of all elements of the transport system generally open to all transport users within the port and of links with the national or international transport network. In particular, this includes the development and maintenance of land for commercial and other port-related purposes, the construction and maintenance of road and rail connections, the construction and maintenance, including dredging, of access routes and of other areas of water in the port, and the construction and maintenance of navigation aids and traffic management, communication and information systems in the port and on the access routes.

B.Traffic management

Projects of common interest will be deemed to include in particular:

  • a signalling and guidance system for vessels, in particular those carrying dangerous or polluting goods,

  • communications systems for emergencies and inland waterway safety.

SECTION 5SEAPORTS

1.Common conditions for projects of common interest relating to seaports in the network

Projects of common interest must relate solely to infrastructure open to any user on a non-discriminatory basis.

Any project which concerns the following work will be deemed to be of common interest: construction and maintenance of all elements of the transport system generally open to all transport users within the port and of links with the national or international transport network. In particular, this includes the development and maintenance of land for commercial and other port-related purposes, the construction and maintenance of road and rail connections, the construction and maintenance, including dredging, of access routes and of other areas of water in the port, and the construction and maintenance of navigation aids and traffic management, communication and information systems in the port and on the access routes.

2.Specifications for projects of common interest relating to the seaport network

Any project which meets the following specifications will be deemed to be of common interest:

Project specifications

Port category

I. Promotion of Short Sea Shipping

Infrastructure necessary for the development of short-distance sea and sea-river shipping

Projects relating to ports in category A

II. Access to ports

Access to ports from sea or inland waterway

Projects relating to ports in categories A and B

Permanent accessibility of ports in the Baltic Sea situated at approximately latitude 60° north and beyond, including capital costs for ice-breaking works during winter

Projects relating to ports in categories A, B and C

Creation or improvement of hinterland access linking the port to other elements of the trans-European transport network through rail, road and inland-waterway connections

Projects relating to ports in category A

Development of existing hinterland access linking the port to other elements of the trans-European transport network through rail, road and inland-waterway connections

Projects relating to ports in categories A and B

III. Port infrastructure within the port area

Development of port infrastructure in order to increase intermodal efficiency

Projects relating to ports in categories A and B

Upgrading of the port infrastructure, in particular in ports on islands and in peripheral and outermost regions

Projects relating to ports in category C

Development and installation of management and information systems such as EDI (electronic data interchange) or other systems of intelligent management of goods and passenger traffic using integrated technologies

Projects relating to ports in categories A, B and C

Development of port installations to receive waste

Projects relating to ports in categories A, B and C

SECTION 6AIRPORTS

I.Eligibility criteria for airports of common interest

Airports of common interest must meet the criteria of one of the following connecting points:

  1. 1.

    International connecting points will include:

    • all airports or airport systems20 with an annual traffic volume of no less than:

      • 5 000 000 passenger movements minus 10 %,

        or

      • 100 000 commercial aircraft movements,

        or

      • 150 000 tonnes freight throughput,

        or

      • 1 000 000 extra-Union passenger movements;

        or

      • any new airport constructed to replace an existing international connecting point which cannot be developed further on its site.

  2. 2.

    Union connecting points will include:

    • all airports or airport systems with an annual traffic volume of:

      • between 1 000 000 minus 10 % and 4 499 999 passenger movements,

        or

      • between 50 000 and 149 999 tonnes freight throughput,

        or

      • between 500 000 and 899 999 passenger movements, of which at least 30 % are non-national,

        or

      • between 300 000 and 899 999 passenger movements and located off the European mainland at a distance of over 500 km from the nearest international connecting point;

        or

    • any new airport constructed to replace an existing Union connecting point which cannot be developed further on its site.

  3. 3.

    Regional connecting points and accessibility points will include all airports

    • with an annual traffic volume of between 500 000 and 899 999 passenger movements, of which less than 30 % are non-national,

      or

    • with an annual traffic volume of between 250 000 minus 10 % and 499 999 passenger movements,

      or

    • with an annual traffic volume of between 10 000 and 49 999 tonnes freight throughput,

      or

    • located on an island of a Member State,

      or

    • located in a landlocked area of the Union with commercial services operated by aircraft with a maximum take-off weight in excess of 10 tonnes.

    An airport is located in a landlocked area if it is situated outside a radius of over 100 km from the nearest international or Union connecting point. This distance may, by way of exception, be reduced to 75 km in order to take account of difficult access due to the geographical situation or the poor quality of the inland transport infrastructure.

II.Specifications for projects of common interest related to the airport network

All project will qualify as a project of common interest if it meets the following specifications:

Project specifications

Type of connecting point principally concerned21

I. Optimisation of existing airport capacity

Measure 1: Optimisation of the existing capacity in terms of aircraft, passenger or freight movements, including the airport's air navigation equipment

International connecting point

Union connecting point

Regional connecting point and accessibility point

Measure 2: Improvement of airport security and safety

International connecting point

Union connecting point

Regional connecting point and accessibility point

Measure 3: Adaptation of existing infrastructures made necessary by completion of the internal market and in particular by the measures governing the free movement of persons within the Union

International connecting point

Union connecting point

Regional connecting point and accessibility point

II. Development of new airport capacities

Measure 4: Development of the infrastructure and equipment which determine airport capacity in terms of aircraft, passenger or freight movements, including the airport's air navigation equipment

International connecting point

Union connecting point

Measure 5: Construction of new airport to replace an existing airport or airport system which cannot be developed further on its site

International connecting point

Union connecting point

III. Improvement of protection against nuisances generated by airport activities

Measure 6: Improvement of environmental compatibility in terms of noise and the treatment of airport effluent

International connecting point

Union connecting point

IV. Improvement or development of airport access

Measure 7: Improvement or development of interfaces between the airport and access infrastructures

International connecting point

Union connecting point

Measure 8: Improvement and development of interconnections with other transport networks, and more specifically the rail network

International connecting point

Union connecting point

This table does not exclude the measures concerned from being extended to other connecting points in certain, duly justified, special cases.

SECTION 7COMBINED TRANSPORT NETWORK

In addition to the projects relating to links specified in Annex I, projects of common interest will be deemed to include any project concerning:

  • construction or upgrading of railway or inland waterway infrastructures in order to make the transport of intermodal loading units technically possible and economically viable,

  • construction or development of centres for transfers between inland types of transport, including the setting up within the terminal of transhipment equipment with the corresponding infrastructure,

  • adaptation of port areas, making it possible to develop or improve combined transport between sea transport and rail, inland waterway or road transport,

  • railway transport equipment specially adapted to combined transport where so required by the nature of the infrastructure, particularly as regards the cost of the possible adaptation of such infrastructure and subject to the use of such equipment being associated with the infrastructure in question and the operators concerned being able to avail themselves of it on a non-discriminatory basis.

SECTION 8SHIPPING INFORMATION AND MANAGEMENT NETWORK

Projects of common interest will be deemed to include any project:

  • relating to the objectives of Union shipping safety policy,

    or

  • designed to implement international conventions and resolutions of the International Maritime Organisation (IMO) in the area of shipping safety and concerning:

    • implementation of the Union system of notification of vessels bound for or coming from Union ports or transiting off Union coasts, with the aid of an electronic system of data exchanges also including transmission of data between vessels and land installations via transponders, particular attention will be given to EDI (electronic data interchange) electronic systems of data exchange including compatible interfaces,

    • the development and improvement of the LORAN-C land-based radio-navigation channels,

    • the development or improvement of coastal and port shipping management and information systems (VTS) and their interconnection, with a view to safer and more effective surveillance and management of shipping, in particular in converging, busy, or environmentally sensitive areas,

    • the development of tools to improve understanding of traffic: databases on traffic flows and shipping accidents, development of the European Permanent Traffic Observatory (EPTO) tool for analysing traffic flows,

    • the development of infrastructure and equipment in order to further the implementation of the Global Maritime Distress and Safety System (GMDSS),

    • the improvement of telematic data exchange systems in the context of port state control of vessels.

SECTION 9AIR TRAFFIC MANAGEMENT NETWORK

Projects of common interest are deemed to include any project leading to an increase in the capacity of the system and optimising its use which forms part of a pattern of harmonisation and integration of the facilities and procedures of the various national connecting points and complies with the relevant international standards defined by the International Civil Aviation Organisation (ICAO) and by the competent European bodies, all of the foregoing taking account in particular of the European Organisation for the Safety of Air Navigation (Eurocontrol).

Such projects relate to:

  • studies on better utilisation of airspace by the various users and the establishment of a consistent and efficient system of routes,

  • air traffic planning and management which helps supply keep pace with demand and makes optimal use of available control capacities,

  • the studies and work necessary for the harmonisation of facilities and procedures so as to integrate the various service providers taking particular account of the guidelines adopted by the European Civil Aviation Conference (ECAC),

  • the improvement of system productivity, in particular by means of automated control assistance and potential conflict detection and resolution systems,

  • contributions to the installation of means of communication, navigation and surveillance necessary for air traffic control, including the promotion of new technologies, in particular satellites and digital data networks, where that leads to compliance with European common specifications.

SECTION 10POSITIONING AND NAVIGATION NETWORK

Projects of common interest are deemed to include any project relating to the establishment of any component of the future European Radio Navigation Plan or of a global satellite positioning and navigation system forming part of the following structure:

  • control centre comprising a processing and control system,

  • network of earth navigation stations,

  • space segment composed of satellites enabling navigation signals to be transmitted,

  • network of surveillance stations.

ANNEX IIIPRIORITY PROJECTS ON WHICH WORK IS DUE TO START BEFORE 2010

1.Railway axis Berlin-Verona/Milan-Bologna-Naples-Messina-Palermo

  • Halle/Leipzig-Nuremberg (2015)

  • Nuremberg-Munich (2006)

  • Munich-Kufstein (2015)

  • Kufstein-Innsbruck (2009)

  • Brenner Tunnel (2015), cross-border section

  • Verona-Naples (2007)

  • Milan-Bologna (2006)

  • Rail/road bridge over the Strait of Messina-Palermo (2015)

2.High-speed railway axis Paris-Brussels-Cologne-Amsterdam-London

  • Channel tunnel-London (2007)

  • Brussels-Liège-Cologne (2007)

  • Brussels-Rotterdam-Amsterdam (2007)22

3.High-speed railway axis of south-west Europe

  • Lisbon/Porto-Madrid (2011)23

  • Madrid-Barcelona (2005)

  • Barcelona-Figueras-Perpignan (2008)

  • Perpignan-Montpellier (2015)

  • Montpellier-Nîmes (2010)

  • Madrid-Vitoria-Irún/Hendaye (2010)

  • Irún/Hendaye-Dax, cross-border section (2010)

  • Dax-Bordeaux (2020)

  • Bordeaux-Tours (2015)

4.High-speed railway axis east

  • Paris-Baudrecourt (2007)

  • Metz-Luxembourg (2007)

  • Saarbrücken-Mannheim (2007)

5.Betuwe line (2007)

6.Lyon-Trieste-Divača/Koper-Divača-Ljubljana-Budapest-Ukrainian border rail link24

  • Lyon-St Jean de Maurienne (2015)

  • Mont-Cenis tunnel (2015-2017), cross-border section

  • Bussoleno-Turin (2011)

  • Turin-Venice (2010)

  • Venice-Ronchi Sud-Trieste-Divača (2015)

  • Koper-Divača-Ljubljana (2015)

  • Ljubljana-Budapest (2015)

7.Motorway axis Igoumenitsa/Patra-Athens-Sofia-Budapest

  • Via Egnatia (2006)

  • Pathe (2008)

  • Sofia-Kulata-Greek/Bulgarian border motorway (2010), with Promahon-Kulata as cross-border section

  • Nadlac-Sibiu motorway (branch towards Bucharest and Constanța) (2007)

8.Multimodal axis Portugal/Spain-rest of Europe25

  • Railway La Coruña-Lisbon-Sines (2010)

  • Railway Lisbon-Valladolid (2010)

  • Railway Lisbon-Faro (2004)

  • Lisbon-Valladolid motorway (2010)

  • La Coruña-Lisbon motorway (2003)

  • Seville-Lisbon motorway (completed 2001)

  • New Lisbon airport (2015)

9.Railway axis Cork-Dublin-Belfast-Stranraer26 (2001)

10.Malpensa (completed 2001)27

11.Öresund fixed link (completed 2000)28

12.Nordic triangle railway/road axis

  • Road and railway projects in Sweden (2010)29

  • Helsinki-Turku motorway (2010)

  • Railway Kerava-Lahti (2006)

  • Helsinki-Vaalimaa motorway (2015)

  • Railway Helsinki-Vainikkala (Russian border) (2014)

13.UK/Ireland/Benelux road axis (2010)

14.West coast main line (2007)

15.Galileo (2008)

16.Freight railway axis Sines/Algeciras-Madrid-Paris

  • New high-capacity rail axis across the Pyrenees

  • Railway Sines-Badajoz (2010)

  • Railway line Algeciras-Bobadilla (2010)

17.Railway axis Paris-Strasbourg-Stuttgart-Vienna-Bratislava

  • Baudrecourt-Strasbourg-Stuttgart (2015) with the Kehl bridge as cross-border section

  • Stuttgart-Ulm (2012)

  • Munich-Salzburg (2015), cross-border section

  • Salzburg-Vienna (2012)

  • Vienna-Bratislava (2010), cross-border section

18.Rhine/Meuse-Main-Danube inland waterway axis30

  • Rhine-Meuse (2019) with the lock of Lanaye as cross-border section

  • Vilshofen-Straubing (2013)

  • Vienna-Bratislava (2015), cross-border section

  • Sap-Mohács (2014)

  • Bottlenecks in Romania and Bulgaria (2011)

19.High-speed rail interoperability on the Iberian peninsula

  • Madrid-Andalusia (2010)

  • North-east (2010)

  • Madrid-Levante and Mediterranean (2010)

  • North/North-west corridor, including Vigo-Porto (2010)

  • Extremadura (2010)

20.Fehmarn Belt railway axis

  • Fehmarn Belt fixed rail/road link (2014)

  • Railway for access in Denmark from Öresund (2015)

  • Railway for access in Germany from Hamburg (2015)

  • Railway Hannover-Hamburg/Bremen (2015)

21.Motorways of the Sea (MoS)

Projects of common interest identified in accordance with Article 13 and concerning the following motorways of the sea:

  • motorway of the Baltic Sea (linking the Baltic Sea Member States with Member States in central and western Europe, including the route through the North Sea/Baltic Sea Canal (Kiel Canal) (2010)),

  • motorway of the sea of western Europe (leading from Portugal and Spain via the Atlantic Arc to the North Sea and the Irish Sea) (2010),

  • motorway of the sea of south-east Europe (connecting the Adriatic Sea to the Ionian Sea and the Eastern Mediterranean to include Cyprus) (2010),

  • motorway of the sea of south-west Europe (western Mediterranean), connecting Spain, France, Italy and including Malta, and linking with the motorway of the sea of south-east Europe (2010)31.

22.Athens-Sofia-Budapest-Vienna-Prague-Nuremberg/Dresden rail link32

  • Railway Greek/Bulgarian border-Kulata-Sofia-Vidin/Calafat (2015)

  • Railway Curtici-Brașov (towards Bucharest and Constanța) (2010)

  • Railway Budapest-Vienna (2010), cross-border section

  • Railway Břeclav-Prague-Nuremberg (2010), with Nuremberg-Prague as cross-border section

  • Railway axis Prague-Linz (2016)

23.Railway axis Gdańsk-Warsaw-Brno/Bratislava-Vienna33

  • Railway Gdańsk-Warsaw-Katowice (2015)

  • Railway Katowice-Břeclav (2010)

  • Railway Katowice-Žilina-Nové Mesto n. V. (2010)

24.Lyon/Genova-Basel-Duisburg-Rotterdam/Antwerp rail link

  • Lyon-Mulhouse-Mülheim34, with Mulhouse-Mülheim as cross-border section (2018)

  • Genova-Milan/Novara-Swiss border (2013)

  • Basel-Karlsruhe (2015)

  • Frankfurt-Mannheim (2012)

  • Duisburg-Emmerich (2009)35

  • ‘Iron Rhine’ Rheidt-Antwerp, cross-border section (2010)

25.Motorway axis Gdańsk-Brno/Bratislava-Vienna36

  • Gdańsk-Katowice motorway (2010)

  • Katowice-Brno/Žilina motorway (2010), cross-border section

  • Brno-Vienna motorway (2009), cross-border section

26.Railway/road axis Ireland/United Kingdom/continental Europe

  • Road/railway axis linking Dublin with the North (Belfast-Larne) and South (Cork) (2010)37

  • Road/railway axis Hull-Liverpool (2015)

  • Railway Felixstowe-Nuneaton (2011)

  • Railway Crewe-Holyhead (2008)

27.‘Rail Baltica’ axis Warsaw-Kaunas-Riga-Tallinn-Helsinki

  • Warsaw-Kaunas (2010)

  • Kaunas-Riga (2014)

  • Riga-Tallinn (2016)

28.‘Eurocaprail’ on the Brussels-Luxembourg-Strasbourg railway axis

  • Brussels-Luxembourg-Strasbourg (2012)

29.Railway axis of the Ionian/Adriatic intermodal corridor

  • Kozani-Kalambaka-Igoumenitsa (2012)

  • Ioannina-Antirrio-Rio-Kalamata (2014)

30.Inland waterway Seine-Scheldt

Navigability improvements Deulemont-Gent (2012-2014-2016)

Compiègne-Cambrai (2012-2014-2016)

The date, agreed in advance, for completing the work is shown in brackets. The dates for completing the work for projects 1 to 20 and 30 and the details of the sections are as indicated in the High-Level Group's report where these have actually been identified.

ANNEX IV

Repealed Decision with list of its successive amendments

Decision No 1692/96/EC of the European Parliament and of the Council

(OJ L 228, 9.9.1996, p. 1)

Decision No 1346/2001/EC of the European Parliament and of the Council

(OJ L 185, 6.7.2001, p. 1)

2003 Act of Accession, Annex II, point 8.F

(OJ L 236, 23.9.2003, p. 447)

Decision No 884/2004/EC of the European Parliament and of the Council

(OJ L 167, 30.4.2004, p. 1)

Council Regulation (EC) No 1791/2006

(OJ L 363, 20.12.2006, p. 1)

Point 6(D) of the Annex only

ANNEX V

Correlation table

Decision No 1692/96/EC

This Decision

Article 1(1)

Article 1(1)

Article 1(2), first sentence

Article 1(2), first sentence

Article 1(2), second sentence

Article 7(1)

Article 1(2), third sentence

Article 1(2), second sentence

Article 1(3)

Article 1(3)

Articles 2 to 6

Articles 2 to 6

Article 7(1), introductory wording

Article 7(2), introductory wording

Article 7(1), first indent

Article 7(2)(a)

Article 7(1), second indent

Article 7(2)(b)

Article 7(1), third indent

Article 7(2)(c)

Article 7(1), fourth indent

Article 7(2)(d)

Article 7(2), introductory wording

Article 7(3), introductory wording

Article 7(2), first indent

Article 7(3)(a)

Article 7(2), second indent

Article 7(3)(b)

Article 7(3)

Article 7(4)

Article 8(1), first subparagraph

Article 8(1), first subparagraph

Article 8(1), second subparagraph, first sentence

Article 8(1), second subparagraph

Article 8(1), second subparagraph, second sentence

Article 8(1), third subparagraph

Article 8(2)

Article 8(2)

Article 9(1), introductory wording

Article 9(1), introductory wording

Article 9(1), first indent

Article 9(1)(a)

Article 9(1), second indent

Article 9(1)(b)

Article 9(1), third indent

Article 9(1)(c)

Article 9(1), fourth indent

Article 9(1)(d)

Article 9(2) and (3)

Article 9(2) and (3)

Article 10(1)

Article 10(1)

Article 10(2), first subparagraph

Article 10(2), first subparagraph

Article 10(2), second subparagraph, first sentence

Article 10(2), second subparagraph

Article 10(2), second subparagraph, second sentence

Article 10(2), third subparagraph

Article 10(3) to (6)

Article 10(3) to (6)

Article 11(1), (2) and (3)

Article 11(1), (2) and (3)

Article 11(3a)

Article 11(4), first subparagraph

Article 11(3b)

Article 11(4), second subparagraph

Article 11(4)

Article 11(5)

Article 12

Article 12

Article 12a(1) to (4)

Article 13(1) to (4)

Article 12a(5), introductory wording

Article 13(5), introductory wording

Article 12a(5), first indent

Article 13(5)(a)

Article 12a(5), second indent

Article 13(5)(b)

Article 12a(5), third indent

Article 13(5)(c)

Article 12a(6), first and second sentences

Article 13(7), first subparagraph

Article 12a(6), third sentence

Article 13(7), second subparagraph

Article 12a(7)

Article 13(6)

Article 13

Article 14

Article 14, introductory sentence

Article 15, introductory sentence

Article 14, first indent

Article 15(a)

Article 14, second indent

Article 15(b)

Article 14, third indent

Article 15(c)

Article 15, introductory and final sentences

Article 16, introductory sentence

Article 15, first indent

Article 16(a)

Article 15, second indent

Article 16(b)

Article 15, third indent

Article 16(c)

Article 15, fourth indent

Article 16(d)

Article 16

Article 17

Article 17

Article 18

Article 17a(1), first sentence

Article 19(1)

Article 17a(1), second, third and fourth sentences

Article 19(4)

Article 17a(2) and (3)

Article 19(2) and 3)

Article 17a(4)

Article 19(6)

Article 17a(5)

Article 19(5)

Article 17a(6)

Article 19(7)

Article 18(1)

Article 20

Article 18(2), first sentence

Article 21(1)

Article 18(2), second sentence

Article 21(2)

Article 18(3), first sentence

Article 22, first paragraph

Article 18(3), second sentence

Article 22, second paragraph

Article 18(3), third and fourth sentences

Article 22, third paragraph

Article 19

Article 23

Article 19a(1)

Article 24

Article 19a(2), introductory wording

Article 25(1), introductory wording

Article 19a(2)(a) and (b)

Article 25(1)(a) and (b)

Article 25(2), introductory wording

Article 19a(2)(c) and (d)

Article 25(2)(a) and (b)

Article 19a(3)

Article 25(3)

Article 19a(4)

Article 26(1)

Article 19a(5), first sentence

Article 26(2), first subparagraph

Article 19a(5), second sentence

Article 26(2), second subparagraph

Article 19a(6)

Article 27(1)

Article 19a(7)

Article 27(2)

Article 19a(8)

Article 27(3)

Article 19a(9)

Article 27(4)

Article 19b, first sentence

Article 28, first paragraph

Article 19b, second sentence

Article 28, second paragraph

Article 22

Article 29, first paragraph

Article 29, second paragraph

Article 23

Article 30

Article 24

Article 31

Annex I

Annex I

Annex II

Annex II

Annex III

Annex III

Annex IV

Annex V