1. Introductory Text

  2. Article 1.Reporting by Member States

  3. Article 2.This Decision is addressed to the Member States.

  4. Signature

    1. ANNEX I

      Questionnaire on the implementation of Directive 2010/75/EU as referred to in the second paragraph of Article 1

      1. General notes:

        1. (a) The replies to this questionnaire shall cover the period from...

        2. (b) Where a question seeks information on time-variable parameters, the response...

        3. (c) In the replies to the questions below, information shall only...

        4. (d) In this questionnaire, ‘Member State policy or guidance’ shall be...

      2. 1. Non-compliance (Article 8)

      3. 2. Permit conditions (Article 14)

      4. 3. Emission limit values, equivalent parameters and technical measures (Article 15)...

      5. 4. Monitoring requirements (Article 16)

      6. 5. General Binding Rules (Article 17)

      7. 6. Developments in BAT (Article 19)

      8. 7. Reconsideration and updating of permits (Article 21)

      9. 8. Site closure (Article 22)

      10. 9. Environmental inspections (Article 23)

      11. 10. Access to information and public participation (Article 24)

      12. 11. Emerging techniques (Article 27)

    2. ANNEX II

      Questionnaire on the implementation of Directive 2010/75/EU as referred to in the third paragraph of Article 1

      1. General notes:

        1. (a) This questionnaire covers the period from 7 January 2013 to...

        2. (b) Where a question seeks information on time-variable parameters, the response...

      2. MODULE 1 — IMPLEMENTATION UPDATE

        1. Module 1 note:

          1. 1. Implementation – changes

          2. 2. Implementation — difficulties

      3. MODULE 2 – INFORMATION ON INDIVIDUAL INSTALLATIONS

        1. Module 2 note:

          1. 3. Provide the following information for all installations covered by Chapter...

      4. MODULE 3 – SECTORAL SPOTLIGHT

        1. Module 3 notes:

          1. 4. Permit conditions (Article 14)

          2. 5. Stricter permit conditions (Articles 14(4) and 18)

            1. 5.1. Which environmental quality standards required stricter permit conditions than those...

            2. 5.2. Provide examples of other situations where the competent authorities have,...

          3. 6. Setting permit conditions in the absence of relevant BAT conclusions...

            1. 6.1. Describe the procedure for, and examples of, setting permit conditions:...

            2. 6.2. For the above examples, identify:

          4. 7. Emission limit values, equivalent parameters and technical measures (Article 15)...

            1. 7.1. For permits where one or more emission limit value(s) are...

            2. 7.2. For all installations where an Article 15(4) derogation has been...

            3. 7.3. Have temporary derogations been granted for the testing and use...

          5. 8. Monitoring (Article 16)

            1. 8.1. In general terms, what monitoring frequencies have been set in...

            2. 8.2. How have BAT conclusions been used to determine these frequencies?...

          6. 9. Reconsideration and updating of permit conditions (Article 21)

          7. 10. Other

      5. MODULE 4 – ‘MINIMUM’ REQUIREMENTS

        1. 11. Waste incineration and co-incineration:

        2. 12. Solvent Emissions