ANNEXU.K.PROGRAMME FOR THE IMPLEMENTATION OF THE DIRECTIVE 91/271/EEC

Table 1

Basic Information

a

Personal data (name, phone, etc.) will be registered according to Article 2(b) of the Regulation (EC) No 45/2001 of the European Parliament and of the Council (OJ L 8, 12.1.2001, p. 1).

Member State:
Date of reporting:
Reference date used for identification of non-compliance or pending deadlines (Tables 2 and 3):
Name of the Contact Person for reportinga:
Institution:
Street:
Post Code:
City:
Phone:
Email:
Any other remark:

Member State:

Table 2

A —Collecting systems or IASa of agglomerations of 2 000 p.e. and larger than 2 000 p.e. not compliant at the reference date

a

Individual systems or Appropriate Systems (Article 3.1 of the Directive).

b

Same ID of the agglomeration used for reporting under Article 15(4).

c

Only necessary if the construction of the collecting system or IAS has not started at the reference date.

d

E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …

Basic Data on the AgglomerationArticle 3 collecting systems and IAS measure(s)
ID of the agglomerationbName of the agglomerationStatus of the agglomerationIdentified reason(s) for non complianceMeasure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS)Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, consents as required at MS level, etc.)cStart date or expected start date for works on the collecting systems or IASExpected date of completion of the collecting system or IAS worksForecast investment cost for the collecting system or IAS (as in the national plan)Name of EU fund planned to be used to complete the collecting system or IAS (if any)dAmount of (planned) EU funds likely to be requested to complete the collecting system or IAS (if any)Any relevant comment on collecting system or IAS
Not compliant (NC)(mm/yyyy)(mm/yyyy )(mm/yyyy )EUREUR
NC
NC

B —

Collecting systems or IAS of agglomerations of 2 000 p.e. and larger than 2 000 p.e. for which pending deadlines existeda at the reference date

a

Including those deadlines set by the Accession Treaties

b

Same ID of the agglomeration used for reporting under Article 15(4).

c

Only necessary if the construction of the collecting system or IAS has not started at the reference date.

d

E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …

Basic Data on the AgglomerationArticle 3 collecting systems or IAS measure(s)
ID of the agglomerationbName of the agglomerationStatus of the agglomerationMeasure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS)Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, consents as required at MS level, etc.)cStart date or expected start date for works on the collecting systems or IASExpected date of completion of the collecting system or IAS worksForecast investment cost for the collecting system or IAS (as in the national plan)Name of EU fund planned to be used to complete the collecting system or IAS (if any)dAmount of (planned) EU funds likely to be requested to complete the collecting system or IAS (if any)Any relevant comment on collecting system or IAS
Pending Deadlines (PD)(mm/yyyy)(mm/yyyy )(mm/yyyy )EUREUR
PD
PD

Member State:

Table 3

A —Urban waste water treatment plants (UWWTP) of agglomerations of 2 000 p.e. and larger than 2 000 p.e. not compliant at the reference datea

a

Information on individual plant level of agglomerations of more than 10 000 p.e., as regard the lack of nitrogen or phosphorus removal, is not required according to the Directive for sensitive areas where it can be shown that the minimum percentage of reduction of the overall load entering all urban waste water treatment plants in that area is at least 75 % for total phosphorus and at least 75 % for total nitrogen at the reference date.

b

Article 7 refers only to agglomerations of less than 10 000 p.e. which discharge to coastal waters.

c

Same ID of the UWWTP used for reporting under Article 15(4).

d

Only necessary if the construction of the UWWTP has not started at the reference date.

e

E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …

Basic Data on the UWWTPUWWTPs Articles 4, 5 and 7b measure(s)
ID of the UWWTPcName of the UWWTPID(s) of the agglomeration(s) servedName(s) of the agglomeration(s) servedStatus of the UWWTPIdentified reason(s) for non-complianceMeasure(s) to reach compliance needed for UWWTPLoad entering the UWWTP at the expected date of compliance (as planned)Organic design capacity UWWTP (as planned)Type of treatment UWWTP (as planned)Date or expected date of completion of preparatory measures (planning, design, etc.)dDate or expected start date for worksDate or expected date of completion of worksExpected date of compliance (12 months of samples)Forecast cost investment needed for the UWWTP (as in the national plan)Name of EU fund planned to be used (if any)eAmount of (planned) EU funding neededAny relevant comment on UWWTP
Not compliant (NC)E.g. inadequate design/obsolescence/new requirements/ increase of the load/faulty operation/..p.e.p.e.1, 2, 3-N, 3-P, 3-microbiology, 3-other(mm/yyyy )(mm/yyyy )(mm/yyyy )(mm/yyyy )EUREUR
NC
NC

B —

Urban waste water treatment plants of agglomerations of 2 000 p.e. and larger than 2 000 p.e. for which pending deadlines existeda at the reference dateb

a

Including those deadlines set by the Accession Treaties or by the definition of new sensitive areas (Article 5).

b

Information on individual plant level of agglomerations of more than 10 000 p.e., as regard the lack of nitrogen or phosphorus removal, is not required according to the Directive for sensitive areas where it can be shown that the minimum percentage of reduction of the overall load entering all urban waste water treatment plants in that area is at least 75 % for total phosphorus and at least 75 % for total nitrogen at the reference date.

c

Same ID of the UWWTP used for reporting under Article 15(4).

d

Only necessary if the construction of the UWWTP has not started at the reference date.

e

E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …

Basic Data on the UWWTPUWWTPs article 4, 5 and 7 measure(s)
ID of the UWWTPcName of the UWWTPID(s) of the agglomeration(s) servedName(s) of the agglomeration(s) servedStatus of the UWWTPMeasure(s) to reach compliance needed for UWWTPLoad entering the UWWTP at the expected date of compliance (as planned)Organic design capacity UWWTP (as planned)Type of treatment UWWTP (as planned)Date of expected date of completion of preparatory measures (planning, design, etc.)dDate or expected start date for worksDate or expected date of completion of worksExpected date of compliance (12 months of samples)Forecast cost investment needed for the UWWTP (as in the national plan)Name of EU fund planned to be used UWWTP (if any)eAmount of (planned) EU funding neededAny relevant comment on UWWTP
Pending Deadlines (PD)p.e.p.e.1, 2, 3-N, 3-P, 3-microbiology, 3-other(mm/yyyy )(mm/yyyy )(mm/yyyy )(mm/yyyy )EUREUR
PD
PD

Member State:

Table 4

Current and expected total organic design capacity and investment costs at national level

a

Choose the last known period or year.

b

Indicate euros in current price giving reference date (in mm/yyyy) and whether VAT included or not.

Period coveredCurrent and expected situationCurrent or expected total organic design capacity of all UWWTPs at the end of the periodCurrent or expected investment costs of the collecting systems (new and renewal)Current or expected investment costs of the treatment plants (new and renewal)
Current/Expectedp.e.million EURbmillion EURb
from 1 January xxxx to end xxxxaCurrent
from 1 January xxxx to end xxxxExpected
from 1 January xxxx to end xxxxExpected
from 1 January xxxx to end xxxxExpected
from 1 January xxxx to end xxxxExpected
from 1 January xxxx to end xxxxExpected
from 1 January xxxx to end xxxxExpected
from 1 January xxxx to end xxxxExpected

Member State:

Table 5

Other issues to be considered for drafting the national programme

Relevant information, if any, should be provided as free texta

a

E.g an existing national programme is considered as a response to Table 5 request.

b

Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 establishing a framework for Community action in the field of water policy (OJ L 327, 22.12.2000, p. 1).

c

Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment (OJ L 197, 21.7.2001, p. 30).

d

Directive 2008/56/EC of the European Parliament and of the Council of 17 June 2008 establishing a framework for community action in the field of marine environmental policy (Marine Strategy Framework Directive) (OJ L 164, 25.6.2008, p. 19).

TopicPresence in the programme
Status of the National Programme

When was the NP established and when was, if necessary, the last update?

Has the NP been adopted as a legally binding instrument? If affirmative, which one?

How long the NP is intended to run for?

Main drivers

What are the main drivers in the NP: reaching compliance, ensuring maintenance and renewal, etc?

Is it possible to have a break down of the associated costs for each?

Relations with other pieces of EU legislation

To what extent have the actions in the NP been included in the relevant River Basin Management Plans under Directive 2000/60/EC of the European Parliament and of the Councilb?

Notwithstanding sensitive areas designated under Directive 91/271/EEC, does the NP include actions triggered by the protected areas referred to by Annex IV to Directive 2000/60/EC (bathing waters, Natura 2000, shellfish, drinking water...)? If yes, please describe these actions.

Has the NP been subject to an assessment under Directive 2001/42/EC of the European Parliament and of the Councilc? If yes, please give details.

Does the NP have links with progressive reduction of discharges, emissions and losses of priority substances and the cessation or phasing-out of discharges, emissions and losses of the priority hazardous substances (Article 4 of Directive 2000/60/EC)? If yes, describe the actions.

Does the NP have links with Directive 2008/56/EC of the European Parliament and of the Councild (e.g. decrease of marine litter) ? If yes, please give details.

Does the NP have links with International Conventions or Commissions ? If yes, please describe the links.

Is there any action foreseen to design additional sensitive areas under Annex II.A(c) to Directive 91/271/EEC? If yes, describe these actions?

Is there any action foreseen to apply more stringent treatment to comply with Article 4.3 or 5.3 and Annex I.B.4 to Directive 91/271/EEC? If yes, please give details?

...

Use of EU funds

What is the forecast amount of EU Funds for the implementation of the actions in the NP?

what is the breakdown of EU funds used?

...

Information systems

Is the NP published online? Where?

Is there any system online allowing for the tracking of the implementation of the NP on a regular basis? Please give details.

Other requirements of Directive 91/271/EEC

Is any action considered necessary to ensure sufficient performance of UWWTP under all normal climatic conditions (Article 10 and Annex I.B) ?

Is any action foreseen to reduce storm water overflows (Article 3.2 and Annex I.A)?

Is any action foreseen to implement Article 7?

Is any action foreseen to promote the reuse of treated wastewater (Article 12.1)?

Is any action foreseen to implement Article 14 regarding sludge management?

Is any action foreseen to reduce industrial waste water discharges to collecting systems to ensure compliance with the requirements of Annex I.C?

...

Other

Give details of any ongoing or planned research with regard to innovative developments in sanitation policy.

Are there any EU funds used in this respect?