Directive 2001/16/EC of the European Parliament and of the Council (repealed)Show full title

Directive 2001/16/EC of the European Parliament and of the Council of 19 March 2001 on the interoperability of the trans-European conventional rail system (repealed)

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Status:

EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.

ANNEX VIU.K.VERIFICATION PROCEDURE FOR SUBSYSTEMS

1.INTRODUCTIONU.K.

‘EC’ verification is the procedure whereby a notified body checks and certifies, at the request of a contracting entity or of its authorised representative established within the Community, that a subsystem:

  • complies with the Directive;

  • complies with the other regulations deriving from the Treaty, and may be put into operation.

2.STAGESU.K.

The subsystem is checked at each of the following stages:

  • overall design;

  • construction of subsystem, including, in particular, civil-engineering activities, constituent assembly, overall adjustment;

  • final testing of the subsystem.

3.CERTIFICATEU.K.

The notified body responsible for ‘EC’ verification draws up the certificate of conformity intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the ‘EC’ declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.

4.TECHNICAL FILEU.K.

The technical file accompanying the declaration of verification must be made up as follows:

  • for infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete;

  • for the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.;

  • list of interoperability constituents, as referred to in Article 3, incorporated into the subsystem;

  • copies of the ‘EC’ declarations of conformity or suitability for use with which the abovementioned constituents must be provided in accordance with Article 13 of the Directive accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications;

  • certificate from the notified body responsible for ‘EC’ verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with this Directive and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.

5.MONITORINGU.K.

5.1.The aim of ‘EC’ monitoring is to ensure that the obligations deriving from the technical file have been met during production of the subsystem.U.K.

5.2.The notified body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The contracting entity or its authorised representative within the Community must send it or have sent to it all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem.U.K.

5.3.The notified body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the Directive. It must provide those responsible for implementation with an audit report. It may require to be present at certain stages of the building operations.U.K.

5.4.In addition, the notified body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the notified body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report.U.K.

6.SUBMISSIONU.K.

The complete file referred to in paragraph 4 must be lodged with the contracting entity or its authorised agent established within the Community in support of the certificate of conformity issued by the notified body responsible for verification of the subsystem in working order. The file must be attached to the ‘EC’ declaration of verification which the contracting entity sends to the supervisory authority in the Member State concerned.

A copy of the file must be kept by the contracting entity throughout the service life of the subsystem. It must be sent to any other Member States which so request.

7.PUBLICATIONU.K.

Each notified body must periodically publish relevant information concerning:

  • requests for ‘EC’ verification received;

  • certificates of conformity issued;

  • certificates of conformity refused.

8.LANGUAGEU.K.

The files and correspondence relating to the ‘EC’ verification procedures must be written in an official language of the Member State in which the contracting entity or its authorised representative within the Community is established or in a language accepted by the entity.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources