Please note that the date you requested in the address for this web page is not an actual date upon which a change occurred to this item of legislation. You are being shown the legislation from , which is the first date before then upon which a change was made.

ANNEX VU.K.INFORMATION TO BE PROVIDED BY THE TERMINAL TO THE MASTER(as referred to in Article 7(2)(a))

1.The name of the berth at which loading or unloading will take place and the estimated times for berthing and completion of loading or unloading(1).U.K.

2.Characteristics of loading or unloading equipment, including the terminal's nominal loading or unloading rate and the number of loading or unloading heads to be used, as well as the estimated time required to complete each pour or — in the case of unloading — the estimated time required for each stage of the discharge.U.K.

3.Features on the berth or jetty the master may need to be aware of, including the position of fixed and mobile obstructions, fenders, bollards and mooring arrangements.U.K.

4.Minimum depth of water alongside the berth and in approach and departure channels(2).U.K.

5.Water density at the berth.U.K.

6.Maximum distance between the water line and the top of the cargo hatch covers or coamings, whichever is relevant to the loading or unloading operation, and the maximum air draught.U.K.

7.Arrangements for gangways and access.U.K.

8.Which side of the ship is to be alongside the berth.U.K.

9.Maximum allowable speed of approach to the jetty and availability of tugs, their type and bollard pull.U.K.