CHAPTER IIIU.K.GENERATION

Article 6U.K.Authorisation procedure for new capacity

1.For the construction of new generating capacity, Member States shall adopt an authorisation procedure, which shall be conducted in accordance with objective, transparent and non discriminatory criteria.

2.Member States shall lay down the criteria for the grant of authorisations for the construction of generating capacity in their territory. These criteria may relate to:

(a)the safety and security of the electricity system, installations and associated equipment;

(b)protection of public health and safety;

(c)protection of the environment;

(d)land use and siting;

(e)use of public ground;

(f)energy efficiency;

(g)the nature of the primary sources;

(h)characteristics particular to the applicant, such as technical, economic and financial capabilities;

(i)compliance with measures adopted pursuant to Article 3.

3.Member States shall ensure that authorisation procedures for small and/or distributed generation take into account their limited size and potential impact.

4.The authorisation procedures and criteria shall be made public. Applicants shall be informed of the reasons for any refusal to grant an authorisation. The reasons must be objective, non discriminatory, well founded and duly substantiated. Appeal procedures shall be made available to the applicant.

Article 7U.K.Tendering for new capacity

1.Member States shall ensure the possibility, in the interests of security of supply, of providing for new capacity or energy efficiency/demand-side management measures through a tendering procedure or any procedure equivalent in terms of transparency and non-discrimination, on the basis of published criteria. These procedures can, however, only be launched if on the basis of the authorisation procedure the generating capacity being built or the energy efficiency/demand-side management measures being taken are not sufficient to ensure security of supply.

2.Member States may ensure the possibility, in the interests of environmental protection and the promotion of infant new technologies, of tendering for new capacity on the basis of published criteria. This tender may relate to new capacity or energy efficiency/demand-side management measures. A tendering procedure can, however, only be launched if on the basis of the authorisation procedure the generating capacity being built or the measures being taken are not sufficient to achieve these objectives.

3.Details of the tendering procedure for means of generating capacity and energy efficiency/demand-side management measures shall be published in the Official Journal of the European Union at least six months prior to the closing date for tenders.

The tender specifications shall be made available to any interested undertaking established in the territory of a Member State so that it has sufficient time in which to submit a tender.

With a view to ensuring transparency and non-discrimination the tender specifications shall contain a detailed description of the contract specifications and of the procedure to be followed by all tenderers and an exhaustive list of criteria governing the selection of tenderers and the award of the contract, including incentives, such as subsidies, which are covered by the tender. These specifications may also relate to the fields referred to in Article 6(2).

4.In invitations to tender for the requisite generating capacity, consideration must also be given to electricity supply offers with long term guarantees from existing generating units, provided that additional requirements can be met in this way.

5.Member States shall designate an authority or a public body or a private body independent from electricity generation, transmission, distribution and supply activities, which may be a regulatory authority referred to in Article 23(1), to be responsible for the organisation, monitoring and control of the tendering procedure referred to in paragraphs 1 to 4. Where a transmission system operator is fully independent from other activities not relating to the transmission system in ownership terms, the transmission system operator may be designated as the body responsible for organising, monitoring and controlling the tendering procedure. This authority or body shall take all necessary steps to ensure confidentiality of the information contained in the tenders.