1.2.For each phase, the following environmental aspects must be assessed where relevant:U.K.
(a)
predicted consumption of materials, of energy and of other resources such as fresh water;
(b)
anticipated emissions to air, water or soil;
(c)
anticipated pollution through physical effects such as noise, vibration, radiation, electromagnetic fields;
(d)
expected generation of waste material; and
(e)
possibilities for reuse, recycling and recovery of materials and/or of energy, taking into account Directive 2002/96/EC.