ANNEX VIIContents of the implementing measures

(referred to in Article 15(8))

  1. 1.

    the exact definition of the type(s) of product(s) covered;

  2. 2.

    the ecodesign requirement(s) for the product(s) covered, implementing date(s), staged or transitional measures or periods:

    1. (a)

      in the case of generic ecodesign requirement(s), the relevant phases and aspects selected from those mentioned in Annex I, points 1.1 and 1.2, accompanied by examples of parameters selected from those mentioned in Annex I, point 1.3 as guidance when evaluating improvements regarding identified environmental aspects;

    2. (b)

      in the case of specific ecodesign requirement(s), its (their) level(s);

  3. 3.

    the ecodesign parameters referred to in Annex I, Part 1 relating to which no ecodesign requirement is necessary;

  4. 4.

    the requirements on installation of the product where it has a direct relevance to the product’s environmental performance considered;

  5. 5.

    the measurement standards and/or measurement methods to be used; where available, harmonised standards, the reference numbers of which have been published in the Official Journal of the European Union, must be used;

  6. 6.

    the details for conformity assessment under Decision 93/465/EEC:

    1. (a)

      where the module(s) to be applied is (are) different from Module A, the factors leading to the selection of that specific procedure;

    2. (b)

      where relevant, the criteria for approval and/or certification of the third parties;

    Where different modules are laid down in other CE requirements for the same product, the module defined in the implementing measure must prevail for the requirement concerned;

  7. 7.

    requirements on information to be provided by manufacturers notably on the elements of the technical documentation which are needed to facilitate the checking of the compliance of the product with the implementing measure;

  8. 8.

    the duration of the transitional period during which Member States must permit the placing on the market and/or putting into service of products which comply with the regulations in force in their territory on the date of adoption of the implementing measure;

  9. 9.

    the date for the evaluation and possible revision of the implementing measure, taking into account the speed of technological progress.