1. Member States shall lay down the necessary measures to establish regular inspections of the accessible parts of heating systems or of systems for combined space heating and ventilation, with an effective rated output of over 70 kW, such as the heat generator, control system and circulation pump(s) used for heating buildings. The inspection shall include an assessment of the efficiency and sizing of the heat generator compared with the heating requirements of the building and, where relevant, consider the capabilities of the heating system or of the system for combined space heating and ventilation to optimise its performance under typical or average operating conditions.
Where no changes have been made to the heating system or to the system for combined space heating and ventilation or to the heating requirements of the building following an inspection carried out pursuant to this paragraph, Member States may choose not to require the assessment of the heat generator sizing to be repeated.
2. Technical building systems that are explicitly covered by an agreed energy performance criterion or a contractual arrangement specifying an agreed level of energy efficiency improvement, such as energy performance contracting, or that are operated by a utility or network operator and therefore subject to performance monitoring measures on the system side, shall be exempt from the requirements laid down in paragraph 1, provided that the overall impact of such an approach is equivalent to that resulting from paragraph 1.
3. As an alternative to paragraph 1 and provided that the overall impact is equivalent to that resulting from paragraph 1, Member States may opt to take measures to ensure the provision of advice to users concerning the replacement of heat generators, other modifications to the heating system or to the system for combined space heating and ventilation and alternative solutions to assess the efficiency and appropriate size of those systems.
Before applying the alternative measures referred to in the first subparagraph of this paragraph, each Member State shall, by means of submitting a report to the Commission, document the equivalence of the impact of those measures to the impact of the measures referred to in paragraph 1.
[F2Such a report shall be submitted to the Commission as part of the Member States' integrated national energy and climate plans referred to in Article 3 of Regulation (EU) 2018/1999.]
4. Member States shall lay down requirements to ensure that, where technically and economically feasible, non-residential buildings with an effective rated output for heating systems or systems for combined space heating and ventilation of over 290 kW are equipped with building automation and control systems by 2025.
The building automation and control systems shall be capable of:
(a) continuously monitoring, logging, analysing and allowing for adjusting energy use;
(b) benchmarking the building’s energy efficiency, detecting losses in efficiency of technical building systems, and informing the person responsible for the facilities or technical building management about opportunities for energy efficiency improvement; and
(c) allowing communication with connected technical building systems and other appliances inside the building, and being interoperable with technical building systems across different types of proprietary technologies, devices and manufacturers.
5. Member States may lay down requirements to ensure that residential buildings are equipped with:
(a) the functionality of continuous electronic monitoring that measures systems’ efficiency and informs building owners or managers when it has fallen significantly and when system servicing is necessary; and
(b) effective control functionalities to ensure optimum generation, distribution, storage and use of energy.
6. Buildings that comply with paragraph 4 or 5 shall be exempt from the requirements laid down in paragraph 1.]
Textual Amendments
F1 Substituted by Directive (EU) 2018/844 of the European Parliament and of the Council of 30 May 2018 amending Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency (Text with EEA relevance).
F2 Substituted by Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of the European Parliament and of the Council (Text with EEA relevance).