- Latest available (Revised)
- Original (As adopted by EU)
Commission Directive 2010/36/EU of 1 June 2010 amending Directive 2009/45/EC of the European Parliament and of the Council on safety rules and standards for passenger ships (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.
For ships which are constructed on or after 1 January 2003, where “A” class divisions are penetrated, such penetrations shall be tested in accordance with the Fire Test Procedures Code, to ensure that the fire resistance of the divisions is not impaired.
In the case of ventilation ducts Regulations II-2/B/9.2.2b and II-2/B/9.3 apply.
However, where a pipe penetration is made of steel or equivalent material having a thickness of 3 mm or greater and a length of not less than 900 mm (preferably 450 mm on each side of the division) and no openings, testing is not required.
Such penetrations shall be suitably insulated by extension of the insulation at the same level of the division.
Pipes other than steel or copper that penetrate “B” class divisions shall be protected by either:
a fire tested penetration device, suitable for the fire resistance of the division pierced and the type of the pipe used; or
a steel sleeve, having a thickness of not less than 1,8 mm and a length of not less than 900 mm for pipe diameters of 150 mm or more and not less than 600 mm for pipe diameters of less than 150 mm ( preferably equally divided to each side of the division).
The pipe shall be connected to the ends of the sleeve by flanges or couplings or the clearance between the sleeve and the pipe shall not exceed 2,5 mm or any clearance between pipe and sleeve shall be made tight by means of non-combustible or other suitable material.
In ships constructed on or after 1 January 2003, no-insulated metallic pipes penetrating “A” or “B” class divisions shall be of materials having a melting temperature which exceeds 950 °C for “A-0” and 850 °C for “B-0” class divisions.
NEW CLASS A, B, C AND D SHIPS: In spaces in which there is a risk of oils splashing or oil vapour, e.g. in machinery spaces of category A, the surface of the insulating material shall be impermeable by oil and oil vapour. Where there is covering by non-perforated steel plate or other non-combustible materials (not aluminium) which is the ultimate physical surface, this covering may be joined by seaming, riveting, etc.
In ships which are constructed on or after 1 January 2003:
Paint lockers shall be protected by one of the following systems:
a carbon dioxide system, designed to give a minimum volume of free gas equal to 40 % of the gross volume of the protected space;
a dry powder system, designed for at least 0,5 kg powder/m3;
a waterspraying or sprinkler system, designed for 5 litres/m2 min. Water spraying systems may be connected to the fire main of the ship; or
a system providing equivalent protection, as determined by the Administration of the flag State.
In any case the system shall be operable from outside the protected space.
Flammable liquid lockers shall be protected by an appropriate fire extinguishing arrangement approved by the Administration of the flag State.
For lockers of a deck area of less than 4 m2, which do not give access to accommodation spaces, a carbon dioxide portable extinguisher sized to provide a minimum volume of free gas equal to 40 % of the gross volume of the space may be accepted in lieu of a fixed system.
A discharge port shall be arranged in the locker to allow the discharge of the extinguisher without having to enter into the protected space. The required portable fire extinguisher shall be stowed adjacent to the port. Alternatively a port or hose connection may be provided to facilitate the use of fire main water.
When deep-fat friers, boiling and roasting apparatus are installed and used in spaces outside the main galley, the Administration of the flag State shall impose additional safety measures with regard to the specific fire hazards associated with the use of this type of equipment.
In ships which are constructed on or after 1 January 2003, deep-fat cooking equipment shall be fitted with the following:
an automatic or manual extinguishing system tested to an international standard in accordance with Publication ISO 15371:2000 on fire-extinguishing systems for protection of galley deep-fat cooking equipment;
a primary and backup thermostat with an alarm to alert the operator in the event of failure of either thermostat;
arrangements for automatically shutting off the electrical power upon activation of the extinguishing system;
an alarm for indicating operation of the extinguishing system in the galley where the equipment is installed; and
controls for manual operation of the extinguishing system, which are clearly labelled for ready use of the crew.
In ships which are constructed before 1 January 2003, new installations for deep-fat cooking equipment shall comply with the requirements of this paragraph.
In the implementation of fire proofing measures, steps shall be undertaken by the Administration of the flag State to prevent heat transfer through heat bridges, e.g. between decks and bulkheads.
In ships which are constructed on or after 1 January 2003, the insulation of a deck or bulkhead shall be carried past the penetration, intersection or terminal point for a distance of at least 450 mm in the case of steel and aluminium structures. If a space is divided with a deck or a bulkhead of “A” class standard having insulation of different values, the insulation with the higher value shall continue on the deck or bulkhead with the insulation of the lesser value for a distance of at least 450 mm.
All portable containers for gases which are compressed, liquefied or broken down under pressure, which may feed a possible fire, shall immediately after use be put in a suitable place above the bulkhead deck, from which there is direct access to open deck.
The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: