ANNEX XIIENERGY EFFICIENCY REQUIREMENTS FOR TRANSMISSION SYSTEM OPERATORS AND DISTRIBUTION SYSTEM OPERATORS

Annotations:

Transmission system operators and distribution system operators shall:

  1. (a)

    F1set up and make public their standard rules relating to the bearing and sharing of costs of technical adaptations, such as grid connections, grid reinforcements and the introduction of new grids, improved operation of the grid and rules on the non-discriminatory implementation of the grid codes, which are necessary in order to integrate new producers feeding electricity produced from high-efficiency cogeneration into the interconnected grid;

  2. (b)

    provide any new producer of electricity produced from high-efficiency cogeneration wishing to be connected to the system with the comprehensive and necessary information required, including:

    1. (i)

      a comprehensive and detailed estimate of the costs associated with the connection;

    2. (ii)

      a reasonable and precise timetable for receiving and processing the request for grid connection;

    3. (iii)

      a reasonable indicative timetable for any proposed grid connection. The overall process to become connected to the grid should be no longer than 24 months, bearing in mind what is reasonably practicable and non-discriminatory;

  3. (c)

    provide standardised and simplified procedures for the connection of distributed high-efficiency cogeneration producers to facilitate their connection to the grid.

The standard rules referred to in point (a) shall be based on objective, transparent and non-discriminatory criteria taking particular account of all the costs and benefits associated with the connection of those producers to the grid. They may provide for different types of connection.