xmlns:atom="http://www.w3.org/2005/Atom"

CHAPTER 4 CONFORMITY OF THE EXPLOSIVE

Article 20Conformity assessment procedures

For the assessment of the conformity of explosives the manufacturer shall follow one of the following procedures referred to in Annex III:

(a)

EU-type examination (Module B) and, at the choice of the manufacturer, any of the following:

(i)

conformity to type based on internal production control plus supervised product checks at random intervals (Module C2);

(ii)

conformity to type based on quality assurance of the production process (Module D);

(iii)

conformity to type based on product quality assurance (Module E);

(iv)

conformity to type based on product verification (Module F);

(b)

conformity based on unit verification (Module G).