- Latest available (Revised)
- Original (As adopted by EU)
Commission Directive (EU) 2015/996 of 19 May 2015 establishing common noise assessment methods according to Directive 2002/49/EC of the European Parliament and of the Council (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.
This usually follows the initial climb. As for all flight segments, the start-point altitude h1 , true airspeed VT1 , and thrust (Fn /δ)1 are those from the end of the preceding segment. The end-point calibrated airspeed VC2 and the average climb rate ROC are user inputs (bank angle ε is a function of speed and radius of turn). As they are interdependent, the end altitude h2 , end true airspeed VT2 , end thrust (Fn /δ)2 and segment track length Δs have to be calculated by iteration; the end altitude h 2 is guessed initially and then recalculated repeatedly using equations B-16 and B-17 until the difference between successive estimates is less than a specified tolerance, e.g. one foot. A practical initial estimate is h 2 = h 1 + 250 feet.
The segment track length (horizontal distance covered) is estimated as:
where
is a factor to account for effect of 8 kt headwind when climbing at 160 kt
is a constant to convert knots to ft/sec = 1,688 ft/s per kt
Using this estimate of Δs, the end altitude h 2′ is then re-estimated using:
h2′ = h 1 + s · G/0,95 | (B-18) |
As long as the error is outside the specified tolerance, the steps B-17 and B-18 are repeated using the current iteration segment-end values of altitude h 2, true airspeed VT2 , corrected net thrust per engine (Fn /δ)2. When the error is within the tolerance, the iterative cycle is terminated and the acceleration segment is defined by the final segment-end values.
If during the iteration process (amax – G·g) < 0,02 g, the acceleration may be too small to achieve the desired VC2 in a reasonable distance. In this case, the climb gradient can be limited to G = amax /g – 0,02, in effect reducing the desired climb rate in order to maintain acceptable acceleration. If G < 0,01 it should be concluded there is not enough thrust to achieve the acceleration and climb rate specified; the calculation should be terminated and the procedure steps revised(1).
The acceleration segment length is corrected for headwind w by using:
Thrust cutback is inserted into an acceleration segments in the same way as for a constant speed segment; by turning its first part into a transition segment. The cutback thrust level is calculated as for the constant-speed cutback thrust procedure, using equation B-1 only. Note it is not generally possible to accelerate and climb whilst maintaining the minimum engine-out thrust setting. The thrust transition is assigned a 1 000 ft (305 m) ground distance, and the corrected net thrust per engine at the end of 1 000 ft is set equal to the cutback value. The speed at the end of the segment is determined by iteration for a segment length of 1 000 ft. (If the original horizontal distance is less than 2 000 ft, one half of the segment is used for thrust change.) The final thrust on the second sub-segment is also set equal to the cutback thrust. Thus, the second sub-segment is flown at constant thrust.
In either case the computer model should be programmed to inform the user of the inconsistency.
The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: