[F1ANNEX IC U.K. SPECIFIC INSTRUCTIONS FOR COMPLETING THE NOTIFICATION AND MOVEMENT DOCUMENTS

V. Specific instructions for completing the movement document U.K.

41. Blocks 10 and 11: Reproduce the information given in blocks 10 and 11 in the notification document. If the disposer or recoverer is also the consignee, write in block 10: ‘Same as block 4’. If the disposal or recovery operation is a D13–D15 or R12 or R13 operation (according to [F2Annex 1 or 2 of Directive 2008/98/EC]), the information on the facility performing the operation provided in block 10 is sufficient. No further information on any subsequent facilities performing R12/R13 or D13–D15 operations and the subsequent facility(ies) performing the D1–D12 or R1–R11 operation(s) needs to be included in the movement document. ]U.K.