ANNEXU.K.STATUTES OF THE JOINT UNDERTAKING

Article 1U.K.Members

1.The following shall be founding members of the Joint Undertaking:

2.The following may become members of the Joint Undertaking:

3.Any request for accession shall be addressed to the Executive Director, who shall transmit it to the Administrative Board. The Administrative Board shall decide whether to authorise negotiations. If authorisation is given, the Executive Director shall negotiate the conditions of accession and submit them to the Administrative Board. These conditions shall include, in particular, provisions relating to the financial contributions and representation within the Administrative Board. The draft agreement shall be presented to the Administrative Board for approval under Article 5(1)(d).

4.In deciding whether to authorise negotiations on accession with a public or private undertaking or body the Administrative Board shall, in particular, take account of the following criteria:

5.Membership of the Joint Undertaking may not be transferred to a third party without the prior and unanimous agreement of the Administrative Board.

Article 2U.K.Organs of the Joint Undertaking

The organs of the Joint Undertaking shall be the Administrative Board and the Executive Director.

Article 3U.K.Composition and chairmanship of the Administrative Board

1.The Administrative Board shall be composed of:

(a)a representative from each of the members of the Joint Undertaking;

(b)a representative of the military;

(c)a representative of civil users of airspace, designated by their representative organisation at European level;

(d)an air navigation service providers’ representative, designated by their representative organisation at European level;

(e)an equipment manufacturers’ representative, designated by their representative organisation at European level;

(f)an airports’ representative, designated by their representative organisation at European level;

(g)a representative from the bodies representing staff in the air traffic management sector, designated by their representative organisation at European level;

(h)a representative of the relevant scientific institutions or the relevant scientific community, designated by their representative organisation at European level.

2.The Administrative Board shall be chaired by the representative of the Community.

Article 4U.K.Voting in the Administrative Board

1.The representatives referred to in points (a) and (c) of Article 3(1) shall have the right to vote.

2.The members of the Joint Undertaking shall have a number of votes in proportion to their contribution to the funds of the Joint Undertaking. However, notwithstanding the first sentence of this paragraph, the Community and Eurocontrol shall each have not less than 25 % of the total number of votes and the airspace users’ representative referred to in point (c) of Article 3(1) shall have at least 10 % of the total number of votes.

3.Decisions of the Administrative Board shall be adopted by a simple majority of the votes cast unless otherwise provided for in these Statutes.

4.If the votes are evenly divided, the Community shall have the casting vote.

5.Any decision relating to the accession of new members (within the meaning of Article 1(2)), the appointment of the Executive Director, proposed amendments to these Statutes, proposals to the Commission on the duration of the Joint Undertaking, the dissolution of the Joint Undertaking or decisions taken under Article 23 shall require the positive vote of the Community’s representative on the Administrative Board.

6.Decisions relating to the adoption of the ATM Master Plan and its modifications shall require the positive votes of the founding members. Notwithstanding paragraph 1, such decisions shall not be taken where the representatives referred to in points (c), (d), (f), and (g) of Article 3(1) are unanimously opposed.

Article 5U.K.Responsibilities of the Administrative Board

1.In particular, the Administrative Board shall be responsible for:

(a)adopting the ATM Master Plan endorsed by the Council as referred to in Article 1(2) of this Regulation and approving any proposal to modify it;

(b)giving guidelines and taking the decisions necessary for the implementation of the development phase of the Sesar project and exercising overall control over its implementation;

(c)approving the Joint Undertaking’s work programme and annual work programmes referred to in Article 16(1) as well as the annual budget, including the staff establishment plan;

(d)authorising negotiations and deciding on the accession of new members and on the relating agreements as referred to in Article 1(3);

(e)supervising the execution of the agreements between members and the Joint Undertaking;

(f)appointing and dismissing the Executive Director and approving the organisation chart[F1 and monitoring the Executive Director’s performance;]

(g)deciding on the amounts and procedures for the payment of members’ financial contributions and the assessment of contributions in kind;

(h)adopting the [F2financial rules] of the Joint Undertaking;

(i)approving the annual accounts and balance-sheet;

(j)adopting the annual report on the progress of the development phase of the Sesar project and its financial situation referred to in Article 16(2);

(k)deciding on proposals to the Commission on the extension and the dissolution of the Joint Undertaking;

(l)establishing procedures for granting rights of access to tangible and intangible assets which are the property of the Joint Undertaking and the transfer of such assets;

[F3(m) laying down the rules and procedures for awarding the contracts or grants and any other agreement necessary to implement the ATM Master Plan, including specific procedures for avoidance of conflict of interest;

(n) deciding on proposals to the Commission to amend the statutes;]

(o)exercising such other powers and performing such other functions, including the establishment of subsidiary bodies, as may be necessary for the purposes of the development phase of the Sesar project;

(p)adopting the arrangements for implementing Article 8.

2.The Administrative Board shall adopt its rules of procedure which shall ensure that its proceedings run in a smooth and efficient manner, particularly in the event of a significant expansion in membership. These rules shall also include the following provisions:

[F3(a) the Administrative Board shall meet at least three times a year. Extraordinary meetings shall be convened either at the request of one-third of the members of the Administrative Board representing at least 30 % of the voting rights, at the request of the Commission or of the Executive Director;]

(b)the meetings shall normally take place at the seat of the Joint Undertaking;

(c)unless otherwise decided in particular cases, the Executive Director shall participate in the meetings;

(d)specific procedures for identifying and avoiding conflicts of interest.

Article 6U.K.Avoidance of conflicts of interest

[F31. Members of the Joint Undertaking or of the Administrative Board and Joint Undertaking staff are not allowed to participate in the preparation, evaluation or the award procedure of financial support from the Joint Undertaking, in particular following calls for tender or calls for proposals if they own, represent or have agreements with bodies which are potential candidates or applicants.]

2.Members of the Joint Undertaking and participants in the Administrative Board must disclose any direct or indirect personal or corporate interest in the outcome of the deliberations of the Administrative Board in relation to any matter on the agenda. This requirement also applies to the staff in relation to the tasks which are assigned to them.

3.Based on the disclosure mentioned in paragraph 2 the Administrative Board may decide to exclude members, participants or staff from decisions or tasks where a conflict of interest is likely to occur. They will not have access to information relating to the fields deemed subject to potential conflicts of interest.

Article 7U.K.Executive Director

1.The Executive Director shall be responsible for the day-to-day management of the Joint Undertaking and is its legal representative. [F1 The Executive Director shall exercise, in respect of the staff, the powers laid down in Article 2a(2) of Regulation (EC) No 219/2007.]

[F32. The Executive Director shall be engaged as a temporary agent of the Joint Undertaking under Article 2(a) of the Conditions of employment of other servants. The Executive Director shall be appointed by the Administrative Board, from a list of candidates proposed by the Commission, following an open and transparent selection procedure.

For the purpose of concluding the contract with the Executive Director, the Joint Undertaking shall be represented by the Chairperson of the Administrative Board.

The term of office of the Executive Director shall be five years. By the end of that period, the Commission shall undertake an assessment that takes into account an evaluation of the performance of the Executive Director and the Joint Undertaking's future tasks and challenges.

The Administrative Board, acting on a proposal from the Commission, which takes into account the assessment referred to in the third subparagraph of this paragraph, may extend the term of office of the Executive Director once for no more than five years.

An Executive Director whose term of office has been extended may not participate in another selection procedure for the same post at the end of the overall period.

The Executive Director may be removed from office only upon a decision of the Administrative Board acting on a proposal from the Commission.]

3.The Executive Director shall perform his duties with complete independence within the powers assigned to him.

4.The Executive Director shall direct the execution of the Sesar project within the guidelines established by the Administrative Board to which he shall be responsible. He shall provide the Administrative Board with all information necessary for the performance of its functions.

5.The Executive Director shall in particular:

[F2(a) employ, manage and supervise the staff of the Joint Undertaking, including the staff referred to in Article 8;]

(b)organise, manage and supervise the activities of the Joint Undertaking;

(c)submit to the Administrative Board his proposals concerning the organisation chart;

(d)draw up and regularly update the global and the annual work programme of the Joint Undertaking, including an estimate on programme costs, and submit them to the Administrative Board;

(e)draw up, in accordance with the [F2financial rules], the draft annual budget, including the staff establishment plan, and submit them to the Administrative Board;

(f)ensure that the obligations of the Joint Undertaking, with regard to the contracts and agreements it concludes are met;

(g)ensure that the activities of the Joint Undertaking are carried out with complete independence and without any conflicts of interest;

(h)draw up the annual report on the progress of the Sesar project and its financial situation, and such other reports as may be requested by the Administrative Board, and submit them to the latter;

(i)submit the annual accounts and balance-sheet to the Administrative Board;

(j)submit to the Administrative Board any proposal involving changes in the design of the Sesar project.

[F1Article 7a U.K. Internal Auditing function

The functions entrusted by Article 185(3) of the Financial Regulation to the Commission’s internal auditor shall be carried out under the responsibility of the Administrative Board, which shall make appropriate provision, taking into account the size and the scope of the Joint Undertaking.]

[F2Article 8 U.K. Secondment of staff to the Joint Undertaking

Any member of the Joint Undertaking may propose to the Executive Director the secondment of members of its staff to the Joint Undertaking in accordance with conditions provided for in the relevant agreement referred to in Article 1(3) of these Statutes. Staff seconded to the Joint Undertaking must act with complete independence under the supervision of the Executive Director.]

Article 9U.K.Agreements

[F31. In order to carry out the tasks defined in Article 1(5) of this Regulation, the Joint Undertaking may conclude specific agreements with and award grants to its members, in accordance with the applicable financial regulations.]

2.Eurocontrol’s role and contribution shall be defined in an agreement with the Joint Undertaking. This agreement shall:

(a)establish the detailed arrangements for the transfer and the use of the results of the definition phase to the Joint Undertaking;

(b)describe Eurocontrol’s tasks and responsibilities in the implementation of the ATM Master Plan under the authority of the Joint Undertaking, such as:

(i)

organising research, development and validation activities in accordance with the work programme of the Joint Undertaking;

(ii)

coordinating the common developments for the future system under the responsibility of Eurocontrol;

(iii)

proposing, after consultation with the stakeholders referred to in Article 1(5) of this Regulation, possible amendments to the ATM Master Plan;

(iv)

updating convergence indicators (European convergence and implementation plan, local convergence and implementation plan);

(v)

liaising with the International Civil Aviation Organisation.

3.All agreements with members shall include appropriate provisions which shall prevent any possible conflict of interest for members in performing the tasks under the said agreements.

4.Representatives of members of the Joint Undertaking shall not participate in deliberations of the Joint Undertaking pertaining to negotiations on the conclusion of their own agreements referred to in paragraph 1 and shall be denied access to the documentation on these deliberations.

[F3Article 10 U.K. Contracts and grants

1. Notwithstanding Article 9, the Joint Undertaking may conclude service and supply contracts or grant agreements with undertakings or a consortium of undertakings, in particular to carry out the tasks provided for in Article 1(5) of this Regulation.

2. The Joint Undertaking shall ensure that the contracts and grant agreementsreferred to in paragraph 1 provide for the right of the Commission to carry out controls in order to ensure that the financial interests of the Union are protected.

3. The contracts and grant agreements referred to in paragraph 1 shall include all appropriate provisions relating to the intellectual property rights referred to in Article 18. In order to avoid any conflict of interest, members involved in defining work that is subject to a procurement or grant procedure, including their staff seconded under Article 8, may not take part in carrying out that work.]

Article 11U.K.Working groups

1.In order to carry out the tasks provided for in Article 1(5) of this Regulation, the Joint Undertaking can set up a limited number of working groups to carry out activities which are not already being carried out elsewhere. These groups shall rely on the expertise of professionals and shall work in a transparent manner.

2.The experts who take part in the working groups shall not belong to the staff of the Joint Undertaking.

3.The working groups shall be chaired by a representative of the Joint Undertaking.

Article 12U.K.Financial provisions

1.The revenue of the Joint Undertaking shall come from the sources identified in Article 4 of this Regulation.

2.In order to start up the work of the Joint Undertaking, the founding members shall pay a minimum initial contribution of EUR 10 million within a period of one year from the establishment of the Joint Undertaking.

[F33. The members referred to in the second indent of Article 1(2) shall undertake to pay a minimum initial contribution of EUR 10 million within a period of one year from when their accession to the Joint Undertaking is accepted. This amount shall be reduced to EUR 5 million for members that subscribe to the Joint Undertaking within 24 months of its constitution or after a call for new membership.]

In the case of undertakings, subscribing individually or collectively, which may be regarded as small or medium-sized enterprises within the meaning of the Commission recommendation of 6 May 2003 concerning the definition of small and medium-sized enterprises(1), this amount shall be reduced to EUR 250 000 regardless of when they become members. New members may be offered the option of paying the initial contribution in several instalments, over a period to be agreed and established in their agreements as referred to in Article 1(3).

4.The Administrative Board shall decide on the amounts which must be released by each member in proportion to the contributions which it has agreed to pay and shall establish the deadline by which the members must pay their contributions.

5.Contributions in kind are possible except as regards the contributions referred to in paragraph 2. They shall be subject to an evaluation of their value and their utility for carrying out the tasks of the Joint Undertaking and shall be specified in the agreement referred to in Article 1(3).

6.Any member of the Joint Undertaking that fails to meet its commitments concerning the contributions in kind or does not release the amount due within the prescribed time-limit shall be, for six months following the expiry of this time-limit, disqualified from voting in the Administrative Board until such time as its obligations have been met. Upon expiry of this period of six months, if the obligations have still not been met, its membership shall be revoked.

Article 13U.K.Revenue

1.All the revenue of the Joint Undertaking shall be applied to promoting the tasks defined in Article 1(5) of this Regulation. Subject to Article 25, no payment by way of division of any excess revenue over expenditure shall be made to the members of the Joint Undertaking.

[F32. Any interest yielded by the contributions paid by the members of the Joint Undertaking shall be considered to be revenue of the Joint Undertaking.]

F4Article 14U.K. [F4Financial regulations]

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Article 15U.K.Implementation and control of the budget

1.The financial year shall correspond to the calendar year.

[F22. Each year the Executive Director shall transmit to the members the cost estimates of the SESAR project as approved by the Administrative Board. The Administrative Board shall, in the financial rules of the Joint Undertaking, provide for the procedure to be followed when transmitting the cost estimates.]

3.The members shall forthwith communicate to the Executive Director their comments on the project cost estimates, and in particular on the estimates of revenue and expenditure for the following year.

[F24. Based on the approved project cost estimates, and taking into account the comments received from members, the Executive Director shall prepare the draft budget for the following year and, submit it to the Administrative Board for adoption. The Administrative Board shall, in the financial rules of the Joint Undertaking, provide for the procedure to be followed when submitting the draft budget.]

5.Within two months of the end of each financial year, the Executive Director shall submit the annual accounts and balance-sheets for the preceding year to the Court of Auditors of the European Communities. The audit executed by the Court of Auditors shall be based on records and performed on the spot.

6.The Executive Director shall present the annual accounts and balance-sheet, together with the report of the Court of Auditors, to the Administrative Board for approval by a majority of 75 % of the votes cast. The Executive Director is entitled and, if requested by the Administrative Board, obliged to comment on the report.

7.The Court of Auditors shall send its report to the members of the Joint Undertaking.

Article 16U.K.Work programme and reports

[F31. The Joint Undertaking shall draw up its work programme on the basis of the financial framework referred to in Article 4(2) of this Regulation and on the basis of sound management and accountability principles setting out clear deliverables and milestones. It shall consist of:]

(a)a global work programme, divided into periods of thirty-six months;

(b)annual work programmes established each year which describe the activities, timetable and costs of the Joint Undertaking over this period.

2.The annual report shall show the progress of the Sesar project, in particular with regard to the timetable, costs and performance of this project.

[F3Article 17 U.K. Protection of the Union's financial interests

1. The Joint Undertaking shall take appropriate measures ensuring that, when actions financed under this Regulation are implemented, the financial interests of the Union are protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective checks and, if irregularities are detected, by the recovery of the amounts wrongly paid and, where appropriate, by effective, proportional and deterrent penalties.

2. The Commission or its representatives and the Court of Auditors shall have the power of audit, on the basis of documents as well as on-the-spot, over all grant beneficiaries, contractors and subcontractors who have received Union funds.

3. The European Anti-Fraud Office (OLAF) shall be authorised to carry out on-the-spot checks and inspections on economic operators concerned directly or indirectly by such funding in accordance with the procedures laid down in Council Regulation (Euratom, EC) No 2185/96 (2) with a view to establishing that there has been fraud, corruption or any other illegal activity affecting the financial interests of the Union in connection with a grant agreement or decision or a contract concerning Union funding.

4. Without prejudice to paragraphs 1, 2 and 3, cooperation agreements with international organisations, grant agreements, decisions and contracts resulting from the implementation of this Regulation shall expressly entitle the Commission, the Court of Auditors and OLAF to conduct such audits, on-the-spot checks and inspections.]

Article 18U.K.Property rights

The Joint Undertaking shall own all the tangible and intangible assets created by the Joint Undertaking or transferred to it for the development phase of the Sesar project in accordance with agreements referred to in Articles 1(3) and 9, concluded by the Joint Undertaking. The Joint Undertaking may grant access rights to the knowledge resulting from the project, in particular to its members as well as Member States of the European Union and/or Eurocontrol for their own and non commercial purposes.

[F2Article 19 U.K. Transparency

1. Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding access to European Parliament, Council and Commission documents (3) shall apply to documents held by the Joint Undertaking.

2. The Joint Undertaking shall adopt practical arrangements for implementing Regulation (EC) No 1049/2001 by 1 July 2009 .

3. Decisions taken by the Joint Undertaking pursuant to Article 8 of Regulation (EC) No 1049/2001 may form the subject of a complaint to the Ombudsman or of an action before the Court of Justice, under the conditions laid down in Articles 195 and 230 of the Treaty respectively.]

Article 20U.K.Anti-fraud measures

1.For the purposes of combating fraud, corruption and other illegal acts, Regulation (EC) No 1073/1999 of the European Parliament and of the Council of 25 May 1999 concerning investigations conducted by the European Anti-Fraud Office (OLAF)(4) shall apply.

2.The Joint Undertaking shall accede to the Interinstitutional Agreement of 25 May 1999 between the European Parliament, the Council of the European Union and the Commission of the European Communities concerning internal investigations by the European Anti Fraud Office (OLAF)(5) and shall forthwith issue the appropriate provisions applicable to all employees of the Joint Undertaking.

3.The Court of Auditors and OLAF may, if necessary, carry out on-the-spot checks among the recipients of the Joint Undertaking’s funding and the agents responsible for allocating it.

[F2Article 21 U.K. Insurance

The Executive Director shall propose to the Administrative Board to take out any necessary insurance and the Joint Undertaking shall take out such insurance as the Administrative Board may request.]

Article 22U.K.Confidentiality

The Joint Undertaking shall ensure the protection of sensitive information, the non-authorised disclosure of which could damage the interests of the contracting parties. It shall apply the principles and minimum standards of security defined and implemented by Council Decision 2001/264/EC of 19 March 2001 adopting the Council’s security regulations(6).

Article 23U.K.Transfer of tangible and intangible assets by the Joint Undertaking

Upon expiry of the period referred to in Article 1 of this Regulation, the transfer by the Joint Undertaking of all or part of the tangible and intangible assets that it owns to another body shall be agreed by the Administrative Board.

F5Article 24U.K. [F5Amending the Statutes]

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Article 25U.K.Dissolution of the Joint Undertaking

For the purpose of conducting the proceedings involved in winding up the Joint Undertaking, the Administrative Board shall appoint one or more liquidators, who shall comply with the decisions of the Administrative Board.

Article 26U.K.Applicable law

The law of the State where the seat of the Joint Undertaking is located shall apply in any matter not covered by these Statutes.