xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"
the correct operation on an SI code, including II/SI code operation,
that the combination of IC conflict monitoring systems and fallback mode of operation properly mitigate the IC conflict hazards,
that the fallback mode of operation does not conflict with the IC Allocation plan.
description of the implementation,
the report of inspections and tests achieved before putting the system into service.
determine the appropriate operational and technical assessment environment reflecting the operational environment,
verify that the test plan describes the integration of systems identified in Article 1(2) in an operational and technical assessment environment,
verify that the test plan provides full coverage of the applicable interoperability, performance, contingency and safety requirements of this Regulation,
ensure the consistency and quality of the technical documentation and the test plan,
plan the test organisation, staff, installation and configuration of the test platform,
perform the inspections and tests as specified in the test plan,
write the report presenting the results of inspections and tests.