Project | Location of projects supported | Envisaged Community contribution(EUR million) |
---|---|---|
Southern Gas Corridor | ||
NABUCCO | Austria, Hungary, Bulgaria, Germany, Romania | 200 |
ITGI – Poseidon | Italy, Greece | 100 |
Baltic interconnection | ||
Skanled/Baltic pipe | Poland, Denmark, Sweden | 150 |
LNG network | ||
Liquefied Natural Gas terminal at Polish coast at port of Świnoujście | Poland | 80 |
Central and South East Europe | ||
Slovakia-Hungary Interconnector (Veľký Krtíš - Vecsés) | Slovakia, Hungary | 30 |
Gas transmission system in Slovenia between the Austrian Border to Ljubljana (excluding the section Rogatec-Kidričevo) | Slovenia | 40 |
Interconnection Bulgaria-Greece (Stara Zagora — Dimitrovgrad-Komotini) | Bulgaria, Greece | 45 |
Romania-Hungary gas interconnector | Romania, Hungary | 30 |
Expansion of Gas Storage Capacity in the Czech hub | Czech Republic | 35 |
Infrastructure and equipment to permit reverse gas flow in the event of short term supply disruption | Austria, Bulgaria, Czech Republic, Estonia, Greece, Hungary, Latvia, Lithuania, Poland, Portugal, Romania, Slovakia | 80 |
Slovakia-Poland interconnection | Slovakia, Poland | 20 |
Hungary-Croatia interconnection | Hungary | 20 |
Bulgaria-Romania interconnection | Bulgaria, Romania | 10 |
Mediterranean | ||
Reinforcement of FR gas network on the Africa-Spain-France axis | France | 200 |
GALSI (Gazoduc Algérie-Italie) | Italy | 120 |
Gas Interconnection Western Axis Larrau Branch | Spain | 45 |
North Sea area | ||
Germany-Belgium-United Kingdom pipeline | Belgium | 35 |
France-Belgium connection | France, Belgium | 200 |
TOTAL | 1 440 |
Project | Location of projects supported | Envisaged Community contribution(EUR million) |
---|---|---|
Baltic interconnection | ||
Estlink-2 | Estonia, Finland | 100 |
Interconnection Sweden-Baltic States, and strengthening of the grid in Baltic States | Sweden, Latvia, Lithuania | 175 |
Central and South East Europe | ||
Halle/Saale – Schweinfurt | Germany | 100 |
Wien-Győr | Austria, Hungary | 20 |
Mediterranean | ||
Portugal-Spain interconnection reinforcement | Portugal | 50 |
Interconnection France-Spain (Baixas - Sta Llogaia) | France, Spain | 225 |
New 380 kV AC submarine cable between Sicily – Continental Italy (Sorgente – Rizziconi) | Italy | 110 |
North Sea area | ||
500 MW Ireland/Wales interconnector (Meath-Deeside) | Ireland, United Kingdom | 110 |
Electricity interconnection Malta-Italy | Malta/Italy | 20 |
TOTAL | 910 |
Small isolated island initiatives | Cyprus | 10 |
Malta | 5 | |
TOTAL | 15 |
Project Name/Location | Envisaged Community contribution(EUR million) | Fuel | Capacity | Capture Technique | Storage Concept | |
---|---|---|---|---|---|---|
Huerth | Germany | 180 | Coal | 450 MW | IGCC | Saline Aquifer |
Jaenschwalde | Coal | 500 MW | Oxyfuel | Oil/Gas fields | ||
Eemshaven | Netherlands | 180 | Coal | 1 200 MW | IGCC | Oil/Gas fields |
Rotterdam | Coal | 1 080 MW | PC | Oil/Gas fields | ||
Rotterdam | Coal | 800 MW | PC | Oil/Gas fields | ||
Bełchatów | Poland | 180 | Coal | 858 MW | PC | Saline Aquifer |
Compostilla (León) | Spain | 180 | Coal | 500 MW | Oxyfuel | Saline Aquifer |
Kingsnorth | United Kingdom | 180 | Coal | 800 MW | PC | Oil/Gas fields |
Longannet | Coal | 3 390 MW | PC | Saline Aquifer | ||
Tilbury | Coal | 1 600 MW | PC | Oil/Gas fields | ||
Hatfield (Yorkshire) | Coal | 900 MW | IGCC | Oil/Gas fields | ||
Porto Tolle | Italy | 100 | Coal | 660 MW | PC | |
Industrial carbon capture project | ||||||
Florange | France | 50 | Transport of CO2 from industrial installation (steel plant) to underground storage (saline aquifer) | |||
TOTAL | 1 050 |