xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"
description of the implementation;
the report of inspections and tests achieved before putting the system into service.
determine the appropriate operational and technical assessment environment reflecting the operational environment;
verify that the test plan describes the integration of systems identified in points (b), (c) and (d) of Article 2(1) in an operational and technical assessment environment;
verify that the test plan provides full coverage of the applicable interoperability, performance and safety requirements of this Regulation;
ensure the consistency and quality of the technical documentation and the test plan;
plan the test organisation, staff, installation and configuration of the test platform;
perform the inspections and tests as specified in the test plan;
write the report presenting the results of inspections and tests.
Textual Amendments
F1Word in Annex 9 Pt. A point 7 omitted (31.12.2020) by virtue of The Air Traffic Management (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/459), regs. 1(2), 293(2)(a); 2020 c. 1, Sch. 5 para. 1(1)
F2Word in Annex 9 Pt. A point 7 substituted (31.12.2020) by The Air Traffic Management (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/459), regs. 1(2), 293(2)(b); 2020 c. 1, Sch. 5 para. 1(1)