maximum particle size before entering the unit: 12 mm;
minimum temperature in all material in the unit: 70 °C; and
minimum time in the unit without interruption: 60 minutes.
However, Category 3 milk, milk-based products, milk-derived products, colostrum and colostrum products may be used without pasteurisation/hygienisation as raw material in a biogas plant, if the competent authority does not consider them to present a risk of spreading any serious transmissible disease to humans or animals.
The minimum requirements set out in points (b) and (c) of this point shall also apply to Category 2 material which is introduced into a biogas plant without prior processing in accordance with Article 13(e)(ii) of Regulation (EC) No 1069/2009.
maximum particle size before entering the composting reactor: 12 mm;
minimum temperature in all material in the reactor: 70 °C; and
minimum time without interruption: 60 minutes.
The minimum requirements set out in points (b) and (c) of this point shall also apply to Category 2 material which is composted without prior processing in accordance with Article 13(e)(ii) of Regulation (EC) No 1069/2009.