xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

ANNEX IIU.K. PROCEDURE FOR ADOPTING A EUROPEAN ASSESSMENT DOCUMENT

2.ContractU.K.

For construction products referred to in Article 21(1)(c), within 1 month from the reception of the technical file, a contract shall be concluded between the manufacturer and the responsible TAB for the production of the European Technical Assessment, defining the work programme for drawing up the European Assessment Document, including: