Search Legislation

Regulation (EU) No 305/2011 of the European Parliament and of the CouncilShow full title

Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC (Text with EEA relevance)

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes over time for: ANNEX V

 Help about opening options

Version Superseded: 31/12/2020

Status:

Point in time view as at 16/06/2014.

Changes to legislation:

There are currently no known outstanding effects for the Regulation (EU) No 305/2011 of the European Parliament and of the Council, ANNEX V . Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F1ANNEX V U.K. ASSESSMENT AND VERIFICATION OF CONSTANCY OF PERFORMANCE

1. SYSTEMS OF ASSESSMENT AND VERIFICATION OF CONSTANCY OF PERFORMANCE U.K.

The manufacturer shall draw up the declaration of performance and determine the product-type on the basis of the assessments and verifications of constancy of performance carried out under the following systems:

1.1. System 1+ U.K.

(a)

The manufacturer shall carry out:

(i)

factory production control;

(ii)

further testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.

(b)

The notified product certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body:

(i)

an assessment of the performance of the construction product carried out on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of the product;

(ii)

initial inspection of the manufacturing plant and of factory production control;

(iii)

continuing surveillance, assessment and evaluation of factory production control;

(iv)

audit — testing of samples taken by the notified product certification body at the manufacturing plant or at the manufacturer's storage facilities.

1.2. System 1 U.K.

(a)

The manufacturer shall carry out:

(i)

factory production control;

(ii)

further testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.

(b)

The notified product certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body:

(i)

an assessment of the performance of the construction product carried out on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of the product;

(ii)

initial inspection of the manufacturing plant and of factory production control;

(iii)

continuing surveillance, assessment and evaluation of factory production control.

1.3. System 2+ U.K.

(a)

The manufacturer shall carry out:

(i)

an assessment of the performance of the construction product on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of that product;

(ii)

factory production control;

(iii)

testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.

(b)

The notified factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of conformity of the factory production control on the basis of the outcome of the following assessments and verifications carried out by that body:

(i)

initial inspection of the manufacturing plant and of factory production control;

(ii)

continuing surveillance, assessment and evaluation of factory production control.

1.4. System 3 U.K.

(a)

The manufacturer shall carry out factory production control.

(b)

The notified laboratory shall assess the performance on the basis of testing (based on sampling carried out by the manufacturer), calculation, tabulated values or descriptive documentation of the construction product.

1.5. System 4 U.K.

(a)

The manufacturer shall carry out:

(i)

an assessment of the performance of the construction product on the basis of testing, calculation, tabulated values or descriptive documentation of that product;

(ii)

factory production control.

(b)

No tasks require the intervention of notified bodies.

1.6. Construction products for which a European Technical Assessment has been issued U.K.

Notified bodies undertaking tasks under Systems 1+, 1 and 3 as well as manufacturers undertaking tasks under Systems 2+ and 4 shall consider the European Technical Assessment issued for the construction product in question as the assessment of the performance of that product. Notified bodies and manufacturers shall therefore not undertake the tasks referred to in points 1.1.(b)(i), 1.2.(b)(i), 1.3.(a)(i), 1.4.(b) and 1.5.(a)(i) respectively.

2. BODIES INVOLVED IN THE ASSESSMENT AND VERIFICATION OF CONSTANCY OF PERFORMANCE U.K.

With respect to the function of notified bodies involved in the assessment and verification of constancy of performance for construction products, distinction shall be made between:

(1)

product certification body: a body notified, in accordance with Chapter VII, to carry out constancy of performance certification;

(2)

factory production control certification body: a body notified, in accordance with Chapter VII, to carry out factory production control certification;

(3)

laboratory: a body notified, in accordance with Chapter VII, to measure, examine, test, calculate or otherwise assess the performance of construction products.

3. HORIZONTAL NOTIFICATIONS: CASES OF ESSENTIAL CHARACTERISTICS WHERE REFERENCE TO A RELEVANT HARMONISED TECHNICAL SPECIFICATION IS NOT REQUIRED U.K.

1.

Reaction to fire

2.

Resistance to fire

3.

External fire performance

4.

Acoustic performance

5.

Emissions of dangerous substances.]

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources