Search Legislation

Regulation (EU) No 305/2011 of the European Parliament and of the CouncilShow full title

Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC (Text with EEA relevance)

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Changes over time for: Division 1.

 Help about opening options

Changes to legislation:

There are outstanding changes by UK legislation not yet made to Regulation (EU) No 305/2011 of the European Parliament and of the Council. Any changes that have already been made to the legislation appear in the content and are referenced with annotations. Help about Changes to Legislation

[F11. SYSTEMS OF ASSESSMENT AND VERIFICATION OF CONSTANCY OF PERFORMANCE U.K.

The manufacturer shall draw up the declaration of performance and determine the product-type on the basis of the assessments and verifications of constancy of performance carried out under the following systems:

1.1. System 1+ U.K.

(a)

The manufacturer shall carry out:

(i)

factory production control;

(ii)

further testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.

(b)

The [F2approved] product certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body:

(i)

an assessment of the performance of the construction product carried out on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of the product;

(ii)

initial inspection of the manufacturing plant and of factory production control;

(iii)

continuing surveillance, assessment and evaluation of factory production control;

(iv)

audit — testing of samples taken by the [F2approved] product certification body at the manufacturing plant or at the manufacturer's storage facilities.

1.2. System 1 U.K.

(a)

The manufacturer shall carry out:

(i)

factory production control;

(ii)

further testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.

(b)

The [F2approved] product certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body:

(i)

an assessment of the performance of the construction product carried out on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of the product;

(ii)

initial inspection of the manufacturing plant and of factory production control;

(iii)

continuing surveillance, assessment and evaluation of factory production control.

1.3. System 2+ U.K.

(a)

The manufacturer shall carry out:

(i)

an assessment of the performance of the construction product on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of that product;

(ii)

factory production control;

(iii)

testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.

(b)

The [F2approved] factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of conformity of the factory production control on the basis of the outcome of the following assessments and verifications carried out by that body:

(i)

initial inspection of the manufacturing plant and of factory production control;

(ii)

continuing surveillance, assessment and evaluation of factory production control.

1.4. System 3 U.K.

(a)

The manufacturer shall carry out factory production control.

(b)

The [F2approved] laboratory shall assess the performance on the basis of testing (based on sampling carried out by the manufacturer), calculation, tabulated values or descriptive documentation of the construction product.

1.5. System 4 U.K.

(a)

The manufacturer shall carry out:

(i)

an assessment of the performance of the construction product on the basis of testing, calculation, tabulated values or descriptive documentation of that product;

(ii)

factory production control.

(b)

No tasks require the intervention of [F2approved] bodies.

1.6. Construction products for which a [F3UK] Technical Assessment has been issued U.K.

[F4Approved] bodies undertaking tasks under Systems 1+, 1 and 3 as well as manufacturers undertaking tasks under Systems 2+ and 4 shall consider the [F3UK] Technical Assessment issued for the construction product in question as the assessment of the performance of that product. [F4Approved] bodies and manufacturers shall therefore not undertake the tasks referred to in points 1.1.(b)(i), 1.2.(b)(i), 1.3.(a)(i), 1.4.(b) and 1.5.(a)(i) respectively.]

Back to top

Options/Help