- Latest available (Revised)
- Original (As adopted by EU)
Regulation (EU) No 1305/2013 of the European Parliament and of the Council of 17 December 2013 on support for rural development by the European Agricultural Fund for Rural Development (EAFRD) and repealing Council Regulation (EC) No 1698/2005
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
Regulation (EU) No 1305/2013 of the European Parliament and of the Council, CHAPTER I is up to date with all changes known to be in force on or before 05 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Support for rural development shall be provided in accordance with rural development programmes. These programmes shall implement a strategy to meet the priorities for rural development through a set of measures as defined in Title III. Support for rural development must be provided to further the objectives and the priorities of rural development.]
Extent Information
E1This version of this provision applies to England, Scotland and Northern Ireland only; a separate version has been created for Wales only
Textual Amendments
F1Art. 6 substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(1); 2020 c. 1, Sch. 5 para. 1(1)
Support for rural development must be provided in accordance with the rural development programme. This programme shall implement a strategy to meet the priorities for rural development through a set of measures as defined in Title III. Support for rural development must be provided to further the objectives and the priorities of rural development.]
Extent Information
E3This version of this provision applies to Wales only; a separate version has been created for England, Scotland and Northern Ireland only
Textual Amendments
F21Art. 6 substituted (W.) (26.3.2021 in so far as it relates to domestic support for rural development) by The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 7(7)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F2Art. 7 omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(2); 2020 c. 1, Sch. 5 para. 1(1)
1.In addition to the elements referred to in Article 27 of Regulation (EU) No 1303/2013, each rural development programme shall include:
F4(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)a SWOT analysis of the situation and an identification of the needs that have to be addressed in the geographical area covered by the programme.
The analysis shall be structured around the F5... priorities for rural development. Specific needs concerning the environment, climate change mitigation and adaptation and innovation shall be assessed across F5... priorities for rural development, in order to identify relevant responses in these three areas at the level of each priority;
(c)a description of the strategy which demonstrates that:
appropriate targets are set for each of the focus areas of the F5... priorities for rural development included in the programme, based on the common indicators referred to in Article 69 and, where necessary, on programme specific indicators;
relevant combinations of measures are selected in relation to each of the focus areas of the F5... priorities for rural development included in the programme, based on a sound intervention logic F6... the analysis referred to in point (b);
the allocation of financial resources to the measures of the programme is justified and adequate to achieve the targets set;
specific needs linked with specific conditions at regional or sub-regional level are taken into account and concretely addressed through adequately designed combinations of measures F7...;
an appropriate approach towards innovation with a view to achieving the F5... priorities for rural development, including the EIP for agricultural productivity and sustainability, towards the environment, including the specific needs of Natura 2000 areas, and towards climate change mitigation and adaptation is integrated into the programme;
measures have been taken to ensure the availability of sufficient advisory capacity on the regulatory requirements and on actions related to innovation;
(d)for each ex ante conditionality, established in accordance with Article 19, and part II of Annex XI to Regulation (EU) No 1303/2013 for the general ex ante conditionalities, and in accordance with Annex V to this Regulation, an assessment of which of the ex ante conditionalities are applicable to the programme and which of them are fulfilled at the date of submission of F8... the programme. Where the applicable ex ante conditionalities are not fulfilled, the programme shall contain a description of the actions to be taken, the bodies responsible and a timetable for such actions F9....
F10(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(f)a description of each of the measures selected;
(g)the evaluation plan referred to in Article 56 of Regulation (EU) No 1303/2013. The [F11relevant authority] shall provide sufficient resources to address the needs which have been identified and to ensure proper monitoring and evaluation;
(h)a financing plan comprising:
[F12a table setting out, in accordance with Article 58(4) and Article 58a(2) of this Regulation, the total [F13core] contribution planned for each year. That table shall indicate separately the additional resources as referred to in Article 58a(2) of this Regulation. When applicable, that table shall also indicate separately, within the total [F13core] contribution, the appropriations provided for the less developed regions and the funds transferred to the [F13support for rural development] pursuant to Article 7(2) of Regulation (EU) No 1307/2013. F14...;]
[F12a table setting out, for each measure, for each type of operation with a specific [F13core] contribution rate, for the type of operation referred to in Article 37(1) and Article 39a F15... and for technical assistance, the total F5... contribution planned and the applicable [F13core] contribution rate. Where applicable, that table shall indicate separately the [F13core] contribution rate for less developed regions and for other regions;]
(i)an indicator plan, broken down into focus areas, comprising the targets referred to in point (i) of Article 8(1)(c) and the planned outputs and planned expenditure of each rural development measure selected in relation to a corresponding focus area;
(j)where applicable, a table on additional national financing per measure in accordance with Article 82;
(k)where applicable, the list of aid schemes falling under Article 81(1) to be used for the implementation of the programmes;
[F16(l)information on the complementarity with other support provided to the agricultural and fisheries sectors;]
(m)programme implementing arrangements including:
the designation F17... of all authorities referred to in Article 65(2) and, for information, a summary description of the management and control structure;
a description of the monitoring and evaluation procedures, as well as the composition of the Monitoring Committee;
the provisions to ensure that the programme is publicised, including through the national rural network referred to in Article 54;
a description of the approach laying down principles with regard to the establishment of selection criteria for operations and local development strategies that takes into account relevant targets; in this context [F18the relevant authority] may provide for priority to be given to SMEs linked to the agriculture and forestry sector.
in relation to local development, where applicable, a description of the mechanisms to ensure coherence between activities envisaged under the local development strategies, the "Cooperation" measure referred to in Article 35, and the "Basic services and village renewal in rural areas" measure referred to in Article 20 including urban-rural links;
(n)the actions taken to involve the partners referred to in Article 5 of Regulation (EU) No 1303/2013 and a summary of the results of the consultation of the partners;
(o)where applicable, the structure of the national rural network as referred to in Article 54(3), and provisions for its management, which would constitute the basis for its annual actions plans.
F192.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F203.The appropriate authority may make regulations laying down rules for the presentation of the elements described in paragraph 1 in rural development programmes.]]
Extent Information
E2This version of this provision applies to Wales and Northern Ireland only; separate versions have been created for England and Scotland
Textual Amendments
F3Arts. 8-12 omitted (W.) (26.3.2021 in so far as it relates to domestic support for rural development) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 7(8)
F4Art. 8(1)(a) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
F5Word in Art. 8(1) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)
F6Words in Art. 8(1)(c)(ii) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iii)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F7Words in Art. 8(1)(c)(iv) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iii)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F8Words in Art. 8(1)(d) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iv)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F9Words in Art. 8(1)(d) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iv)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F10Art. 8(1)(e) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(v); 2020 c. 1, Sch. 5 para. 1(1)
F11Words in Art. 8(1)(g) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vi); 2020 c. 1, Sch. 5 para. 1(1)
F12Substituted by Regulation (EU) 2020/2220 of the European Parliament and of the Council of 23 December 2020 laying down certain transitional provisions for support from the European Agricultural Fund for Rural Development (EAFRD) and from the European Agricultural Guarantee Fund (EAGF) in the years 2021 and 2022 and amending Regulations (EU) No 1305/2013, (EU) No 1306/2013 and (EU) No 1307/2013 as regards resources and application in the years 2021 and 2022 and Regulation (EU) No 1308/2013 as regards resources and the distribution of such support in respect of the years 2021 and 2022
F13Words in Art. 8(1)(h) substituted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vii)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F14Words in Art. 8(1)(h)(i) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vii)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F15Words in Art. 8(1)(h)(ii) omitted (E.N.I.) (22.7.2022) by virtue of The Common Agricultural Policy (Cross-Compliance Exemptions and Transitional Regulation) (Amendment) (EU Exit) Regulations 2022 (S.I. 2022/861), regs. 1(2), 3(2)
F16Art. 8(1)(l) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(viii); 2020 c. 1, Sch. 5 para. 1(1)
F17Words in Art. 8(1)(m)(i) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ix)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F18Words in Art. 8(1)(m)(iv) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ix)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F19Art. 8(2) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(b); 2020 c. 1, Sch. 5 para. 1(1)
F20Art. 8(3) substituted (31.12.2020) by The Agriculture (Legislative Functions) (EU Exit) Regulations 2019 (S.I. 2019/748), regs. 1, 51; 2020 c. 1, Sch. 5 para. 1(1)
1.In addition to the elements referred to in Article 27 of Regulation (EU) No 1303/2013, each rural development programme shall include:
F22(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)a SWOT analysis of the situation and an identification of the needs that have to be addressed in the geographical area covered by the programme.
The analysis shall be structured around the F23... priorities for rural development. Specific needs concerning the environment, climate change mitigation and adaptation and innovation shall be assessed across F23... priorities for rural development, in order to identify relevant responses in these three areas at the level of each priority;
(c)a description of the strategy which demonstrates that:
appropriate targets are set for each of the focus areas of the F23... priorities for rural development included in the programme, based on the common indicators referred to in Article 69 and, where necessary, on programme specific indicators;
relevant combinations of measures are selected in relation to each of the focus areas of the F23... priorities for rural development included in the programme, based on a sound intervention logic F24... the analysis referred to in point (b);
the allocation of financial resources to the measures of the programme is justified and adequate to achieve the targets set;
specific needs linked with specific conditions at regional or sub-regional level are taken into account and concretely addressed through adequately designed combinations of measures F25...;
an appropriate approach towards innovation with a view to achieving the F23... priorities for rural development, including the EIP for agricultural productivity and sustainability, towards the environment, including the specific needs of Natura 2000 areas, and towards climate change mitigation and adaptation is integrated into the programme;
measures have been taken to ensure the availability of sufficient advisory capacity on the regulatory requirements and on actions related to innovation;
(d)for each ex ante conditionality, established in accordance with Article 19, and part II of Annex XI to Regulation (EU) No 1303/2013 for the general ex ante conditionalities, and in accordance with Annex V to this Regulation, an assessment of which of the ex ante conditionalities are applicable to the programme and which of them are fulfilled at the date of submission of F26... the programme. Where the applicable ex ante conditionalities are not fulfilled, the programme shall contain a description of the actions to be taken, the bodies responsible and a timetable for such actions F27....
F28(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(f)a description of each of the measures selected;
(g)the evaluation plan referred to in Article 56 of Regulation (EU) No 1303/2013. The [F29relevant authority] shall provide sufficient resources to address the needs which have been identified and to ensure proper monitoring and evaluation;
(h)a financing plan comprising:
[F30a table setting out the total core contribution, as determined by the Scottish Ministers in accordance with Article 58. When applicable this table shall indicate separately within the total core contribution the funds transferred to the support for rural development in application of Article 11(4A) of Regulation (EU) No 1307/2013;]
[F12a table setting out, for each measure, for each type of operation with a specific [F31core] contribution rate, for the type of operation referred to in Article 37(1) and Article 39a, F32... and for technical assistance, the total F23... contribution planned and the applicable [F31core] contribution rate. Where applicable, that table shall indicate separately the [F31core] contribution rate for less developed regions and for other regions;]
(i)an indicator plan, broken down into focus areas, comprising the targets referred to in point (i) of Article 8(1)(c) and the planned outputs and planned expenditure of each rural development measure selected in relation to a corresponding focus area;
(j)where applicable, a table on additional F33... financing per measure in accordance with Article 82;
(k)where applicable, the list of aid schemes falling under Article 81(1) to be used for the implementation of the programmes;
[F34(l)information on the complementarity with other support provided to the agricultural and fisheries sectors;]
(m)programme implementing arrangements including:
the designation F35... of all authorities referred to in Article 65(2) and, for information, a summary description of the management and control structure;
a description of the monitoring and evaluation procedures, as well as the composition of the Monitoring Committee;
the provisions to ensure that the programme is publicised, including through the national rural network referred to in Article 54;
a description of the approach laying down principles with regard to the establishment of selection criteria for operations and local development strategies that takes into account relevant targets; in this context [F36the relevant authority] may provide for priority to be given to SMEs linked to the agriculture and forestry sector.
in relation to local development, where applicable, a description of the mechanisms to ensure coherence between activities envisaged under the local development strategies, the "Cooperation" measure referred to in Article 35, and the "Basic services and village renewal in rural areas" measure referred to in Article 20 including urban-rural links;
(n)the actions taken to involve the partners referred to in Article 5 of Regulation (EU) No 1303/2013 and a summary of the results of the consultation of the partners;
(o)where applicable, the structure of the national rural network as referred to in Article 54(3), and provisions for its management, which would constitute the basis for its annual actions plans.
F372.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F383.The appropriate authority may make regulations laying down rules for the presentation of the elements described in paragraph 1 in rural development programmes.]
Extent Information
E4This version of this provision extends to Scotland only; separate versions have been created for Wales and Northern Ireland and England
Textual Amendments
F12Substituted by Regulation (EU) 2020/2220 of the European Parliament and of the Council of 23 December 2020 laying down certain transitional provisions for support from the European Agricultural Fund for Rural Development (EAFRD) and from the European Agricultural Guarantee Fund (EAGF) in the years 2021 and 2022 and amending Regulations (EU) No 1305/2013, (EU) No 1306/2013 and (EU) No 1307/2013 as regards resources and application in the years 2021 and 2022 and Regulation (EU) No 1308/2013 as regards resources and the distribution of such support in respect of the years 2021 and 2022
F22Art. 8(1)(a) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
F23Word in Art. 8(1) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)
F24Words in Art. 8(1)(c)(ii) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iii)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F25Words in Art. 8(1)(c)(iv) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iii)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F26Words in Art. 8(1)(d) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iv)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F27Words in Art. 8(1)(d) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iv)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F28Art. 8(1)(e) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(v); 2020 c. 1, Sch. 5 para. 1(1)
F29Words in Art. 8(1)(g) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vi); 2020 c. 1, Sch. 5 para. 1(1)
F30Art. 8(1)(h)(i) substituted (S.) (1.1.2021) by The Rural Development (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/477), regs. 1(2), 4(4)(a)
F31Words in Art. 8(1)(h) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vii)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F32Words in Art. 8(1)(h)(ii) omitted (S.) (15.3.2021) by virtue of The Rural Development (Miscellaneous Amendment) (Scotland) Regulations 2021 (S.S.I. 2021/33), regs. 1, 2(2)
F33Word in Art. 8(1)(j) omitted (S.) (1.1.2021) by virtue of The Rural Development (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/477), regs. 1(2), 4(4)(b)
F34Art. 8(1)(l) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(viii); 2020 c. 1, Sch. 5 para. 1(1)
F35Words in Art. 8(1)(m)(i) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ix)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F36Words in Art. 8(1)(m)(iv) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ix)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F37Art. 8(2) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(b); 2020 c. 1, Sch. 5 para. 1(1)
F38Art. 8(3) substituted (31.12.2020) by The Agriculture (Legislative Functions) (EU Exit) Regulations 2019 (S.I. 2019/748), regs. 1, 51; 2020 c. 1, Sch. 5 para. 1(1)
1.In addition to the elements referred to in Article 27 of Regulation (EU) No 1303/2013, each rural development programme shall include:
F39(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)a SWOT analysis of the situation and an identification of the needs that have to be addressed in the geographical area covered by the programme.
The analysis shall be structured around the F40... priorities for rural development. Specific needs concerning the environment, climate change mitigation and adaptation and innovation shall be assessed across F40... priorities for rural development, in order to identify relevant responses in these three areas at the level of each priority;
(c)a description of the strategy which demonstrates that:
appropriate targets are set for each of the focus areas of the F40... priorities for rural development included in the programme, based on the common indicators referred to in Article 69 and, where necessary, on programme specific indicators;
relevant combinations of measures are selected in relation to each of the focus areas of the F40... priorities for rural development included in the programme, based on a sound intervention logic F41... the analysis referred to in point (b);
the allocation of financial resources to the measures of the programme is justified and adequate to achieve the targets set;
specific needs linked with specific conditions at regional or sub-regional level are taken into account and concretely addressed through adequately designed combinations of measures F42...;
an appropriate approach towards innovation with a view to achieving the F40... priorities for rural development, including the EIP for agricultural productivity and sustainability, towards the environment, including the specific needs of Natura 2000 areas, and towards climate change mitigation and adaptation is integrated into the programme;
measures have been taken to ensure the availability of sufficient advisory capacity on the regulatory requirements and on actions related to innovation;
(d)for each ex ante conditionality, established in accordance with Article 19, and part II of Annex XI to Regulation (EU) No 1303/2013 for the general ex ante conditionalities, and in accordance with Annex V to this Regulation, an assessment of which of the ex ante conditionalities are applicable to the programme and which of them are fulfilled at the date of submission of F43... the programme. Where the applicable ex ante conditionalities are not fulfilled, the programme shall contain a description of the actions to be taken, the bodies responsible and a timetable for such actions F44....
F45(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(f)a description of each of the measures selected;
(g)the evaluation plan referred to in Article 56 of Regulation (EU) No 1303/2013. The [F46relevant authority] shall provide sufficient resources to address the needs which have been identified and to ensure proper monitoring and evaluation;
(h)a financing plan comprising:
[F47a table setting out, in accordance with Article 58(4) and Article 58a(2) of this Regulation, the total [F48core] contribution planned for each year. That table shall indicate separately the additional resources as referred to in Article 58a(2) of this Regulation. When applicable, that table shall also indicate separately, within the total [F48core] contribution, [F49the appropriations provided to the less developed regions];]
[F47a table setting out, for each measure, for each type of operation with a specific [F48core] contribution rate, for the type of operation referred to in Article 37(1) and Article 39a F50... and for technical assistance, the total F40... contribution planned and the applicable [F48core] contribution rate. Where applicable, that table shall indicate separately the [F48core] contribution rate for less developed regions and for other regions;]
(i)an indicator plan, broken down into focus areas, comprising the targets referred to in point (i) of Article 8(1)(c) and the planned outputs and planned expenditure of each rural development measure selected in relation to a corresponding focus area;
(j)where applicable, a table on additional national financing per measure in accordance with Article 82;
(k)where applicable, the list of aid schemes falling under Article 81(1) to be used for the implementation of the programmes;
[F51(l)information on the complementarity with other support provided to the agricultural and fisheries sectors;]
(m)programme implementing arrangements including:
the designation F52... of all authorities referred to in Article 65(2) and, for information, a summary description of the management and control structure;
a description of the monitoring and evaluation procedures, as well as the composition of the Monitoring Committee;
the provisions to ensure that the programme is publicised, including through the national rural network referred to in Article 54;
a description of the approach laying down principles with regard to the establishment of selection criteria for operations and local development strategies that takes into account relevant targets; in this context [F53the relevant authority] may provide for priority to be given to SMEs linked to the agriculture and forestry sector.
in relation to local development, where applicable, a description of the mechanisms to ensure coherence between activities envisaged under the local development strategies, the "Cooperation" measure referred to in Article 35, and the "Basic services and village renewal in rural areas" measure referred to in Article 20 including urban-rural links;
(n)the actions taken to involve the partners referred to in Article 5 of Regulation (EU) No 1303/2013 and a summary of the results of the consultation of the partners;
(o)where applicable, the structure of the national rural network as referred to in Article 54(3), and provisions for its management, which would constitute the basis for its annual actions plans.
F542.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F553.The appropriate authority may make regulations laying down rules for the presentation of the elements described in paragraph 1 in rural development programmes.]
Extent Information
E5This version of this provision applies to England only; separate versions have been created for Wales and Northern Ireland and Scotland
Textual Amendments
F39Art. 8(1)(a) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
F40Word in Art. 8(1) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)
F41Words in Art. 8(1)(c)(ii) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iii)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F42Words in Art. 8(1)(c)(iv) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iii)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F43Words in Art. 8(1)(d) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iv)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F44Words in Art. 8(1)(d) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(iv)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F45Art. 8(1)(e) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(v); 2020 c. 1, Sch. 5 para. 1(1)
F46Words in Art. 8(1)(g) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vi); 2020 c. 1, Sch. 5 para. 1(1)
F47Substituted by Regulation (EU) 2020/2220 of the European Parliament and of the Council of 23 December 2020 laying down certain transitional provisions for support from the European Agricultural Fund for Rural Development (EAFRD) and from the European Agricultural Guarantee Fund (EAGF) in the years 2021 and 2022 and amending Regulations (EU) No 1305/2013, (EU) No 1306/2013 and (EU) No 1307/2013 as regards resources and application in the years 2021 and 2022 and Regulation (EU) No 1308/2013 as regards resources and the distribution of such support in respect of the years 2021 and 2022
F48Words in Art. 8(1)(h) substituted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(vii)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F49Words in Art. 8(1)(h)(i) substituted (E.) (1.1.2024) by The Agriculture (Delinked Payments and Consequential Provisions) (England) Regulations 2023 (S.I. 2023/1430), reg. 1(2)(a), Sch. 4 para. 1(3)
F50Words in Art. 8(1)(h)(ii) omitted (E.N.I.) (22.7.2022) by virtue of The Common Agricultural Policy (Cross-Compliance Exemptions and Transitional Regulation) (Amendment) (EU Exit) Regulations 2022 (S.I. 2022/861), regs. 1(2), 3(2)
F51Art. 8(1)(l) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(viii); 2020 c. 1, Sch. 5 para. 1(1)
F52Words in Art. 8(1)(m)(i) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ix)(aa); 2020 c. 1, Sch. 5 para. 1(1)
F53Words in Art. 8(1)(m)(iv) substituted (31.12.2020) by The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(a)(ix)(bb); 2020 c. 1, Sch. 5 para. 1(1)
F54Art. 8(2) omitted (31.12.2020) by virtue of The Rural Development (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/764), regs. 1, 4(3)(b); 2020 c. 1, Sch. 5 para. 1(1)
F55Art. 8(3) substituted (31.12.2020) by The Agriculture (Legislative Functions) (EU Exit) Regulations 2019 (S.I. 2019/748), regs. 1, 51; 2020 c. 1, Sch. 5 para. 1(1)
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: