1. Introductory Text

  2. Article 1.Subject matter

  3. Article 2.Scope

  4. Article 3.Update and reporting on technical documents

  5. Article 4.Compliance with networks in non-EU countries

  6. Article 5.Implementation

  7. Article 6.Repeal

  8. Article 7.Entry into force and application

  9. Signature

    1. ANNEX

      1. 1. INTRODUCTION

        1. 1.1. Abbreviations

        2. 1.2. Reference Documents

        3. 1.3. Technical scope

        4. 1.4. Geographical Scope

        5. 1.5. Content of this TAF TSI

      2. 2. DEFINITION OF SUBSYSTEM AND SCOPE

        1. 2.1. Function within the scope of the TSI

        2. 2.2. Functions outside the scope of the TSI

        3. 2.3. Overview of the subsystem description

          1. 2.3.1. Involved Entities

          2. 2.3.2. Considered Processes

          3. 2.3.3. General remarks

      3. 3. ESSENTIAL REQUIREMENTS

        1. 3.1. Compliance with the essential requirements

        2. 3.2. Essential requirements aspects

        3. 3.3. Aspects relating to general requirements

          1. 3.3.1. Safety

          2. 3.3.2. Reliability and availability

          3. 3.3.3. Health

          4. 3.3.4. Environmental protection

          5. 3.3.5. Technical compatibility

        4. 3.4. Aspects relating specifically to the Telematics Applications Subsystem for Freight...

          1. 3.4.1. Technical compatibility

          2. 3.4.2. Reliability and availability

          3. 3.4.3. Health

          4. 3.4.4. Safety

      4. 4. CHARACTERISATION OF THE SUBSYSTEM

        1. 4.1. Introduction

        2. 4.2. Functional and technical specifications of the subsystem

          1. 4.2.1. Consignment Note data

            1. 4.2.1.1. Customer Consignment Note

            2. 4.2.1.2. Consignment orders

          2. 4.2.2. Path Request

            1. 4.2.2.1. Preliminary remarks

            2. 4.2.2.2. Path Request message

            3. 4.2.2.3. Path Details message

            4. 4.2.2.4. Path Confirmed message

            5. 4.2.2.5. Path Details Refused message

            6. 4.2.2.6. Path Cancelled message

            7. 4.2.2.7. Path Not Available message

            8. 4.2.2.8. Receipt Confirmation message

          3. 4.2.3. Train Preparation

            1. 4.2.3.1. General Remarks

            2. 4.2.3.2. Train Composition message

            3. 4.2.3.3. Train Ready message

          4. 4.2.4. Train Running Forecast

            1. 4.2.4.1. General Remarks

            2. 4.2.4.2. Train Running Forecast message

            3. 4.2.4.3. Train Running Information message and Train Delay Cause Message.

          5. 4.2.5. Service Disruption Information

            1. 4.2.5.1. General Remarks

            2. 4.2.5.2. Train Running Interruption message

          6. 4.2.6. Shipment ETI/ETA

            1. 4.2.6.1. Preliminary remark

            2. 4.2.6.2. ETI/ETA calculation

            3. 4.2.6.3. Wagon ETI/ETA message

            4. 4.2.6.4. Alert message

          7. 4.2.7. Wagon Movement

            1. 4.2.7.1. Preliminary Remarks

            2. 4.2.7.2. Wagon Release Notice message

            3. 4.2.7.3. Wagon Departure Notice message

            4. 4.2.7.4. Wagon Yard Arrival message

            5. 4.2.7.5. Wagon Yard Departure message

            6. 4.2.7.6. Wagon Exception message

            7. 4.2.7.7. Wagon Arrival Notice message

            8. 4.2.7.8. Wagon Delivery notice message

          8. 4.2.8. Interchange Reporting

            1. 4.2.8.1. Preliminary remark

            2. 4.2.8.2. Wagon Interchange Notice message

            3. 4.2.8.3. Wagon Interchange Sub Notice message

            4. 4.2.8.4. Wagon Received at Interchange message

            5. 4.2.8.5. Wagon Refused at Interchange message

          9. 4.2.9. Data Exchange for Quality Improvement

          10. 4.2.10. The Main Reference Data

            1. 4.2.10.1. Preface

            2. 4.2.10.2. The Rolling Stock Reference Databases

            3. 4.2.10.3. The Rolling Stock Operational Data

          11. 4.2.11. Various Reference Files and Databases

            1. 4.2.11.1. Reference Files

            2. 4.2.11.2. Other Databases

              1. Wagon and Intermodal unit Operational Database

              2. Wagon Trip Plan Databases

                1. Remark:

            3. 4.2.11.3. Additional Requirements on the Databases

              1. Remarks:

          12. 4.2.12. Networking & Communication

            1. 4.2.12.1. General Architecture

            2. 4.2.12.2. Network

            3. 4.2.12.3. Security

            4. 4.2.12.4. Encryption

            5. 4.2.12.5. Central Repository

            6. 4.2.12.6. Common Interface

        3. 4.3. Functional and technical specifications of the interfaces

          1. 4.3.1. Interfaces with the TSI Infrastructure

          2. 4.3.2. Interfaces with the TSI Control/Command and Signalling

          3. 4.3.3. Interfaces with the rolling stock subsystem

          4. 4.3.4. Interfaces with the TSI operation and traffic management

          5. 4.3.5. Interfaces with the Telematics Applications for Passenger Services

        4. 4.4. Operating rules

          1. 4.4.1. Data quality

            1. Accuracy:

            2. Completeness:

            3. Consistency:

            4. Timeliness:

            5. Data quality Metrics

          2. 4.4.2. Operating the central repository

        5. 4.5. Maintenance rules

        6. 4.6. Professional qualifications

        7. 4.7. Health and safety conditions

      5. 5. INTEROPERABILITY CONSTITUENTS

        1. 5.1. Definition

        2. 5.2. List of Constituents

        3. 5.3. Constituents' Performances and Specifications

      6. 6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS...

        1. 6.1. Interoperability Constituents

          1. 6.1.1. Assessment Procedures

          2. 6.1.2. Module

          3. 6.1.3. Subsystem Telematics Applications for Freight

      7. 7. IMPLEMENTATION

        1. 7.1. Modalities of Application of this TSI

          1. 7.1.1. Introduction

          2. 7.1.2. Phase one — detailed IT specifications and master plan

          3. 7.1.3. Phases 2 and 3 — Development and deployment

          4. 7.1.4. Governance, roles and responsibilities

            1. The Steering Committee

            2. The Stakeholders

            3. The Representative Bodies

        2. 7.2. Change Management

          1. 7.2.1. Change Management Process

          2. 7.2.2. Specific Change Management Process for documents listed in Appendix I...

      8. Appendix I

        1. List of technical documents

      9. Appendix II

        Glossary

      10. Appendix III

        Tasks to be undertaken by the TAF/TAP National Contact Point (NCP)

        1. (1) Act as point of contact between ERA, the TAF/TAP Steering...

        2. (2) Communicate the concerns and issues of the railway players in...

        3. (3) Liaise with the Member State Railway Interoperability and Safety Committee...

        4. (4) The Member State ensures that all licensed Railway Undertakings and...

        5. (5) To the extent that railway players in the Member State...

        6. (6) Work with the Member State to ensure that an entity...

        7. (7) Facilitate information sharing between the Member States' railway players (Infrastructure...